870 resultados para Structural project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the Good Friday Agreement of 1998, large sums have been invested in community theatre projects in Northern Ireland, in the interests of conflict transformation and peace building. While this injection of funds has resulted in an unprecedented level of applied theatre activity, opportunities to maximise learning from this activity are being missed. It is generally assumed that project evaluation is undertaken at least partly to assess the degree of success of projects against important social objectives, with a view to learning what works, what does not, and what might work in the future. However, three ethnographic case studies of organisations delivering applied theatre projects in Northern Ireland indicate that current processes used to evaluate such projects are both flawed and inadequate for this purpose. Practitioners report that the administrative work involved in applying for and justifying funding is onerous, burdensome, and occurs at the expense of artistic activity. This is a very real concern when the time and effort devoted to ‘filling out the forms’ does not ultimately result in useful evaluative information. There are strong disincentives for organisations to report honestly on their experiences of difficulties, or undesirable impacts of projects, and this problem is not transcended by the use of external evaluators. Current evaluation processes provide little opportunity to capture unexpected benefits of projects, and small but significant successes which occur in the context of over-ambitious objectives. Little or no attempt is made to assess long-term impacts of projects on communities. Finally, official evaluation mechanisms fail to capture the reflective practice and dialogic analysis of practitioners, which would richly inform future projects. The authors argue that there is a need for clearer lines of communication, and more opportunities for mutual learning, among stakeholders involved in community development. In particular, greater involvement of the higher education sector in partnership with government and non-government agencies could yield significant benefits in terms of optimizing learning from applied theatre project evaluations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the outcomes of a project undertaken by the VACCHO Public Health Research Unit to explore ways to build capacity in Aboriginal and Torres Strait Islander social determinants research. The project was funded by the Cooperative Research Centre for Aboriginal Health.----- The project involved a series of four social determinants research workshops conducted in July and August 2009 and a collaborative forum conducted in September 2009. Invitations to participate were extended to the VACCHO membership and the nine universities in Victoria. Three workshops were held with ACCHOs (in Bendigo, Melbourne and Gippsland), and one workshop with universities (in Melbourne).----- The workshops aimed to build VACCHO’s social determinants research capacity and provide direction for VACCHO on ways to more effectively engage in Aboriginal health research. Through the workshops, VACCHO aimed to work with ACCHOs to identify research processes and issues that are equitable and sustainable, and which address the social determinants of health.----- At the workshops, participants explored questions around the priorities for the social determinants of Aboriginal health and considered the key partnerships that might be important to social determinants research.----- At the workshops with ACCHOs, participants identified key research priorities and questions in Aboriginal social determinants and health. This focus reflects the need for Aboriginal and Torres Strait Islander community representatives to identify the priorities in health and social determinants research. Identifying these priorities is important if researchers are to respond in a meaningful way and undertake relevant research in the most urgent areas of need. At the university workshop, participants focused on identifying research process and implementation issues in social determinants research.----- The final forum brought together ACCHOs, university representatives, invited presenters and participants from justice, education and housing departments, and representatives from non-government funding organisations. The forum aimed to provide an insight into how priorities and funding decisions are made, and how research can help to ensure they are influenced by the priorities of the community. The findings from the workshops were presented at the forum and used to develop pathways for future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Light gauge steel frame (LSF) structures are increasingly used in commercial and residential buildings because of their non-combustibility, dimensional stability and ease of installation. A common application is in floor-ceiling systems. The LSF floor-ceiling systems must be designed to serve as fire compartment boundaries and provide adequate fire resistance. Fire-rated floor-ceiling assemblies have been increasingly used in buildings. However, limited research has been undertaken in the past and hence a thorough understanding of their fire resistance behaviour is not available. Recently a new composite floor-ceiling system has been developed to provide higher fire rating. But its increased fire rating could not be determined using the currently available design methods. Therefore a research project was conducted to investigate its structural and fire resistance behaviour under standard fire conditions. This paper presents the results of full scale experimental investigations into the structural and fire behaviour of the new LSF floor system protected by the composite ceiling unit. Both the conventional and the new floor systems were tested under structural and fire loads. It demonstrates the improvements provided by the new composite panel system in comparison to conventional floor systems. Numerical studies were also undertaken using the finite element program ABAQUS. Measured temperature profiles of floors were used in the numerical analyses and their results were compared with fire test results. Tests and numerical studies provided a good understanding of the fire behaviour of the LSF floor-ceiling systems and confirmed the superior performance of the new composite system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Due to increases in HIV notifications in Queensland, a health promotion outreach project was developed with sex on premises venues (SOPV) in Brisbane. Methods: A health promotion officer (HPO) promoted safer sex behaviours among SOPV patrons over 14 months, including providing