369 resultados para Inter Session Variability Modelling
Resumo:
This paper explores inter-agency working and examines the implications of inter-agency operations for delivering multi-domain service outcomes. Cross-agency collaborative approaches to service delivery are suggested to provide the vehicle for achieving integrated service and policy goals. However, it is argued these need to be crafted ‘fit’ for purpose’ and may not be the requisite approach for all joint purposes. Moreover, some commentators suggest that the optimism about these partnership arrangements and cross-agency actions to resolve complex multi-dimensional problems may be misplaced and propose that further research into the actual rather than desired consequences of these arrangements may find that, at times, partnership working creates negative effects. While collaboration and partnerships are often framed as the way to achieve real breakthroughs in service delivery across agencies, there remain key challenges to interagency working. As more and insistent calls for agencies and other community actors to work together in resolving complex social problems are heeded, the implications of working across organizational boundaries need to be further investigated. This paper investigates cases of inter-agency programmes to understand the dimensions and limitations of inter-agency working. The paper concludes by offering a framework for better inter-agency working that has applicability across all sectors.
Resumo:
This paper analyzes the performance of some of the widely used voltage stability indices, namely, singular value, eigenvalue, and loading margin with different static load models. Well-known ZIP model is used to represent loads having components with different power to voltage sensitivities. Studies are carried out on a 10-bus power system and the New England 39-bus power system models. The effects of variation of load model on the performance of the voltage stability indices are discussed. The choice of voltage stability index in the context of load modelling is also suggested in this paper.
Resumo:
In today's highly challenging business environment, an innovative and systemic approach is imperative to survival and growth. Organisational integration and technological integration, are often seen as a catalyst of change that could lead to significant improvements in organisations. The levels of improvement in inter and intra firm integration should arise from a detailed understanding and development of competences within and between organisations. Preliminary findings suggest that lack of trust across organisational cultures within the firms has a negative influence on the development of the capabilities to integrate and align technological innovations and hinders implementation and the effectiveness of the operations. Additionally, poor communication and conflict effects customer satisfaction. Firms need to transfer the competences that support cooperative integration, developed through interaction with supply chain partners, to their relationship arrangements with other supply chain partners, as these are key to ensuring low operational costs.
Resumo:
Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.
Resumo:
A curriculum for a university-level course called Business Process Modeling is presented in order to provide guidance for the increasing number of institutions who are currently developing such contents. The course caters to undergraduate and post graduate students. Its content is drawn from recent research, industry practice, and established teaching material, and teaches ways of specifying business processes for the analysis and design of process-aware information systems. The teaching approach is a blend of lectures and classroom exercises with innovative case studies, as well as reviews of research material. Students are asked to conceptualize, analyze, and articulate real life process scenarios. Tutorials and cheat sheets assist with the learning experience. Course evaluations from 40 students suggest the adequacy of the teaching approach. Specifically, evaluations show a high degree of satisfaction with course relevance, content presentation, and teaching approach.
Resumo:
The challenges of maintaining a building such as the Sydney Opera House are immense and are dependent upon a vast array of information. The value of information can be enhanced by its currency, accessibility and the ability to correlate data sets (integration of information sources). A building information model correlated to various information sources related to the facility is used as definition for a digital facility model. Such a digital facility model would give transparent and an integrated access to an array of datasets and obviously would support Facility Management processes. In order to construct such a digital facility model, two state-of-the-art Information and Communication technologies are considered: an internationally standardized building information model called the Industry Foundation Classes (IFC) and a variety of advanced communication and integration technologies often referred to as the Semantic Web such as the Resource Description Framework (RDF) and the Web Ontology Language (OWL). This paper reports on some technical aspects for developing a digital facility model focusing on Sydney Opera House. The proposed digital facility model enables IFC data to participate in an ontology driven, service-oriented software environment. A proof-of-concept prototype has been developed demonstrating the usability of IFC information to collaborate with Sydney Opera House’s specific data sources using semantic web ontologies.
Resumo:
In this computational study we investigate the role of turbulence in ideal axisymmetric vortex breakdown. A pipe geometry with a slight constriction near the inlet is used to stabilise the location of the breakdown within the computed domain. Eddy-viscosity and differential Reynolds stress models are used to model the turbulence. Changes in upstream turbulence levels, flow Reynolds and Swirl numbers are considered. The different computed solutions are monitored for indications of different breakdown flow configurations. Trends in vortex breakdown due to turbulent flow conditions are identified and discussed.
Resumo:
This appendix describes the Order Fulfillment process followed by a fictitious company named Genko Oil. The process is freely inspired by the VICS (Voluntary Inter-industry Commerce Solutions) reference model1 and provides a demonstration of YAWL’s capabilities in modelling complex control-flow, data and resourcing requirements.
