591 resultados para Construction Grammar
Resumo:
Client-side project manager face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation undera successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest the motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisation throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
A key issue in the economic development and performance of organizations is the existence of standards. Their definition and control are sources of power and it is important to understand their concept, as it gives standards their direction and their legitimacy, and to explore how they are represented and applied. The difficulties posed by classical micro-economics in establishing a theory of standardization that is compatible with its fundamental axiomatic are acknowledged. We propose to reconsider the problem by taking the opposite perspective in questioning its theoretical base and by reformulating assumptions about the independent and autonomous decisions taken by actors. The Theory of Conventions will offer us a theoretical framework and tools enabling us to understand the systemic dimension and dynamic structure of standards. These will be seen as a special case of conventions. This work aims to provide a sound basis and promote a better consciousness in the development of global project management standards. It aims also to emphasize that social construction is not a matter of copyright but a matter of open minds, collective cognitive process and freedom for the common wealth.
Resumo:
A key issue for the economic development and for performance of organizations is the existence of standards. As their definitions and control are source of power, it seems to be important to understand the concept and to wonder about the representations authorized by the concept which give their direction and their legitimacy. The difficulties of classical microeconomics of establishing a theory of standardisation compatible with its fundamental axiomatic are underlined. We propose to reconsider the problem by carrying out the opposite way: to question the theoretical base, by reformulating assumptions on the autonomy of the choice of the actors. The theory of conventions will offer us both a theoretical framework and tools, enabling us to understand the systemic dimension and dynamic structure of standards seen as special case of conventions. This work aims thus to provide a sound basis and promote a better consciousness in the development of global project management standards, aiming also to underline that social construction is not a matter of copyright but a matter of open minds, collective cognitive process and freedom for the common wealth.
Resumo:
Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.
Resumo:
This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now also being undertaken within the construction sector. This paper discusses three recent interlocked projects undertaken in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions (SCP's) across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of SCP's (n=11) and safety management tasks (SMTs; n=39); mapped the process steps for their acquisition and development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined potential organisational cultural outcomes from a successful implementation of the framework. The second project extended this research to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies and to assist them to customise their own competency framework and implementation guidelines to match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and SMT's, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that industry engaged collaborative safety culture research has many potential benefits for the construction industry.
Resumo:
Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.
Resumo:
This book is an empirical study of strategic management practices in the construction industry. It examines the dynamic capabilities paradigm within the context of the Indonesian construction industry. The characteristics of asset-capability combinations were found to be significant determinants of the competitive advantage of the Indonesian construction enterprises, and that such advantage sequentially contributes to organizational performance. In doing so, this study fills an important gap in the empirical literature and reinforces the dynamic capabilities framework’s recognition as a rigorous theory of strategic management. As the dynamic capabilities framework can work in the context of Indonesia, it suggests that the framework has potential applicability in other emerging and developing countries
Resumo:
Evidence from the infrastructure and building sectors suggests issues of drugs and alcohol and its association with safety risk on construction sites. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance on how to effectively and efficiently address such an issue. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients, unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. A study to address these issues has three key objectives. Firstly, using the standard World Health Organisation Alcohol Use Disorders Identification Test (AUDIT), and a wide ranging set of structured interviews, a national qualitative and quantitative assessment of the use of drugs and alcohol is being undertaken. Secondly, the development of an appropriate industry policy with an adoption of an educative and rehabilitative approach is planned in consultation with employers and employees across the infrastructure and building sectors, with an aim of national adoption. Finally, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. The study outcomes stand to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This presentation will provide an analysis and discussion of the data collected in objective 1 and how the final results will inform the subsequent phases of the study.
Resumo:
The main aim of this paper is to outline a proposed program of research which will attempt to quantify the extent of the problem of alcohol and other drugs in the Australian construction industry, and furthermore, develop an appropriate industry-wide policy and cultural change management program and implementation plan to address the problem. This paper will also present preliminary results from the study. The study will use qualitative and quantitative methods (in the form of interviews and surveys, respectively) to evaluate the extent of the problem of alcohol and other drug use in this industry, to ascertain the feasibility of an industry-wide policy and cultural change management program, and to develop an appropriate implementation plan. The study will be undertaken in several construction organisations, at selected sites in South Australia, Victoria and Northern Territory. It is anticipated that approximately 500 employees from the participating organisations across Australia will take part in the study. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) will be used to measure the extent of alcohol use in the industry. Illicit drug use, ‘‘readiness to change’’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding workplace AOD impairment, will also be measured through a combination of interviews and surveys. Among the preliminary findings, for 51% (n=127) of respondents, score on the AUDIT indicated alcohol use at hazardous levels. Of the respondents who were using alcohol at hazardous levels, 76% reported (n97) that they do not have a problem with drinking and 54% (n=68) reported that it would be easy to ‘‘cut down’’ or stop drinking. Nearly half (49%) of all respondents (n=122) had used marijuana/cannabis at some time prior to being surveyed. The use of other illicit substances was much less frequently reported. Preliminary interview findings indicated a lack of adequate employee knowledge regarding the physical effects of alcohol and other drugs in the workplace. As for conclusions, the proposed study will address a major gap in the literature with regard to the extent of the problem of alcohol and other drug use in the construction industry in Australia. The study will also develop and implement a national, evidence-based workplace policy, with the aim of mitigating the deleterious effects of alcohol and other drugs in this industry.
Resumo:
Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.
Resumo:
Hong Kong in summer (June - October) is hot and humid. Construction workers have to undertake physically demanding activities and often in confined spaces. They are vulnerable to heat stress in summer hence health and safety measures associated to heat stress measured by scientific and clinical parameters are urgently needed. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR. The aim of this study is to develop a set of indices measured by clinical and scientific methods to detect impending attacks of heat stress. These indices would be of tremendous value in better safeguarding workers’ health and safety by reducing the occurrences of heat stress on site. This paper firstly reports on the statistics of construction incidents arising from heat stress. Qualitative and quantitative research methods applied in conducting the research are discussed. It is believed that the construction industry and the government would benefit a lot as a result of this study.
Resumo:
This paper investigates the policies and instruments adopted in Hong Kong to control the carbon emissions of construction facilities, including the whole building life cycle: production of material stage, construction stage, operation stage and demolition stage. This commences with a literature review comparing activities world-wide to those in Hong Kong to identify the main issues at stake, followed by a report on a series of local interviews to evaluate the present situation in Hong Kong, as well as future opportunities for local carbon mitigation. The interviewees included practitioners from engineering contracting firms, consulting firms, clients and energy provider, together with two university experts and a counsellor. A small case study is also provided of a building project in Hong Kong to illustrate some of the innovative design aspects being incorporated into buildings in Hong Kong as a result of the current emphasis on sustainability. The paper concludes with a summary of main findings and proposals for improvement in policy related to carbon mitigation and building sustainability in Hong Kong.
Resumo:
Construction firms are increasingly utilizing information technologies to better manage geographically dispersed projects. Often these technologies involve changes to existing working practices and processes and are viewed as disruptive by members of the organization. Understanding the factors that can influence individuals’ intention to utilize technology can assist managers to implement strategies to increase and improve the uptake of technologies and improve the innovation adoption process. Using a case study organization, factors identified in the Unified Theory of Acceptance and Use of Technology (UTAUT) are examined and the UTAUT is extended and by including resistance to change and top management support. The findings indicate effort expectancy, internal facilitating conditions and top management support all influence individuals’ intention to use information technology. The results also show that resistance to change or fear of change does not always play a role in innovation adoption. The findings reinforce the need to support new technologies from both a managerial and technical perspective.