information, counselling and skills to enhance safer sexual behaviours and providing referrals. Surveys were introduced to facilitate discussions regarding HIV/sexually transmissible infections, testing and safer sex practices. Results: The project demonstrated feasibility within this highly sexualised environment, and was enhanced by careful monitoring and revising the procedure to improve patron/staff responses to the project. The introduction of a survey instrument was a significant contributor to the project’s effectiveness, providing opportunities for patrons to discuss a variety of key sexual health issues. Conclusions: This initiative reflected effective partnering between the Health Department, a community HIV/lesbian, gay, bisexual and transgender organisation and private industry. Despite initial difficulties, the presence of a health worker within an SOPV was acceptable to patrons and allowed for brief interventions to be conducted. This project was deemed effective for a limited time period and within certain constraints.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: As part of a comprehensive research study looking at implementing PPPs, interviews with experienced researchers were conducted to realize their views on private sector involvement in public works projects. Design / methodology / approach: Amongst these interviews, five were launched with academics from Hong Kong and Australia, and two were conducted with Legislative Councillors of the Hong Kong Special Administration Region (HKSAR) government. Findings: The interview findings show that both Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. The interviewees highlighted that “Different risk profiles” and “Private sector more innovative / efficient” were the main differences between projects that were procured by PPP and traditionally. Other differences include risk transfer. In a PPP arrangement the public sector passes on a substantial amount of the project risks to the private sector, whereas in a traditional case the public sector would take the largest responsibility in bearing these risks. Another common feature of the private sector is that they tend to be more efficient and innovative when compared to the public sector hence their expertise is often reflected in PPP projects. The interviewees agreed that the key performance indicators for PPP projects were unique depending on the individual project. The critical success factors mentioned by both groups of interviewees included “Transparent process”, “Project dependent” and “Market need”. Due to the fact that PPP projects tend to be large scaled costly projects, adequate transparency in the process is necessary in order to demonstrate that a fair selection and tendering process is conducted. A market need for the project is also important to ensure that the project will be financially secure and that the private sector can make a reasonable profit to cover their project expenditure. Originality / value: The findings from this study have enabled a comparative analysis between the views of researchers in two completely different jurisdictions. With the growing popularity to implement PPP projects, it is believed that the results presented in this paper would be of interest to the industry at large.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Knowledge is a powerful organisational asset yet intangible and hard to manage, particularly in a project environment where there is a tendency to repeat the same mistakes rather than learn from previous project lessons. A lack of effective knowledge sharing across projects causes reinventions that are costly, and time consuming. Research on knowledge transfer has focused mainly on functional organisations and only recent attention has been directed towards knowledge transfer in projects. Furthermore, there is little evidence in the literature which examines trust in the knowledge transfer processes. This paper studies how the three types of trust - ability, benevolence, and integrity impact on knowledge transfer from the inter-project perspective. Three case studies investigated the matter. A detailed description of the work undertaken and an analysis of interviews with project professionals from large project-based organisations are presented in this paper. The key finding identifies the positive impact of ability trust on knowledge transfer. However, it was also found that perception on both integrity and benevolence varied across organisations suggesting that there can be a possible impact of organisational factors on the way trust is perceived in inter-project knowledge transfer. The paper concludes with a discussion and recommendations regarding the development of trust for inter-project environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Queensland University of Technology (QUT) allows the presentation of theses for the Degree of Doctor of Philosophy in the format of published or submitted papers, where such papers have been published, accepted or submitted during the period of candidature. This thesis is composed of ten published /submitted papers and book chapters of which nine have been published and one is under review. This project is financially supported by an Australian Research Council (ARC) Discovery Grant with the aim of investigating multilevel topologies for high quality and high power applications, with specific emphasis on renewable energy systems. The rapid evolution of renewable energy within the last several years has resulted in the design of efficient power converters suitable for medium and high-power applications such as wind turbine and photovoltaic (PV) systems. Today, the industrial trend is moving away from heavy and bulky passive components to power converter systems that use more and more semiconductor elements controlled by powerful processor systems. However, it is hard to connect the traditional converters to the high and medium voltage grids, as a single power switch cannot stand at high voltage. For these reasons, a new family of multilevel inverters has appeared as a solution for working with higher voltage levels. Besides this important feature, multilevel converters have the capability to generate stepped waveforms. Consequently, in comparison with conventional two-level inverters, they present lower switching losses, lower voltage stress across loads, lower electromagnetic interference (EMI) and higher quality output waveforms. These properties enable the connection of renewable energy sources directly to the grid without using expensive, bulky, heavy line transformers. Additionally, they minimize the size of the passive filter and increase the durability of electrical devices. However, multilevel converters have only been utilised in very particular