431 resultados para Construction Management, Employees, Job Performance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction delay has been a protracted problem for the Malaysian construction industry. Recent report showed that 80% of public sector projects are behind schedule. This underachieving time performance has led to many problems including public complaints, loss of reputation and revenue for the government and a slump in the industry’s GDP contribution. Research in the area of project delay has mushroomed worldwide with attempts to place mitigation plans, but delay remains a global phenomenon. There is now an urgent need for revolutionizing construction practices and past research, backed up with few successful cases suggests that Supply Chain Management (SCM) could prove beneficial to reduce or eliminate delays in construction. SCM which originated from the automotive manufacturing industry promotes a more collaborative approach to construction management and has recently gained attention of the construction industry. However every country, including Malaysia, would certainly have disparities of their own compared to others being it from the cultural point of view, nature of problems, locality or improvements needed. Therefore, this paper will present part of a Ph.D. research which aims at illustrating the Malaysian construction industry experts’ perception of the Malaysian public sector project delay, provide insight into these dilemmas, highlights the problems with current practices, its effects and the improvements needed. Subsequently, this paper would propose ratification to the problems using SCM. A semi-structured interview has been conducted to practitioners with at least 20 years’ experience in the industry. The findings showed that Malaysia may be unique compared to other countries and that by considering a number of additional factors, SCM could prove beneficial to increase efficiency of the Malaysian public sector projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The complex supply chain relations of the construction industry, coupled with the substantial amount of information to be shared on a regular basis between the parties involved, make the traditional paper-based data interchange methods inefficient, error prone and expensive. The successful information technology (IT) applications that enable seamless data interchange, such as the Electronic Data Interchange (EDI) systems, have generally failed to be successfully implemented in the construction industry. An alternative emerging technology, Extensible Markup Language (XML), and its applicability to streamline business processes and to improve data interchange methods within the construction industry are analysed, as is the EDI technology to identify the strategic advantages that XML technology provides to overcome the barriers to implementation. In addition, the successful implementation of XML-based automated data interchange platforms for a large organization, and the proposed benefits thereof, are presented as a case study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Repair, maintenance, minor alteration, and addition work (RMAA) has become more and more important in developed societies, but its safety performance is alarming. For example, RMAA projects accounted for 53.2% of the total construction market and the percentage of RMAA accidents to all construction accidents in the Hong Kong Special Administrative Region (HKSAR) increased considerably in 2007. The RMAA sector has a huge potential for safety improvement. This study aims to explore and evaluate the difficulties of implementing safety practices in RMAA work. The mixed methods approach was adopted, and semistructured interviews and a two-round Delphi survey were conducted for the data collection. Major difficulties were identified, including limited safety resources for small and medium enterprises (SMEs), difficulty in changing the mindset of RMAA workers, and difficulty in performing safety supervision. These obstacles for implementing safety practices in the RMAA sector, if successfully removed, could significantly improve the safety performance of the RMAA sector and the construction industry as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Subcontractors contribute significantly to construction projects and their performance can seriously affect over-all project success. It is crucial, therefore, to appraise the performance of subcontractors to ensure they satisfy the client's expectations and project requirements. To increase the transparency and accuracy of subcontractor appraisal, the baseline and target performance levels should be set at the outset so that the appraisers and those being appraised realize exactly what standards are to be achieved. The balanced scorecard, being a powerful tool for performance appraisal, offers a potentially good approach for modeling the subcontractor appraisal process. In this paper, an approach to developing a balanced scorecard subcontractor appraisal model is proposed and demonstrated through a questionnaire survey administered in Hong Kong and from which the baseline and target performance levels for large-scale skilled subcontractors are identified. A case example is used to illustrate the operation of the model. Finally, a means by which the model may be validated is demonstrated through the use of field experts. The results demonstrate the feasibility of developing a balanced scorecard model that can help improve the transparency of subcontractor appraisal despite the baseline and target performance levels changing according to the project characteristics, subcontractor categories and size.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Transition zones between bridge decks and rail tracks suffer early failure due to poor interaction between rail vehicles and sudden changes of stiffness. This has been an ongoing problem to rail industry and yet still no systematic studies appear to have been taken to maintain a gradually smoothening transmission of forces between the bridge and its approach. Differential settlement between the bridge deck and rail track in the transition zone is the fundamental issue, which negatively impacts the rail industry by causing passenger discomfort, early damage to infrastructure and vehicle components, speed reduction, and frequent maintenance cycles. Identification of mechanism of the track degradation and factors affecting is imperative to design any mitigation method for reducing track degradation rate at the bridge transition zone. Unfortunately this issue is still not well understood, after conducting a numbers of reviews to evaluate the key causes, and introducing a wide range of mitigation techniques. In this study, a comprehensive analysis of the available literature has been carried out to develop either a novel design framework or a mitigation technique for the bridge transition zone. This paper addresses three critical questions in relation to the track degradation at transition zone: (1) what are the causes of bridge transition track degradation?; (2) what are the available mitigation techniques in reducing the track degradation rate?; (3) what are the factors affecting on poor performance of the existing mitigation techniques?. It is found that the absence of soil-water response, dynamic loading response, and behaviour of geotechnical characteristics under long-term conditions in existing track transition design frameworks critically influence on the failures of existing mitigation techniques. This paper also evaluates some of the existing design frameworks to identify how each design framework addresses the track degradation at the bridge transition zone.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Highway construction projects have direct impacts on adjacent businesses. The nature and the degree of impact depend on individual business characterization and project specific factors. The type of business is also a relevant factor in predicting the impact of transportation construction projects. This paper presents the results of research focused on developing an in-depth understanding of these relationships. The study includes project case studies of three transportation construction projects in Florida. Surveys were conducted with all adjacent businesses, which were combined with analyses of the business accommodation procedures employed by State Highway Agencies (SHAs) nationwide to provide measure the efficiency of present rules. The results include an analysis of differing priorities for different classification of businesses and development of design and construction management best practices to better accommodate businesses during highway construction. A pilot project that employed business accommodation principles devised in this research, and improvements to business accommodations observed were compared to cases where no measures were taken.