276 resultados para rail transit


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper investigates quality of service (QoS) and resource productivity implications of transit route passenger loading and travel time. It highlights the value of occupancy load factor as a direct passenger comfort QoS measure. Automatic Fare Collection data for a premium radial bus route in Brisbane, Australia, is used to investigate time series correlation between occupancy load factor and passenger average travel time. Correlation is strong across the entire span of service in both directions. Passengers tend to be making longer, peak direction commuter trips under significantly less comfortable conditions than off-peak. The Transit Capacity and Quality of Service Manual uses segment based load factor as a measure of onboard loading comfort QoS. This paper provides additional insight into QoS by relating the two route based dimensions of occupancy load factor and passenger average travel time together in a two dimensional format, both from the passenger’s and operator’s perspectives. Future research will apply Value of Time to QoS measurement, reflecting perceived passenger comfort through crowding and average time spent onboard. This would also assist in transit service quality econometric modeling. The methodology can be readily applied in a practical setting where AFC data for fixed scheduled routes is available. The study outcomes also provide valuable research and development directions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australia is the world’s third largest exporter of raw sugar after Brazil and Thailand, with around $2.0 billion in export earnings. Transport systems play a vital role in the raw sugar production process by transporting the sugarcane crop between farms and mills. In 2013, 87 per cent of sugarcane was transported to mills by cane railway. The total cost of sugarcane transport operations is very high. Over 35% of the total cost of sugarcane production in Australia is incurred in cane transport. A cane railway network mainly involves single track sections and multiple track sections used as passing loops or sidings. The cane railway system performs two main tasks: delivering empty bins from the mill to the sidings for filling by harvesters; and collecting the full bins of cane from the sidings and transporting them to the mill. A typical locomotive run involves an empty train (locomotive and empty bins) departing from the mill, traversing some track sections and delivering bins at specified sidings. The locomotive then, returns to the mill, traversing the same track sections in reverse order, collecting full bins along the way. In practice, a single track section can be occupied by only one train at a time, while more than one train can use a passing loop (parallel sections) at a time. The sugarcane transport system is a complex system that includes a large number of variables and elements. These elements work together to achieve the main system objectives of satisfying both mill and harvester requirements and improving the efficiency of the system in terms of low overall costs. These costs include delay, congestion, operating and maintenance costs. An effective cane rail scheduler will assist the traffic officers at the mill to keep a continuous supply of empty bins to harvesters and full bins to the mill with a minimum cost. This paper addresses the cane rail scheduling problem under rail siding capacity constraints where limited and unlimited siding capacities were investigated with different numbers of trains and different train speeds. The total operating time as a function of the number of trains, train shifts and a limited number of cane bins have been calculated for the different siding capacity constraints. A mathematical programming approach has been used to develop a new scheduler for the cane rail transport system under limited and unlimited constraints. The new scheduler aims to reduce the total costs associated with the cane rail transport system that are a function of the number of bins and total operating costs. The proposed metaheuristic techniques have been used to find near optimal solutions of the cane rail scheduling problem and provide different possible solutions to avoid being stuck in local optima. A numerical investigation and sensitivity analysis study is presented to demonstrate that high quality solutions for large scale cane rail scheduling problems are obtainable in a reasonable time. Keywords: Cane railway, mathematical programming, capacity, metaheuristics

