623 resultados para market power
Resumo:
High reliability of railway power systems is one of the essential criteria to ensure quality and cost-effectiveness of railway services. Evaluation of reliability at system level is essential for not only scheduling maintenance activities, but also identifying reliability-critical components. Various methods to compute reliability on individual components or regularly structured systems have been developed and proven to be effective. However, they are not adequate for evaluating complicated systems with numerous interconnected components, such as railway power systems, and locating the reliability critical components. Fault tree analysis (FTA) integrates the reliability of individual components into the overall system reliability through quantitative evaluation and identifies the critical components by minimum cut sets and sensitivity analysis. The paper presents the reliability evaluation of railway power systems by FTA and investigates the impact of maintenance activities on overall reliability. The applicability of the proposed methods is illustrated by case studies in AC railways.
Resumo:
This paper discusses a new paradigm of real-time simulation of power systems in which equipment can be interfaced with a real-time digital simulator. In this scheme, one part of a power system can be simulated by using a real-time simulator; while the other part is implemeneted as a physical system. The only interface of the physical system with the computer-based simulator is through data-acquisition system. The physical system is driven by a voltage-source converter (VSC)that mimics the power system simulated in the real-time simulator. In this papar, the VSC operates in a voltage-control mode to track the point of common coupling voltage signal supplied by the digital simulator. This type of splitting a network in two parts and running a real-time simulation with a physical system in parallel is called a power network in loop here. this opens up the possibility of study of interconnection o f one or several distributed generators to a complex power network. The proposed implementation is verified through simulation studies using PSCAD/EMTDC and through hardware implementation on a TMS320G2812 DSP.
Resumo:
In an open railway access market price negotiation, it is feasible to achieve higher cost recovery by applying the principles of price discrimination. The price negotiation can be modeled as an optimization problem of revenue intake. In this paper, we present the pricing negotiation based on reinforcement learning model. A negotiated-price setting technique based on agent learning is introduced, and the feasible applications of the proposed method for open railway access market simulation are discussed.
Resumo:
A schedule coordination problem involving two train services provided by different operators is modeled as an optimization of revenue intake. The coordination is achieved through the adjustment of commencement times of the train services by negotiation. The problem is subject to constraints regarding to passenger demands and idle costs of rolling-stocks from both operators. This paper models the operators as software agents having the flexibility to incorporate one of the two (and potentially more) proposed negotiation strategies. Empirical results show that agents employing different combination of strategies have significant impact on the quality of solution and negotiation time.
Resumo:
Fault tree analysis (FTA) is presented to model the reliability of a railway traction power system in this paper. First, the construction of fault tree is introduced to integrate components in traction power systems into a fault tree; then the binary decision diagram (BDD) method is used to evaluate fault trees qualitatively and quantitatively. The components contributing to the reliability of overall system are identified with their relative importance through sensitivity analysis. Finally, an AC traction power system is evaluated by the proposed methods.
Resumo:
The Streaming SIMD extension (SSE) is a special feature embedded in the Intel Pentium III and IV classes of microprocessors. It enables the execution of SIMD type operations to exploit data parallelism. This article presents improving computation performance of a railway network simulator by means of SSE. Voltage and current at various points of the supply system to an electrified railway line are crucial for design, daily operation and planning. With computer simulation, their time-variations can be attained by solving a matrix equation, whose size mainly depends upon the number of trains present in the system. A large coefficient matrix, as a result of congested railway line, inevitably leads to heavier computational demand and hence jeopardizes the simulation speed. With the special architectural features of the latest processors on PC platforms, significant speed-up in computations can be achieved.
Resumo:
Streaming SIMD Extensions (SSE) is a unique feature embedded in the Pentium III and P4 classes of microprocessors. By fully exploiting SSE, parallel algorithms can be implemented on a standard personal computer and a theoretical speedup of four can be achieved. In this paper, we demonstrate the implementation of a parallel LU matrix decomposition algorithm for solving power systems network equations with SSE and discuss advantages and disadvantages of this approach.
Resumo:
Streaming SIMD Extensions (SSE) is a unique feature embedded in the Pentium III class of microprocessors. By fully exploiting SSE, parallel algorithms can be implemented on a standard personal computer and a theoretical speedup of four can be achieved. In this paper, we demonstrate the implementation of a parallel LU matrix decomposition algorithm for solving power systems network equations with SSE and discuss advantages and disadvantages of this approach.