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose My aim is to introduce, in the project management field, an Aristotelian ethics lens moving beyond the classical deontological and consequentialism approaches underlying the current ethical practices and codes of ethics and professional conducts. In doing so, I wish to pose the premises of a debate on the implications of a conscious ethical perspective for the structure and agency relationship within the project management field Design/methodology/approach Project management is a knowledge field on its own right. However the current perspectives applied to make sense and develop the field (modernism vs. postmodernism) leads to dichotomous thinking rather than recognizing the merits and contextual validity of both sides. I call for Aristotelian Ethics as a way of moving beyond this dichotomous thinking. I introduce briefly Aristotelian Ethics and its consequences in term of relation theory – practice, means and ends, facts and values, and finally politics (i.e. being part of a community of practitioners). Then I illustrate some consequences for the field taking PMI Code of Ethics and Professional Conduct and APM Code of Professional Conduct as supports for discussion Findings I suggest a need for revisiting and/or redesigning the codes of ethics and professional conducts for project management according to an Aristotelian perspective, in order to move beyond the normative limitations of classical deontological (conflict between competing duties, exemplified by PMI Code) or consequentialism (focusing on the "right" outcome to the detriment of duties, exemplified by APM Code) approaches (both, in fact, leading to a disconnection means and ends, and facts and values). This implicates shifting our view from the question "what is my duty?" to the questions "why should I undertake my duty?" and "how ought I act in this situation?" Practical implications Raising Professional Bodies, Industry and Education institutions awareness and consciousness and leading them to rethink about codes of ethics and the implications for the way they conceive practice and research, bodies of knowledge, credentialing, education... Originality/value To the best of my knowledge, this kind of discussion has not yet been conducted within the project management field, and considering the implication of project management in our life and for the well being of the society, an ethical debate may present some value(s)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The productivity of the construction industry has a significant effect on national economic growth. Gains from higher construction productivity flow through the economy, as all industries rely on construction to some extent as part of their business investment. Contractions and expansions of economic activity are common phenomena in an economy. Three construction cycles occurred between the years 1970 and 2011 in Malaysia. The relationships between construction productivity and economic development are examined by the partial correlation method to establish the underlying factors driving the change in construction productivity. Construction productivity is statistically significantly correlated with gross domestic product (GDP) per capita in a positive direction for the 1985–98 and 1998–2009 cycles, but not the 1970–85 cycle. Fluctuations in construction activities and the influx of foreign workers underlie the changes of construction productivity in the 1985–98 cycle. There was less fluctuation in construction activities in the 1998–2009 cycle, with changes being mainly due to the fiscal stimulation policies of the government in attempting to stabilize the economy. The intensive construction of mega-projects resulted in resource constraints and cost pressures during the 1980s and 1990s. A better management of the ‘boom-bust’ nature of the construction business cycle is required to maintain the capability and capacity of the industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Research problem: Overfitting and collinearity problems commonly exist in current construction cost estimation applications and obstruct researchers and practitioners in achieving better modelling results. Research objective and method: A hybrid approach of Akaike information criterion (AIC) stepwise regression and principal component regression (PCR) is proposed to help solve overfitting and collinearity problems. Utilization of this approach in linear regression is validated by comparing it with other commonly used approaches. The mean square error obtained by leave-one-out cross validation (MSELOOCV) is used in model selection in deciding predictive variables.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this research Agency Theory and Stewardship Theory are used to analyse the relative performance of different forms of privitisation of water infrastructure and in doing so enriches understanding of previously underdeveloped aspects of both theories. The prior Agency Theory literature had established assumptions about the behaviour of principals and agents in contracts and these were found not to be correct in the context of contracts between modern government and private organisations. Agency theory was extended to include steward-like behaviour of an agent and Stewardship Theory was developed by the identification of factors within the contractual relationship which promote the sense of responsibility to the principal. The alliance, joint venture and Build Own Operate Transfer (BOOT) forms of privatisation were found to achieve stewardship of the infrastructure.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Office building retrofit is a sector being highlighted in Australia because of the mature office building market characterised by a large proportion of ageing properties. The increasing number of office building retrofit projects strengthens the need for waste management. Retrofit projects possess unique characteristics in comparison to traditional demolition and new builds such as partial operation of buildings, constrained site spaces and limited access to as-build information. Waste management activities in retrofit projects can be influenced by issues that are different from traditional construction and demolition projects. However, previous research on building retrofit projects has not provided an understanding of the critical issues affecting waste management. This research identifies the critical factors which influence the management of waste in office building retrofit projects through a literature study and a questionnaire survey to industry practitioners. Statistical analysis on a range of potential waste issues reveals the critical factors, as agreed upon by survey respondents in consideration of their different professional responsibilities and work natures. The factors are grouped into five dimensions, comprising industry culture, organisational support and incentive, existing building information, design, and project delivery process. The discussions of the dimensions indicate that the waste management factors of office building retrofit projects are further intensified compared to those for general demolition and construction because retrofit projects involve existing buildings which are partially operating with constrained work space and limited building information. Recommendations for improving waste management in office building retrofit projects are generalised such as waste planning, auditing and assessment in the planning and designing stage, collaboration and coordination of various stakeholders and different specialists, optimised building surveying and BIM technologies for waste analysis, and new design strategies for waste prevention.