275 resultados para reconfigurable infrastructure
Resumo:
Presentation by Dr Joe Young, ITS-HPC and Research Support, Managing your research data seminar, 2012
Resumo:
The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.
Computation of ECG signal features using MCMC modelling in software and FPGA reconfigurable hardware
Resumo:
Computational optimisation of clinically important electrocardiogram signal features, within a single heart beat, using a Markov-chain Monte Carlo (MCMC) method is undertaken. A detailed, efficient data-driven software implementation of an MCMC algorithm has been shown. Initially software parallelisation is explored and has been shown that despite the large amount of model parameter inter-dependency that parallelisation is possible. Also, an initial reconfigurable hardware approach is explored for future applicability to real-time computation on a portable ECG device, under continuous extended use.
Resumo:
A procurement decision-making model is developed based on a novel integration of leading-edge microeconomic theory and empirically tested in major road and health projects. The model provides a more reliable approach to identifying projects suited to Public-Private-Partnerships (PPPs) and it is expected that the model will enable government to deliver improved value-for-money from their portfolio of PPP projects.
Resumo:
The built environment has a profound impact on our natural environment, economy, health and productivity. As the majority of the people spent most of their time inside buildings, the environment in which they perform their daily activities will have an impact on their health and productivity. Studies have been conducted about the negative impacts of presence of non-favorable conditions to human health and well being. The term "Sick Building Syndrome" (SBS) is used to describe situations in which building occupants experience acute health and comfort problems that appear to be linked to their time spent in a building. Sustainable infrastructure rating systems have requirements intended to improve occupant productivity and health.While the impact of Sustainable Infrastructure in energy consumption and waste/water reduction can be measured using available tools, the impact on productivity remained as an assumption that is not clearly measured. The purpose of this research is to develop a framework to assess whether the impacts of the incorporation of features intended to improve occupants’ performance and health such as: increased ventilation, lightning and thermal comfort serve their intended purpose.
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
This study was conducted to assess the vulnerability of coastal road infrastructures due to climate change induced sea level rise and extreme weather conditions through the estimation of road subgrade strength reduction as a result of changes in soil moisture content. The study area located in the Gold Coast, Australia highlighted that the risk is significant. In wet seasons or areas with wet condition, the groundwater table is already high, so even a small change in the groundwater table can raise the risk of inundation; particularly, in areas with existing shallow groundwater. The predicted risk of a high groundwater table on road infrastructure is a long-term hazard. Therefore, there is time to undertake some management plans to decrease the possible risks, for instance, some deep root plants could be planted along the roads with a high level of risk, to decrease the groundwater table elevation.
Resumo:
Based on Dunning's dominant international business theory and the unique characteristics of construction, a novel framework is developed and tested to explain multinational contracting into Australia. Beyond contributions to theory, Australian governments now have clear evidence upon which to develop more effective procurement reform towards increasing the attractiveness of public sector major infrastructure projects and competition in this sector.
Resumo:
Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.
Resumo:
This study investigates potential demand for infrastructure investment for alternative fuel vehicles by applying stated preference methods to a Japanese sample. The potential demand is estimated on the basis of how much people are willing to pay for alternative fuel vehicles under various refueling scenarios. Using the estimated parameters, the economic efficiency of establishing battery-exchange stations for electric vehicles is examined. The results indicate that infrastructural development of battery-exchange stations can be efficient when electric vehicle sales exceed 5.63% of all new vehicle sales. Further, we find a complementary relationship between the cruising ranges of alternative fuel vehicles and the infrastructure established.
Resumo:
Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.
Resumo:
It is reasonable to expect that Islamic project financing may be a suitable option of infrastructure financing in Indonesia. This research explored the conditions necessary for the implementation of Islamic project financing for Indonesian infrastructure development. It is important that all infrastructure project stakeholders understand the concept comprehensively. This study identified reforms through which the government could more directly support the implementation of Islamic project financing. This research has led to the realisation that Islamic project financing can be implemented in all sectors, in both public and private sector domains, and across Muslim and non-Muslim communities.
Resumo:
Large infrastructure projects are a major responsibility of urban and regional governments, who usually lack expertise to fully specify the demanded projects. Contractors, typically experts on such projects due to experience with similar projects,advise of the needed design as well as the cost of construction in their bids. Producing the right design is costly. We model such infrastructure projects taking into account their credence goods feature and the costly design effort they require and examine the performance of commonly used contracting methods. We show that when building costs are homogeneous and public information, simultaneous bidding involving shortlisting of two contractors and contingent compensation of both contractors on design efforts outperforms sequential search. If building costs are private information of the contractors and are revealed to them after design cost is sunk,sequential search may be superior to simultaneous bidding.
Resumo:
In this research Agency Theory and Stewardship Theory are used to analyse the relative performance of different forms of privitisation of water infrastructure and in doing so enriches understanding of previously underdeveloped aspects of both theories. The prior Agency Theory literature had established assumptions about the behaviour of principals and agents in contracts and these were found not to be correct in the context of contracts between modern government and private organisations. Agency theory was extended to include steward-like behaviour of an agent and Stewardship Theory was developed by the identification of factors within the contractual relationship which promote the sense of responsibility to the principal. The alliance, joint venture and Build Own Operate Transfer (BOOT) forms of privatisation were found to achieve stewardship of the infrastructure.