applications, mainly due to the structural limitations, high cost and complexity of the multilevel converter system and control. New developments in the fields of power semiconductor switches and processors will favor the multilevel converters for many other fields of application. The main application for the multilevel converter presented in this work is the front-end power converter in renewable energy systems. Diode-clamped and cascade converters are the most common type of multilevel converters widely used in different renewable energy system applications. However, some drawbacks – such as capacitor voltage imbalance, number of components, and complexity of the control system – still exist, and these are investigated in the framework of this thesis. Various simulations using software simulation tools are undertaken and are used to study different cases. The feasibility of the developments is underlined with a series of experimental results. This thesis is divided into two main sections. The first section focuses on solving the capacitor voltage imbalance for a wide range of applications, and on decreasing the complexity of the control strategy on the inverter side. The idea of using sharing switches at the output structure of the DC-DC front-end converters is proposed to balance the series DC link capacitors. A new family of multioutput DC-DC converters is proposed for renewable energy systems connected to the DC link voltage of diode-clamped converters. The main objective of this type of converter is the sharing of the total output voltage into several series voltage levels using sharing switches. This solves the problems associated with capacitor voltage imbalance in diode-clamped multilevel converters. These converters adjust the variable and unregulated DC voltage generated by renewable energy systems (such as PV) to the desirable series multiple voltage levels at the inverter DC side. A multi-output boost (MOB) converter, with one inductor and series output voltage, is presented. This converter is suitable for renewable energy systems based on diode-clamped converters because it boosts the low output voltage and provides the series capacitor at the output side. A simple control strategy using cross voltage control with internal current loop is presented to obtain the desired voltage levels at the output voltage. The proposed topology and control strategy are validated by simulation and hardware results. Using the idea of voltage sharing switches, the circuit structure of different topologies of multi-output DC-DC converters – or multi-output voltage sharing (MOVS) converters – have been proposed. In order to verify the feasibility of this topology and its application, steady state and dynamic analyses have been carried out. Simulation and experiments using the proposed control strategy have verified the mathematical analysis. The second part of this thesis addresses the second problem of multilevel converters: the need to improve their quality with minimum cost and complexity. This is related to utilising asymmetrical multilevel topologies instead of conventional multilevel converters; this can increase the quality of output waveforms with a minimum number of components. It also allows for a reduction in the cost and complexity of systems while maintaining the same output quality, or for an increase in the quality while maintaining the same cost and complexity. Therefore, the asymmetrical configuration for two common types of multilevel converters – diode-clamped and cascade converters – is investigated. Also, as well as addressing the maximisation of the output voltage resolution, some technical issues – such as adjacent switching vectors – should be taken into account in asymmetrical multilevel configurations to keep the total harmonic distortion (THD) and switching losses to a minimum. Thus, the asymmetrical diode-clamped converter is proposed. An appropriate asymmetrical DC link arrangement is presented for four-level diode-clamped converters by keeping adjacent switching vectors. In this way, five-level inverter performance is achieved for the same level of complexity of the four-level inverter. Dealing with the capacitor voltage imbalance problem in asymmetrical diodeclamped converters has inspired the proposal for two different DC-DC topologies with a suitable control strategy. A Triple-Output Boost (TOB) converter and a Boost 3-Output Voltage Sharing (Boost-3OVS) converter connected to the four-level diode-clamped converter are proposed to arrange the proposed asymmetrical DC link for the high modulation indices and unity power factor. Cascade converters have shown their abilities and strengths in medium and high power applications. Using asymmetrical H-bridge inverters, more voltage levels can be generated in output voltage with the same number of components as the symmetrical converters. The concept of cascading multilevel H-bridge cells is used to propose a fifteen-level cascade inverter using a four-level H-bridge symmetrical diode-clamped converter, cascaded with classical two-level Hbridge inverters. A DC voltage ratio of cells is presented to obtain maximum voltage levels on output voltage, with adjacent switching vectors between all possible voltage levels; this can minimize the switching losses. This structure can save five isolated DC sources and twelve switches in comparison to conventional cascade converters with series two-level H bridge inverters. To increase the quality in presented hybrid topology with minimum number of components, a new cascade inverter is verified by cascading an asymmetrical four-level H-bridge diode-clamped inverter. An inverter with nineteen-level performance was achieved. This synthesizes more voltage levels with lower voltage and current THD, rather than using a symmetrical diode-clamped inverter with the same configuration and equivalent number of power components. Two different predictive current control methods for the switching states selection are proposed to minimise either losses or THD of voltage in hybrid converters. High voltage spikes at switching time in experimental results and investigation of a diode-clamped inverter structure raised another problem associated with high-level high voltage multilevel converters. Power switching components with fast switching, combined with hard switched-converters, produce high di/dt during turn off time. Thus, stray inductance of interconnections becomes an important issue and raises overvoltage and EMI issues correlated to the number of components. Planar busbar is a good candidate to reduce interconnection inductance in high power inverters compared with cables. The effect of different transient current loops on busbar physical structure of the high-voltage highlevel diode-clamped converters is highlighted. Design considerations of proper planar busbar are also presented to optimise the overall design of diode-clamped converters.