Resumo:
Climate change mitigation is driving demand for energy-efficient and environmentally conscious commercial buildings in Australia. In the Australian subtropics, high rainfall, warm weather and humidity present unique challenges and opportunities for the architects tasked with designing eco-sensitive projects. The case of the James Street Market in Brisbane’s Fortitude Valley shows that climate-responsive design is an effective approach for reducing the environmental impact of commercial developments. The James Street Market combines climate-responsiveness, environmentally sensitive design strategies and smart planning to create a more sustainable retail precinct. This paper details the design strategies featured in the James Street Market, the project that kicked off a renaissance in climate-responsive commercial building design in Brisbane.
Resumo:
Because of the greenhouse gas emissions implications of the market dominating electric hot water systems, governments in Australia have implemented policies and programs to encourage the uptake of solar water heaters (SWHs) in the residential market as part of climate change adaptation and mitigation strategies. The cost-benefit analysis that usually accompanies all government policy and program design could be simplistically reduced to the ratio of expected greenhouse gas reductions of SWH to the cost of a SWH. The national Register of Solar Water Heaters specifies how many renewable energy certificates (RECs) are allocated to complying SWHs according to their expected performance, and hence greenhouse gas reductions, in different climates. Neither REC allocations nor rebates are tied to actual performance of systems. This paper examines the performance of instantaneous gas-boosted solar water heaters installed in new residences in a housing estate in south-east Queensland in the period 2007 – 2010. The evidence indicates systemic failures in installation practices, resulting in zero solar performance or dramatic underperformance (estimated average 43% solar contribution). The paper will detail the faults identified, and how these faults were eventually diagnosed and corrected. The impacts of these system failures on end-use consumers are discussed before concluding with a brief overview of areas where further research is required in order to more fully understand whole of supply chain implications.
Resumo:
The Streaming SIMD extension (SSE) is a special feature that is available in the Intel Pentium III and P4 classes of microprocessors. As its name implies, SSE enables the execution of SIMD (Single Instruction Multiple Data) operations upon 32-bit floating-point data therefore, performance of floating-point algorithms can be improved. In electrified railway system simulation, the computation involves the solving of a huge set of simultaneous linear equations, which represent the electrical characteristic of the railway network at a particular time-step and a fast solution for the equations is desirable in order to simulate the system in real-time. In this paper, we present how SSE is being applied to the railway network simulation.
Resumo:
This paper investigates how to interface the wireless application protocol (WAP) architecture to the SCADA system running distributed network protocol (DNP) in a power process plant. DNP is a well-developed protocol to be applied in the supervisory control and data acquisition (SCADA) system but the system control centre and remote terminal units (RTUs) are presently connected through a local area network. The conditions in a process plant are harsh and the site is remote. Resources for data communication are difficult to obtain under these conditions, thus, a wireless channel communication through a mobile phone is practical and efficient in a process plant environment. The mobile communication industries and the public have a strong interest in the WAP technology application in mobile phone networks and the WAP application programming interface (API) in power industry applications is one area that requires extensive investigation.
Resumo:
Abstract Computer simulation is a versatile and commonly used tool for the design and evaluation of systems with different degrees of complexity. Power distribution systems and electric railway network are areas for which computer simulations are being heavily applied. A dominant factor in evaluating the performance of a software simulator is its processing time, especially in the cases of real-time simulation. Parallel processing provides a viable mean to reduce the computing time and is therefore suitable for building real-time simulators. In this paper, we present different issues related to solving the power distribution system with parallel computing based on a multiple-CPU server and we will concentrate, in particular, on the speedup performance of such an approach.
Resumo:
The economiser is a critical component for efficient operation of coal-fired power stations. It consists of a large system of water-filled tubes which extract heat from the exhaust gases. When it fails, usually due to erosion causing a leak, the entire power station must be shut down to effect repairs. Not only are such repairs highly expensive, but the overall repair costs are significantly affected by fluctuations in electricity market prices, due to revenue lost during the outage. As a result, decisions about when to repair an economiser can alter the repair costs by millions of dollars. Therefore, economiser repair decisions are critical and must be optimised. However, making optimal repair decisions is difficult because economiser leaks are a type of interactive failure. If left unfixed, a leak in a tube can cause additional leaks in adjacent tubes which will need more time to repair. In addition, when choosing repair times, one also needs to consider a number of other uncertain inputs such as future electricity market prices and demands. Although many different decision models and methodologies have been developed, an effective decision-making method specifically for economiser repairs has yet to be defined. In this paper, we describe a Decision Tree based method to meet this need. An industrial case study is presented to demonstrate the application of our method.
Resumo:
In this website, you can virtually attend all lectures, tutorials, computer Labs and quizzes and also access to lecture notes.