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fatigue of the steel in rails continues to be of major concern to heavy haul track owners despite careful selection and maintenance of rails. The persistence of fatigue is due in part to the erroneous assumption that the maximum loads on, and stresses in, the rails are predictable. Recent analysis of extensive wheel impact detector data from a number of heavy haul tracks has shown that the most damaging forces are in fact randomly distributed with time and location and can be much greater than generally expected. Large- scale Monte-Carlo simulations have been used to identify rail stresses caused by actual, measured distributions of wheel-rail forces on heavy haul tracks. The simulations show that fatigue failure of the rail foot can occur in situations which would be overlooked by traditional analyses. The most serious of these situations are those where track is accessed by multiple operators and in situations where there is a mix of heavy haul, general freight and/or passenger traffic. The least serious are those where the track is carrying single-operator-owned heavy haul unit trains. The paper shows how using the nominal maximum axle load of passing traffic, which is the key issue in traditional analyses, is insufficient and must be augmented with consideration of important operational factors. Ignoring such factors can be costly.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Measures of transit accessibility are important in evaluating transit services, planning for future services and investment on land use development. Existing tools measure transit accessibility using averaged walking distance or walking time to public transit. Although the mode captivity may have significant implications on one’s willingness to walk to use public transit, this has not been addressed in the literature to date. Failed to distinguish transit captive users may lead to overestimated ridership and spatial coverage of transit services. The aim of this research is to integrate the concept of transit captivity into the analysis of walking access to public transit. The conventional way of defining “captive” and “choice” transit users showed no significant difference in their walking times according to a preliminary analysis. A cluster analysis technique is used to further divide “choice” users by three main factors, namely age group, labour force status and personal income. After eliminating “true captive” users, defined as those without driver’s licence or without a car in respective household, “non-true captive” users were classified into a total of eight groups having similar socio-economic characteristics. The analysis revealed significant differences in the walking times and patterns by their level of captivity to public transit. This paper challenges the rule-of-thumb of 400m walking distance to bus stops. In average, people’s willingness to walk dropped drastically at 268m and continued to drop constantly until it reached the mark of 670m, where there was another drastic drop of 17%, which left with only 10% of the total bus riders willing to walk 670m or more. This research found that mothers working part time were the ones with lowest transit captivity and thus most sensitive to the walking time, followed by high-income earners and the elderly. The level of captivity increases when public transit users earned lesser income, such as students and students working part time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aurizon, Australia's largest freight railway operator, is investigating the use of Rail Power Conditioner (RPC) technology for load balancing, reactive power compensation and harmonic filtering. The new technology has the capability of replacing Static VAr Compensators (SVC) and Harmonic Filters, and is expected to have a significant impact on the overall costs of railway electrification. This paper presents the theoretical analysis of the real and reactive power flows in an RPC used to balance active powers in an existing V/V feeder station. This informed an RPC feasibility study undertaken at four existing Aurizon's feeder stations with V/V connected transformers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The sugarcane transport system plays a critical role in the overall performance of Australia’s sugarcane industry. An inefficient sugarcane transport system interrupts the raw sugarcane harvesting process, delays the delivery of sugarcane to the mill, deteriorates the sugar quality, increases the usage of empty bins, and leads to the additional sugarcane production costs. Due to these negative effects, there is an urgent need for an efficient sugarcane transport schedule that should be developed by the rail schedulers. In this study, a multi-objective model using mixed integer programming (MIP) is developed to produce an industry-oriented scheduling optimiser for sugarcane rail transport system. The exact MIP solver (IBM ILOG-CPLEX) is applied to minimise the makespan and the total operating time as multi-objective functions. Moreover, the so-called Siding neighbourhood search (SNS) algorithm is developed and integrated with Sidings Satisfaction Priorities (SSP) and Rail Conflict Elimination (RCE) algorithms to solve the problem in a more efficient way. In implementation, the sugarcane transport system of Kalamia Sugar Mill that is a coastal locality about 1050 km northwest of Brisbane city is investigated as a real case study. Computational experiments indicate that high-quality solutions are obtainable in industry-scale applications.