Resumo:
This paper reviews the main development of approaches to modelling urban public transit users’ route choice behaviour from 1960s to the present. The approaches reviewed include the early heuristic studies on finding the least cost transit route and all-or-nothing transit assignment, the bus common line problem and corresponding network representation methods, the disaggregate discrete choice models which are based on random utility maximization assumptions, the deterministic use equilibrium and stochastic user equilibrium transit assignment models, and the recent dynamic transit assignment models using either frequency or schedule based network formulation. In addition to reviewing past outcomes, this paper also gives an outlook into the possible future directions of modelling transit users’ route choice behaviour. Based on the comparison with the development of models for motorists’ route choice and traffic assignment problems in an urban road area, this paper points out that it is rewarding for transit route choice research to draw inspiration from the intellectual outcomes out of the road area. Particularly, in light of the recent advancement of modelling motorists’ complex road route choice behaviour, this paper advocates that the modelling practice of transit users’ route choice should further explore the complexities of the problem.
Resumo:
Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.
Resumo:
A recent article in the Journal of Science and Medicine in Sport by Chapman et al.1 reported data from an empirical investigation comparing lower extremity joint motions, joint coordination and muscle recruitment in expert and novice cyclists. 3D kinematic and intramuscular electromyographic (EMG) analyses revealed no differences between expert and novice cyclists for normalised joint angles and velocities of the pelvis, hip, knee and ankle. However, significant differences in the strength of sagittal plane kinematics for hip–ankle and knee–ankle joint couplings were reported, with expert cyclists displaying tighter coupling relationships than novice cyclists. Furthermore, significant differences between expert and novice cyclists for all muscle recruitment parameters, except timing of peak EMG amplitude, were also reported.
Resumo:
This article presents one approach to addressing the important issue of interdisciplinarity in the primary school mathematics curriculum, namely, through realistic mathematical modelling problems. Such problems draw upon other disciplines for their contexts and data. The article initially considers the nature of modelling with complex systems and discusses how such experiences differ from existing problem-solving activities in the primary mathematics curriculum. Principles for designing interdisciplinary modelling problems are then addressed, with reference to two mathematical modelling problems— one based in the scientific domain and the other in the literary domain. Examples of the models children have created in solving these problems follow. A reflection on the differences in the diversity and sophistication of these models raises issues regarding the design of interdisciplinary modelling problems. The article concludes with suggested opportunities for generating multidisciplinary projects within the regular mathematics curriculum.
Resumo:
President’s Message Hello fellow AITPM members, We’ve been offered a lot of press lately about the Federal Government’s plan for the multibillion dollar rollout of its high speed broadband network, which at the moment is being rated to a speed of 100Mb/s. This seems fantastic in comparison to the not atypical 250 to 500kb/s that I receive on my metropolitan cable broadband, which incidentally my service provider rates at theoretical speeds of up to 8 Mb/s. I have no doubt that such a scheme will generate significant advantages to business and consumers. However, I also have some reservations. Only a few of years ago I marvelled at my first 256Mb USB stick, which cost my employer about $90. Last month I purchased a 16Gb stick with a free computer carry bag for $80, which on the back of my envelope has given me about 72 times the value of my first USB stick not including the carry bag! I am pretty sure the technology industry will find a way to eventually push a lot more than 100Mb/s down the optic fibre network just as they have done with pushing several Mb/s ADSL2 down antique copper wire. This makes me wonder about the general problem of inbuilt obsolescence of all things high-tech due to rapid advances in the tech industry. As a transport professional I then think to myself that our industry has been moving forward at somewhat of a slower pace. We certainly have had major milestones having significant impacts, such as the move from horse and cart to the self propelled motor vehicle, sealing and formal geometric design of roads, development of motorways, signalisation of intersections, coordination of networks, to simulation modelling for real time adaptive control (perhaps major change has been at a frequency of 30 years or so?). But now with ITS truly penetrating the transport market, largely thanks to the in-car GPS navigator, smart phone, e-toll and e-ticket, I believe that to avoid our own obsolescence we’re going to need to “plan for ITS” rather than just what we seem to have been doing up until now, that is, to get it out there. And we’ll likely need to do it at a faster pace. It will involve understanding how to data mine enormous data sets, better understanding the human/machine interface, keeping pace with automotive technology more closely, resolving the ethical and privacy chestnuts, and in the main actually planning for ITS to make peoples’ lives easier rather than harder. And in amongst this we’ll need to keep pace with the types of technology advances similar to my USB stick example above. All the while we’ll be making a brand new set of friends in the disciplines that will morph into ITS along with us. Hopefully these will all be “good” problems for our profession to have. I should close in reminding everyone again that AITPM’s flagship event, the 2009 AITPM National Conference, Traffic Beyond Tomorrow, is being held in Adelaide from 5 to 7 August. www.aitpm.com has all of the details about how to register, sponsor a booth, session, etc. Best regards all, Jon Bunker