Scheduling techniques to optimise sugarcane rail transport systems
Contribuinte(s) |
Kozan, Erhan |
---|---|
Data(s) |
30/09/2009
|
Resumo |
In Australia, railway systems play a vital role in transporting the sugarcane crop from farms to mills. In this paper, a novel job shop approach is proposed to create a more efficient integrated harvesting and sugarcane transport scheduling system to reduce the cost of sugarcane transport. There are several benefits that can be attained by treating the train scheduling problem as a job shop problem. Job shop is generic and suitable for all trains scheduling problems. Job shop technique prevents operating two trains on one section at the same time because it considers that the section or the machine is unique. This technique is more promising to find better solutions in reasonable computation times. |
Formato |
application/pdf application/pdf |
Identificador | |
Relação |
http://eprints.qut.edu.au/94339/1/asor2009_64.pdf http://eprints.qut.edu.au/94339/7/94339.pdf Masoud, Mahmoud, Kozan, Erhan, & Kent, Geoff (2009) Scheduling techniques to optimise sugarcane rail transport systems. In Kozan, Erhan (Ed.) 20th National Conference of Australian Society for Operations Research & the 5th International Intelligent Logistics System Conference, 27-30 September 2009, Gold Coast, QLD. |
Direitos |
Copyright 2009 [please consult the author] |
Fonte |
School of Mathematical Sciences; Science & Engineering Faculty |
Palavras-Chave | #Scheduling #Optimisation #Rail #Cane |
Tipo |
Conference Paper |