755 resultados para construction techniques
Resumo:
As part of a Doctor of Business Administration degree programme jointly run by Curtin University, Perth, Australia and Lingnan University, Hong Kong, a research thesis relating organizational effectiveness to the organizational culture of Hong Kong construction firms involved in public housing is being undertaken. Organizational effectiveness is measured by the Housing Department (HD) Performance Assessment Scoring System (PASS) and organizational culture traits and strengths have been measured by using the Denison Organizational Culture Survey (OCS), developed by Daniel Denison and William S. Neale and based on 16 years of research involving over 1,000 organizations. The PASS scores of building contractors are compared with the OCS scores to determine if there is any significant correlation between highly effective companies and particular organizational strengths and traits. Profiles are then drawn using the Denison Model and can be compared against ‘norms’ for the industry sector on which the survey has been carried out. The next stage of the work is to present the results of the survey to individual companies, conduct focus group interviews to test the results, discover more detail on that company’s culture and discuss possible actions based on the results. It is in this latter stage that certain value management techniques may well prove very useful.
Resumo:
This research investigates wireless intrusion detection techniques for detecting attacks on IEEE 802.11i Robust Secure Networks (RSNs). Despite using a variety of comprehensive preventative security measures, the RSNs remain vulnerable to a number of attacks. Failure of preventative measures to address all RSN vulnerabilities dictates the need for a comprehensive monitoring capability to detect all attacks on RSNs and also to proactively address potential security vulnerabilities by detecting security policy violations in the WLAN. This research proposes novel wireless intrusion detection techniques to address these monitoring requirements and also studies correlation of the generated alarms across wireless intrusion detection system (WIDS) sensors and the detection techniques themselves for greater reliability and robustness. The specific outcomes of this research are: A comprehensive review of the outstanding vulnerabilities and attacks in IEEE 802.11i RSNs. A comprehensive review of the wireless intrusion detection techniques currently available for detecting attacks on RSNs. Identification of the drawbacks and limitations of the currently available wireless intrusion detection techniques in detecting attacks on RSNs. Development of three novel wireless intrusion detection techniques for detecting RSN attacks and security policy violations in RSNs. Development of algorithms for each novel intrusion detection technique to correlate alarms across distributed sensors of a WIDS. Development of an algorithm for automatic attack scenario detection using cross detection technique correlation. Development of an algorithm to automatically assign priority to the detected attack scenario using cross detection technique correlation.
Resumo:
Worldwide, education systems have undergone unprecedented change due to a variety of economic, social, and political forces (Limerick, Cunnington & Crowther, 2002). The People’s Republic of China (PRC) is no exception. Continuous educational reform at primary and secondary levels in Mainland China has created new challenges and accountabilities for school principals. The important role of principals in primary and secondary schools has been acknowledged in both policy documents and the broader literature (Central Committee of the Chinese Communist Party, 1985; F. Chen, 2005; Chu, 2003; W. Huang, 2005; T. Wang, 2003). Yet, most of the literature on primary and secondary school principals in Mainland China is prescriptive in nature, identifying from the perspectives of researchers and academics what principals should do and how they should enact leadership. Lacking in this research is an awareness of the daily practices and lived experiences of principals. Furthermore, within the small body of writing on primary and secondary school principals in Mainland China, gender is seldom given any attention. To date, only a small number of empirical studies have focused on female principals as a specific category of research (Zen, 2004; Zhong, 2004). This study aimed to explore the professional lives of two female exemplary school principals in urban primary schools in Mainland China. A qualitative exploratory case study was used. Semi-structured interviews with each individual female principal, with six teachers in each of the school sites and with the superintendent of each principal were conducted. Field observations and document analysis were also undertaken to obtain multiple insights about their leadership practices. The conceptual framework was based largely on the theory of Gronn (1999) and incorporated five core leadership practices (vision building, ethical considerations, teaching and learning, power utilisation, and dealing with risks and challenges) taken from the wider literature. The key findings of this study were twofold. Firstly, while the five leadership practices were evident in the leadership of the two principals, this study identified some subtle differences in the way they approached each of them. Secondly, contextual factors such as Chinese traditional culture, the contemporary societal context, and the school organisational context, in addition to the biographical experiences of each principal were significant factors in shaping the way in which they exercised their leadership practices in the schools.
Resumo:
The Cooperative Research Centre (CRC) for Construction Innovation is Australia’s national centre for research and innovation focused on the needs of the property, design, construction and facility management sectors. The period covered by this report is from 1 July 2001 to 30 October 2009. The report comprises of two parts. Part A details the future and possible future impact of the CRC including: The Future of the CRC, Research and Commercialisation, Economic Benefit to Australia, Public Good Benefits to Australia. Part B details the achievements during the funding period including: Economic Benefit and Commercialisation, Uptake of Research Results, Impact of Education Programs, CRC Operations.
Resumo:
Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.
Resumo:
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.
Resumo:
A strong designated verifier signature scheme makes it possible for a signer to convince a designated verifier that she has signed a message in such a way that the designated verifier cannot transfer the signature to a third party, and no third party can even verify the validity of a designated verifier signature. We show that anyone who intercepts one signature can verify subsequent signatures in Zhang-Mao ID-based designated verifier signature scheme and Lal-Verma ID-based designated verifier proxy signature scheme. We propose a new and efficient ID-based designated verifier signature scheme that is strong and unforgeable. As a direct corollary, we also get a new efficient ID-based designated verifier proxy signature scheme.
Resumo:
To date, most theories of business models have theorized value capture assuming that appropriability regimes were exogenous and that the firm would face a unique, ideal-typical appropriability regime. This has led theory contributions to focus on governance structures to minimize transaction costs, to downplay the interdepencies between value capture and value creation, and to ignore revenue generation strategies. We propose a reconceptualization of business models value capture mechanisms that rely on assumptions of endogeneity and multiplicity of appropriability regimes. This new approach to business model construction highlights the interdependencies and trade-offs between value creation and value capture offered by different types and combinations of appropriability regimes. The theory is illustrated by the analysis of three cases of open source software business models
Resumo:
In this paper techniques for scheduling additional train services (SATS) are considered as is train scheduling involving general time window constraints, fixed operations, maintenance activities and periods of section unavailability. The SATS problem is important because additional services must often be given access to the railway and subsequently integrated into current timetables. The SATS problem therefore considers the competition for railway infrastructure between new services and existing services belonging to the same or different operators. The SATS problem is characterised as a hybrid job shop scheduling problem with time window constraints. To solve this problem constructive algorithm and metaheuristic scheduling techniques that operate upon a disjunctive graph model of train operations are utilised. From numerical investigations the proposed framework and associated techniques are tested and shown to be effective.
Resumo:
There are many interactive media systems, including computer games and media art works, in which it is desirable for music to vary in response to changes in the environment. In this paper we will outline a range of algorithmic techniques that enable music to adapt to such changes, taking into account the need for the music to vary in its expressiveness or mood while remaining coherent and recognisable. We will discuss the approaches which we have arrived at after experience in a range of adaptive music systems over recent years, and draw upon these experiences to inform discussion of relevant considerations and to illustrate the techniques and their effect.
Resumo:
In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.
Resumo:
Texture based techniques for visualisation of unsteady vector fields have been applied for the visualisation of a Finite volume model for variably saturated groundwater flow through porous media. This model has been developed by staff in the School of Mathematical Sciences QUT for the study of salt water intrusion into coastal aquifers. This presentation discusses the implementation and effectiveness of the IBFV algorithm in the context of visualisation of the groundwater simulation outputs.