468 resultados para advanced metering infrastructure (AMI)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transport and logistics are essential to effective business. Very little is currently known about the impact of improved transport on micro-enterprises in developing economies and whether improvements in this area would assist the very poor. This paper looks at the obstacles of an inefficient transport facilitation system and the high costs incurred by 22 survival micro-entrepreneurs funded by the same local NGO and operating in diverse industry sectors in a peri-urban context in Mozambique. Six case studies are selected to illustrate the most common constraints they face. The perspectives of the micro-business owners are confronted with those of government officials and community leaders for two reasons: to identify any mismatch and to discuss possible solutions. Significant discrepancies are detected between government agenda and needs of the population, while community-based entrepreneurship (CBE) is discussed as a possible collective strategy in dealing with the problem.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, the advent of new tools for musculoskeletal simulation has increased the potential for significantly improving the ergonomic design process and ergonomic assessment of design. In this paper we investigate the use of one such tool, ‘The AnyBody Modeling System’, applied to solve a one-parameter and yet, complex ergonomic design problem. The aim of this paper is to investigate the potential of computer-aided musculoskeletal modelling in the ergonomic design process, in the same way as CAE technology has been applied to engineering design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From its early birth through to the twenty-first century, the planning for social infrastructure has been viewed as a crucial element in promoting the development of healthy communities. The existence of good social infrastructure in every level of human settlement (i.e. neighbourhoods, districts, regions etc.) is vital because it is considered to be an element that impacts positively and meaningfully on the quality of life for members of the targeted community. The increasing importance of the sustainable development agenda in human settlements has prompted concerns over the cost of the government’s failure to provide for adequate social infrastructure for their communities. Part of this failure is attributed to the inconsistent outcome from the use of traditional planning standards that are based on population-to-facility ratios. This paper explores the literature discussion on social infrastructure for sustainable communities. It examines how a participation-oriented, need-sensitive approach in the planning and provision of social infrastructure is used as an alternative to the traditional standards that are based on population-to-facility ratios. It does this by giving an overview of its application in the planning and provision of social infrastructure for Australia’s fastest growing region of South-East Queensland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To ensure infrastructure assets are procured and maintained by government on behalf of citizens, appropriate policy and institutional architecture is needed, particularly if a fundamental shift to more sustainable infrastructure is the goal. The shift in recent years from competitive and resource-intensive procurement to more collaborative and sustainable approaches to infrastructure governance is considered a major transition in infrastructure procurement systems. In order to better understand this transition in infrastructure procurement arrangements, the concept of emergence from Complex Adaptive Systems (CAS) theory is offered as a key construct. Emergence holds that micro interactions can result in emergent macro order. Applying the concept of emergence to infrastructure procurement, this research examines how interaction of agents in individual projects can result in different industry structural characteristics. The paper concludes that CAS theory, and particularly the concept of ‘emergence’, provides a useful construct to understand infrastructure procurement dynamics and progress towards sustainability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When does 1960s art begin and end? Certainly, aside from a few affinities, the decade’s artistic output does not exactly correspond to its popular conception as the ‘Swinging Sixties’. While it was rare that psychedelic art was truly challenging, the decade saw a number of perceptions change regarding the aims, boundaries and possibilities of experiencing art. Thus, this era has come to represent a watershed or crisis in modernist art. While in the Australian context many of these nascent trends were properly realised in the 1970s – with the full force and impact of post-object art – other challenges were first articulated in the 1950s. So, like any other demarcation of a decade, its limits and boundaries are porous.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) project delivery systems have increasingly been adopted by many private and public sector organizations worldwide due to the many advantages offered on projects by such systems. However, many Indonesian road infrastructure projects are still delivered using the traditional design-bid-build (DBB) project delivery system. In order to provide evidence of the benefits of DB, it is essential to identify the factors that can contribute to successful DB implementation and this paper aims to provide evidence of such factors that can promote the successful implementation of DB project delivery systems on Indonesian road infrastructure projects. Four main factors and 28 indicators were identified from an extensive literature review, and a Delphi questionnaire survey was conducted amongst 20 experts drawn from the Indonesian road infrastructure construction sector. The first round Delphi study found that regulation, competency of clients, ability to manage DB projects and external conditions were the major factors that can promote successful DB implementation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Just as telecommunications has played a key role in the global economy,1 high-speed broadband will have a significant role to play in the future of the digital economy. In particular high-speed broadband will have a role to play in the delivery of applications and services necessary for acquiring, and maintaining into the future Australia and Australians’ appropriate education level; community; health services, information provision and support; government services and engagement and participation by the public in the political process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Product innovation is an important contributor to the performance of infrastructure projects in the construction industry. Maximizing the potential for innovative product adoption is a challenging task due to the complexities of the construction innovation system. A qualitative methodology involving interviews with major construction project stakeholders is employed to address the research question: ‘What are the main obstacles to the adoption of innovative products in the road industry?’ The characteristics of six key product innovation obstacles in Australian road projects are described. The six key obstacles are: project goal misalignment, client pressures, weak contractual relations, lack of product trialling, inflexible product specifications and product liability concerns. A snapshot of the dynamics underlying these obstacles is provided. There are few such assessments in the literature, despite the imperative to improve construction innovation rates globally in order to deliver road infrastructure projects of increasing size and complexity. Key obstacles are interpreted through an open innovation construct, providing direction for policy to enhance the uptake of innovation across the construction product supply network. Early evidence suggests the usefulness of an open innovation construct that integrates three conceptual lenses: network governance, absorptive capacity and knowledge intermediation, in order to interpret product adoption obstacles in the context of Australian road infrastructure projects. The paper also provides practical advice and direction for government and industry organizations that wish to promote the flow of innovative product knowledge across the construction supply network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Analysing the condition of an asset is a big challenge as there can be many aspects which can contribute to the overall functional reliability of the asset that have to be considered. In this paper we propose a two-step functional and causal relationship diagram (FCRD) to address this problem. In the first step, the FCRD is designed to facilitate the analysis of the condition of an asset by evaluating the interdependence (functional and causal) relationships between different components of the asset with the help of a relationship diagram. This is followed by the advanced FCRD (AFCRD) which refines the information from the FCRD into a comprehensive and manageable format. This new two-step methodology for asset condition monitoring is tested and validated for the case of a water treatment plant. © IMechE 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of actively managing and analyzing business processes is acknowledged more than ever in organizations nowadays. Business processes form an essential part of an organization and their ap-plication areas are manifold. Most organizations keep records of various activities that have been carried out for auditing purposes, but they are rarely used for analysis purposes. This paper describes the design and implementation of a process analysis tool that replays, analyzes and visualizes a variety of performance metrics using a process definition and its execution logs. Performing performance analysis on existing and planned process models offers a great way for organizations to detect bottlenecks within their processes and allow them to make more effective process improvement decisions. Our technique is applied to processes modeled in the YAWL language. Execution logs of process instances are compared against the corresponding YAWL process model and replayed in a robust manner, taking into account any noise in the logs. Finally, performance characteristics, obtained from replaying the log in the model, are projected onto the model.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cognitive obstacles that arise in the teaching and learning of scalar line integrals, derived from cognitive aids provided to students when first learning about integration of single variable functions are described. A discussion of how and why the obstacles cause students problems is presented and possible strategies to overcome the obstacles are outlined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Australian economy has been transformed by bold federal government initiatives over the last decade. The political rhetoric is that without these reforms, the Australian economy will falter and be uncompetitive in a global market place. Despite the electoral disquiet that rapid systemic change brings, both sides of politics have adopted the broad starting point that it is imperative that our economy be transformed or Australian living standards will dramatically plummet...