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A research study was conducted in a key area of project management: stakeholder and relationship management through communication - ‘the soft skills’. It was conducted with Diploma of Project Management graduates from one Australian Registered Training Organisation (RTO), the Australian College of Project Management (ACPM). The study was designed to initially identify the qualifications and project management experience of the participants. Further, it identified the respondents’ understanding of and attitude to commonly held principles and literature within the project management field as it relates to the soft skills of projects. This is specifically connected to their project experience and knowledge, approach to project communications, and the stakeholder’s needs. Some of the literature showed that through the management and application of the project soft skills by project managers may actually be a recipe for project success. Hence, an important underpinning of this study was that the project manager can enhance project success (or reduce the impact of failure) by identifying and prioritising stakeholders, developing and implementing strategies for engaging and communicating with them. The use of a positivist approach to this research study allowed for the evaluation and understanding of respondents to the emergent theories of successful projects being delivered through the management of stakeholders, communications, and relationships. Consequently, a quantitative approach to this study was undertaken. The participants were drawn from graduates who completed (graduated) from the ACPM with the Diploma of Project Management between January 2004 and December 2007 only. A list of graduates was collated from this period indicating that a total of 656 graduates have completed and graduated with the qualification. The data collection for this study was done in one phase only. The questionnaire was emailed individually by the researcher directly to the selected potential respondents. Subsequently, a total of 44 responses were received, providing an overall response rate of 43%. Two key factors emerged from the survey questionnaire. Firstly, the need for the soft skills to be incorporated in project management curriculum and education programs, and secondly, that successful projects are delivered through the management and application of the project soft skills. It is expected that the findings of this study be provided across various forums (such as vocational education and training, and project management conferences) and via project management bodies such as the Australian Institute of Project Management (AIPM) to inform learning and provide greater insight into the soft skills of project management. It is the contention of the researcher that this quantitative study of Diploma of Project Management graduates’ views and attitudes highlights the importance of project soft skills and its importance in the delivery of successful projects as well as being part of the competencies of a successful project manager. This study also revealed the value of project experience and knowledge as it pertains to the management and application of the project soft skills.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Pedestrian Interaction Patch Project (PIPP) seeks to exert influence over and encourage abnormal pedestrian behavior. By placing an unadvertised (and non recording) interactive video manipulation system and projection source in a high traffic public area, the PIPP allows pedestrians to privately (and publically) re-engage with a previously inactive physical environment, like a commonly used walkway or corridor. This system, the results of which are projected in real time on the architectural surface, inadvertently provides pedestrians with questions around preconceived notions of self and space. In an attempt to re-activate our relationship with the physical surrounds we occupy each day the PIPP creates a new set of memories to be recalled as we re-enter known environments once PIPP has moved on and as such re-enlivens our relationship with the everyday architecture we stroll past everyday. The PIPP environment is controlled using the software program Isadora, devised by Mark Coniglio at Troika Ranch, and contains a series of video manipulation patches that are designed to not only grab the pedestrians attention but to also encourage a sense of play and interaction between the architecture, the digital environment, the initially unsuspecting participant(s) and the pedestrian audience. The PIPP was included as part of the planned walking tour for the “Playing in Urban Spaces” seminar day, and was an installation that ran for the length of the symposium in a reclaimed pedestrian space that was encountered by both the participants and general public during the course of the day long event. Ideally once discovered PIPP encouraged pedestrians to return through the course of the seminar day to see if the environmental patches had changed or altered, and changed their standard route to include the PIPP installation or to avoid it, either way, encouraging an active response to the pathways normally traveled or newly discovered each day.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents the feasibility of using structural modal strain energy as a parameter employed in correlation- based damage detection method for truss bridge structures. It is an extension of the damage detection method adopting multiple damage location assurance criterion. In this paper, the sensitivity of modal strain energy to damage obtained from the analytical model is incorporated into the correlation objective function. Firstly, the sensitivity matrix of modal strain energy to damage is conducted offline, and for an arbitrary damage case, the correlation coefficient (objective function) is calculated by multiplying the sensitivity matrix and damage vector. Then, a genetic algorithm is used to iteratively search the damage vector maximising the correlation between the corresponding modal strain energy change (hypothesised) and its counterpart in measurement. The proposed method is simulated and compared with the conventional methods, e.g. frequency-error method, coordinate modal assurance criterion and multiple damage location assurance criterion using mode shapes on a numerical truss bridge structure. The result demonstrates the modal strain energy correlation method is able to yield acceptable damage detection outcomes with less computing efforts, even in a noise contaminated condition.