189 resultados para Undesirable output
Resumo:
In line with accepted decision making theory, individuals engage in rational decision making. Decisions made under conditions of bounded rationality may have serious adverse consequences. Employees making decisions on behalf of their employer are often faced with situations where perfect and complete information is not available, and time is limited. Under such conditions, we posit that employees will make decisions that are increasingly bounded. At its most extreme neither time nor information is available to make a decision and rational decision making, bounded or not, reaches its limits. Many authors suggest that this is the point at which improvisation takes place. Although opinion in the literature is mixed regarding the efficacy of improvised decisions, we argue that improvised decisions place the organisation at considerable risk and as a consequence are undesirable.
Resumo:
Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context. Execution of many similar industrial projects creates the idea of lean project management in companies and rapidly growing in industries. This paper offers the standardization method in order to achieve Lean project management in large scale industrial project. Standardization refers to all activity which makes two projects most identical and unify to each other like standardization of design, reducing output variability, value analysis and strategic management. Although standard project may have minor effi ciency decrease, compare to custom built project; but great advantage of standard project like cost saving, time reduction and quality improvement justify standardization methodology. This paper based on empirical experience in industrial project and theoretical analysis of benefi ts of project standardization.
Resumo:
This paper is concerned with some plane strain and axially symmetric free surface problems which arise in the study of static granular solids that satisfy the Coulomb-Mohr yield condition. Such problems are inherently nonlinear, and hence difficult to attack analytically. Given a Coulomb friction condition holds on a solid boundary, it is shown that the angle a free surface is allowed to attach to the boundary is dependent only on the angle of wall friction, assuming the stresses are all continuous at the attachment point, and assuming also that the coefficient of cohesion is nonzero. As a model problem, the formation of stable cohesive arches in hoppers is considered. This undesirable phenomena is an obstacle to flow, and occurs when the hopper outlet is too small. Typically, engineers are concerned with predicting the critical outlet size for a given hopper and granular solid, so that for hoppers with outlets larger than this critical value, arching cannot occur. This is a topic of considerable practical interest, with most accepted engineering methods being conservative in nature. Here, the governing equations in two limiting cases (small cohesion and high angle of internal friction) are considered directly. No information on the critical outlet size is found; however solutions for the shape of the free boundary (the arch) are presented, for both plane and axially symmetric geometries.
Resumo:
Path planning and trajectory design for autonomous underwater vehicles (AUVs) is of great importance to the oceanographic research community because automated data collection is becoming more prevalent. Intelligent planning is required to maneuver a vehicle to high-valued locations to perform data collection. In this paper, we present algorithms that determine paths for AUVs to track evolving features of interest in the ocean by considering the output of predictive ocean models. While traversing the computed path, the vehicle provides near-real-time, in situ measurements back to the model, with the intent to increase the skill of future predictions in the local region. The results presented here extend prelim- inary developments of the path planning portion of an end-to-end autonomous prediction and tasking system for aquatic, mobile sensor networks. This extension is the incorporation of multiple vehicles to track the centroid and the boundary of the extent of a feature of interest. Similar algorithms to those presented here are under development to consider additional locations for multiple types of features. The primary focus here is on algorithm development utilizing model predictions to assist in solving the motion planning problem of steering an AUV to high-valued locations, with respect to the data desired. We discuss the design technique to generate the paths, present simulation results and provide experimental data from field deployments for tracking dynamic features by use of an AUV in the Southern California coastal ocean.
Resumo:
Operators of busy contemporary airports have to balance tensions between the timely flow of passengers, flight operations, the conduct of commercial business activities and the effective application of security processes. In addition to specific onsite issues airport operators liaise with a range of organisations which set and enforce aviation-related policies and regulations as well as border security agencies responsible for customs, quarantine and immigration, in addition to first response security services. The challenging demands of coordinating and planning in such complex socio-technical contexts place considerable pressure on airport management to facilitate coordination of what are often conflicting goals and expectations among groups that have standing in respect to safe and secure air travel. What are, as yet, significantly unexplored issues in large airports are options for the optimal coordination of efforts from the range of public and private sector participants active in airport security and crisis management. A further aspect of this issue is how airport management systems operate when there is a transition from business-as-usual into an emergency/crisis situation and then, on recovery, back to ‘normal’ functioning. Business Continuity Planning (BCP), incorporating sub-plans for emergency response, continuation of output and recovery of degraded operating capacity, would fit such a context. The implementation of BCP practices in such a significant high security setting offers considerable potential benefit yet entails considerable challenges. This paper presents early results of a 4 year nationally funded industry-based research project examining the merger of Business Continuity Planning and Transport Security Planning as a means of generating capability for improved security and reliability and, ultimately, enhanced resilience in major airports. The project is part of a larger research program on the Design of Secure Airports that includes most of the gazetted ‘first response’ international airports in Australia, key Aviation industry groups and all aviation-related border and security regulators as collaborative partners. The paper examines a number of initial themes in the research, including: ? Approaches to integrating Business Continuity & Aviation Security Planning within airport operations; ? Assessment of gaps in management protocols and operational capacities for identifying and responding to crises within and across critical aviation infrastructure; ? Identification of convergent and divergent approaches to crisis management used across Austral-Asia and their alignment to planned and possible infrastructure evolution.
Resumo:
Todoy's monogers-drowing on the expertise of their IT professiono/s-
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
Optimal scheduling of voltage regulators (VRs), fixed and switched capacitors and voltage on customer side of transformer (VCT) along with the optimal allocaton of VRs and capacitors are performed using a hybrid optimisation method based on discrete particle swarm optimisation and genetic algorithm. Direct optimisation of the tap position is not appropriate since in general the high voltage (HV) side voltage is not known. Therefore, the tap setting can be determined give the optimal VCT once the HV side voltage is known. The objective function is composed of the distribution line loss cost, the peak power loss cost and capacitors' and VRs' capital, operation and maintenance costs. The constraints are limits on bus voltage and feeder current along with VR taps. The bus voltage should be maintained within the standard level and the feeder current should not exceed the feeder-rated current. The taps are to adjust the output voltage of VRs between 90 and 110% of their input voltages. For validation of the proposed method, the 18-bus IEEE system is used. The results are compared with prior publications to illustrate the benefit of the employed technique. The results also show that the lowest cost planning for voltage profile will be achieved if a combination of capacitors, VRs and VCTs is considered.
Resumo:
In December 2006, the Engineering and Technology Group of Queensland’s Department of Main Roads entered into a three-year skid resistance management research project with QUT Faculty of Built Environment and Engineering researchers and the QUT-based CRC for Integrated Engineering Asset Management (CIEAM). CIEAM undertakes a broad range of asset management research in the areas of defence, utilities, transportation and industrial processes. “The research project is an important activity of Main Roads’ Skid Resistance Management Plan published in June 2006.” said Main Roads project leader Mr Justin Weligamage. “The intended project output is a decision-support model for use by Road Asset Managers throughout a road network. The research objective is to enable road asset managers to better manage the surfacing condition of the road asset with specific focus on skid resistance,” said QUT project leader Professor Arun Kumar. The research project will review existing skid resistance investigatory levels, develop a risk-based method to establish skid resistance investigatory levels and improve the decision support methodology in order to minimise crashes. The new risk-based approach will be used to identify locations on the Queensland state-controlled road network that may have inadequate skid resistance. Once a high risk site is identified, the appropriate remedial action will be decided on. This approach will allow road asset managers to target optimal remedial actions, reducing the incidence and severity of crashes where inadequate skid resistance is a contributing cause.