214 resultados para John Lewis Model
A Process Modelling Success Model: Case Study Insights from an Australian Public Sector Organisation
Resumo:
Two distinct maintenance-data-models are studied: a government Enterprise Resource Planning (ERP) maintenance-data-model, and the Software Engineering Industries (SEI) maintenance-data-model. The objective is to: (i) determine whether the SEI maintenance-data-model is sufficient in the context of ERP (by comparing with an ERP case), (ii) identify whether the ERP maintenance-data-model in this study has adequately captured the essential and common maintenance attributes (by comparing with the SEI), and (iii) proposed a new ERP maintenance-data-model as necessary. Our findings suggest that: (i) there are variations to the SEI model in an ERP-context, and (ii) there are rooms for improvements in our ERP case’s maintenance-data-model. Thus, a new ERP maintenance-data-model capturing the fundamental ERP maintenance attributes is proposed. This model is imperative for: (i) enhancing the reporting and visibility of maintenance activities, (ii) monitoring of the maintenance problems, resolutions and performance, and (iii) helping maintenance manager to better manage maintenance activities and make well-informed maintenance decisions.
Resumo:
Abstract Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.