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A case study of Brisbane, the capital city of Queensland, Australia, explored how explicit measures of transit quality of service (e.g., service frequency, service span, and travel time ratio) and implicit environmental predictors (e.g., topographic grade factor) influenced bus ridership. The primary hypothesis tested was that bus ridership was higher in suburbs with high transit quality of service than in suburbs with limited service quality. Multiple linear regression, used to identify a strong positive relationship between route intensity (bus-km/h-km2) and bus ridership, indicated that both increased service frequency and spatial route density corresponded to higher bus ridership. Additionally, the travel time ratio (i.e., the ratio of in-vehicle transit travel time to in-vehicle automobile travel time) had a significant negative association with suburban ridership: transit use declined as travel time ratio increased. In contrast, topographic grade and service span did not significantly affect suburban bus ridership. The study findings enhance the fundamental understanding of traveler behavior, which is informative to urban transportation policy, planning, and provision.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In Australia, railway systems play a vital role in transporting the sugarcane crop from farms to mills. In this paper, a novel job shop approach is proposed to create a more efficient integrated harvesting and sugarcane transport scheduling system to reduce the cost of sugarcane transport. There are several benefits that can be attained by treating the train scheduling problem as a job shop problem. Job shop is generic and suitable for all trains scheduling problems. Job shop technique prevents operating two trains on one section at the same time because it considers that the section or the machine is unique. This technique is more promising to find better solutions in reasonable computation times.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stress- and strain-controlled tests of heat treated high-strength rail steel (Australian Standard AS1085.1) have been performed in order to improve the characterisation of the said material׳s ratcheting and fatigue wear behaviour. The hardness of the rail head material has also been studied and it has been found that hardness reduces considerably below four-millimetres from the rail top surface. Historically, researchers have used test coupons with circular cross-sections to conduct cyclic load tests. Such test coupons, typically five-millimetres in gauge diameter and ten‐millimetres in grip diameter, are usually taken from the rail head sample. When there is considerable variation of material properties over the cross-section it becomes likely that localised properties of the rail material will be missed. In another case from the literature, disks 47 mm in diameter for a twin-disk rolling contact test machine were obtained directly from the rail sample and used to validate ratcheting and rolling contact fatigue wear models. The question arises: How accurate are such tests, especially when large material property gradients exist? In this research paper, the effects of rail sampling location on the ratcheting behaviour of AS1085.1 rail steel were investigated using rectangular-shaped specimens obtained at four different depths to observe their respective cyclic plasticity behaviour. The microstructural features of the test coupons were also analysed, especially the pearlite inter-lamellar spacing which showed strong correlation with both hardness and cyclic plasticity behaviour of the material. This work ultimately provides new data and testing methodology to aid the selection of valid parameters for material constitutive models to better understand rail surface ratcheting and wear.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are 23,500 level crossings in Australia. In these types of environments it is important to understand what human factor issues are present and how road users and pedestrians engage with crossings. A series of on-site observations were performed over a 2-day period at a 3-track active crossing. This was followed by 52 interviews with local business owners and members of the public. Data were captured using a manual-coding scheme for recording and categorising violations. Over 700 separate road user and pedestrian violations were recorded, with representations in multiple categories. Time stamping revealed that the crossing was active for 59% of the time in some morning periods. Further, trains could take up to 4-min to arrive following its first activation. Many pedestrians jaywalked under side rails and around active boom gates. In numerous cases pedestrians put themselves at risk in order to beat or catch the approaching train, ignored signs to stop walking when the lights were flashing. Analysis of interview data identified themes associated with congestion, safety, and violations. This work offers insight into context specific issues associated with active level crossing protection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Because of the bottlenecking operations in a complex coal rail system, millions of dollars are costed by mining companies. To handle this issue, this paper investigates a real-world coal rail system and aims to optimise the coal railing operations under constraints of limited resources (e.g., limited number of locomotives and wagons). In the literature, most studies considered the train scheduling problem on a single-track railway network to be strongly NP-hard and thus developed metaheuristics as the main solution methods. In this paper, a new mathematical programming model is formulated and coded by optimization programming language based on a constraint programming (CP) approach. A new depth-first-search technique is developed and embedded inside the CP model to obtain the optimised coal railing timetable efficiently. Computational experiments demonstrate that high-quality solutions are obtainable in industry-scale applications. To provide insightful decisions, sensitivity analysis is conducted in terms of different scenarios and specific criteria. Keywords Train scheduling · Rail transportation · Coal mining · Constraint programming

Relevância:

10.00% 10.00%

Publicador: