192 resultados para Hospitals -- Australia -- Risk management
Resumo:
Purpose – Rapid urbanisation, fragmented governance and recurrent flooding complicates resolution of DKI Jakarta’s chronic housing shortage. Failure to effectively implement planning decisionmaking processes poses potential human rights violations. Contemporary planning policy requires the relocation of households living in floodplains within fifteen metres of DKI Jakarta’s main watercourses; further constraining land availability and potentially requiring increased densification. The purpose of this paper is to re-frame planning decision-making to address risks of flooding and to increase community resilience. Design/methodology/approach – This paper presents a preliminary scoping study for a technologically enhanced participatory planning method, incorporating synthesis of existing information on urbanisation, governance, and flood risk management in Jakarta. Findings – Responsibility for flood risk management in DKI Jakarta is fragmented both within and across administrative boundaries. Decision-making is further complicated by: limited availability of land use data; uncertainty as to the delineated extent of watercourses, floodplains, and flood modelling; unclear risk and liability for infrastructure investments; and technical literacy of both public and government participants. Practical implications – This research provides information to facilitate consultation with government entities tasked with re-framing planning processes to increase public participation. Social implications – Reduction in risk exposure amongst DKI Jakarta’s most vulnerable populations addresses issues of social justice.
Resumo:
Background The aim of this study is to examine the flood fatality with a view to identifying risks which may inform public policy responses to future flood. On July 21st, 2012, Beijing suffered the heaviest rain since 1963. The average rainfall was 215 mm over a 24 hour period in the central city (301mm in Fangshan District). The rain resulted in a flood that caused severe health, social and financial impact. Results This flood caused 79 deaths. Of the 71 deaths for which a specific cause could be identified, 5 were rescue team members, 42 were killed by drowning (11 in the car), and the others by electricity shock, fallen house, falling items and lightning. The total financial cost was estimated to be US$ 1.7 billion. The causations of the deaths inform the risks associated with the flood. Discussion This flood had a catastrophic impact on Beijing, mainly due to the intensity of the rain (the rain was the heaviest in the modern Beijing history; possibly due to global warming and urban heat island effect), the vulnerability of the infrastructure (poor standards of drainage, disorganized water management systems and decreased permeability of the earth as a result of the city’s rapid development), and the capacity of the response system (mainly dependent on the awareness of the citizens, warning systems and the capacity of the emergency rescue). Implication Many risk management measures have been implemented as a result of this flood, including water level warning marks, flood safety education and warnings sent to mobile phones, a project to move about 74,500 farmers away from the flood-prone areas within 5 years. However, further measures targeted at the fundamental issues identified by this analysis are necessary, especially those targeting at health issues. These may include better planning, improved drainage systems and ecological development to increase permeability etc..
Resumo:
Our research examined how projects can draw together the fields of human resource management (HRM) and risk management (RM) to consider workforce-related risks on projects; particularly those with a large contingent workforce. It is argued that RM frameworks could be enhanced by a more comprehensive understanding of the specific potential non-technical “people risks” in projects. The study focussed on the Oil and Gas industry and undertook interviews with experts in the field. The findings are considered within the framework of key HRM areas; Management Practices, General Employment Practices, Staffing, HR Development, and Compensation and Benefits, along with Project Completion. Drawing together RM and HRM in a project environment, our research provides a unique opportunity to identify critical workforce-related risks. Such identification is the first step towards a more comprehensive approach to risk assessment and planning for mitigation of such risks in projects.
Resumo:
This research aims to explore and identify political risks on a large infrastructure project in an exaggerated environment to ascertain whether sufficient objective information can be gathered by project managers to utilise risk modelling techniques. During the study, the author proposes a new definition of political risk; performs a detailed project study of the Neelum Jhelum Hydroelectric Project in Pakistan; implements a probabilistic model using the principle of decomposition and Bayes probabilistic theorem and answers the question: was it possible for project managers to obtain all the relevant objective data to implement a probabilistic model?
Resumo:
This paper proposes a recommendation system that supports process participants in taking risk-informed decisions, with the goal of reducing risks that may arise during process execution. Risk reduction involves decreasing the likelihood and severity of a process fault from occurring. Given a business process exposed to risks, e.g. a financial process exposed to a risk of reputation loss, we enact this process and whenever a process participant needs to provide input to the process, e.g. by selecting the next task to execute or by filling out a form, we suggest to the participant the action to perform which minimizes the predicted process risk. Risks are predicted by traversing decision trees generated from the logs of past process executions, which consider process data, involved resources, task durations and other information elements like task frequencies. When applied in the context of multiple process instances running concurrently, a second technique is employed that uses integer linear programming to compute the optimal assignment of resources to tasks to be performed, in order to deal with the interplay between risks relative to different instances. The recommendation system has been implemented as a set of components on top of the YAWL BPM system and its effectiveness has been evaluated using a real-life scenario, in collaboration with risk analysts of a large insurance company. The results, based on a simulation of the real-life scenario and its comparison with the event data provided by the company, show that the process instances executed concurrently complete with significantly fewer faults and with lower fault severities, when the recommendations provided by our recommendation system are taken into account.
Resumo:
An outbreak detection and response system, using time series moving percentile method based on historical data, in China has been used for identifying dengue fever outbreaks since 2008. For dengue fever outbreaks reported from 2009 to 2012, this system achieved a sensitivity of 100%, a specificity of 99.8% and a median time to detection of 3 days, which indicated that the system was a useful decision tool for dengue fever control and risk-management programs in China.
Resumo:
This book represents a landmark effort to probe and analyze the theory and empirics of designing water disaster management policies. It consists of seven chapters that examine, in-depth and comprehensively, issues that are central to crafting effective policies for water disaster management. The authors use historical surveys, institutional analysis, econometric investigations, empirical case studies, and conceptual-theoretical discussions to clarify and illuminate the complex policy process. The specific topics studied in this book include a review and analysis of key policy areas and research priority areas associated with water disaster management, community participation in disaster risk reduction, the economics and politics of ‘green’ flood control, probabilistic flood forecasting for flood risk management, polycentric governance and flood risk management, drought management with the aid of dynamic inter-generational preferences, and how social resilience can inform SA/SIA for adaptive planning for climate change in vulnerable areas. A unique feature of this book is its analysis of the causes and consequences of water disasters and efforts to address them successfully through policy-rich, cross-disciplinary and transnational papers. This book is designed to help enrich the sparse discourse on water disaster management policies and galvanize water professionals to craft creative solutions to tackle water disasters efficiently, equitably, and sustainably. This book should also be of considerable use to disaster management professionals, in general, and natural resource policy analysts.
Development of multi-rotor localised surveillance using multi-spectral sensors for plant biosecurity
Resumo:
This report describes a proof of concept for multi-rotor localised surveillance using a multi-spectral sensor for plant biosecurity applications. A literature review was conducted on previous applications using airborne multispectral imaging for plant biosecurity purposes. A ready built platform was purchased and modified in order to fit and provide suitable clearance for a Tetracam Mini-MCA multispectral camera. The appropriate risk management documents were developed allowing the platform and the multi-spectral camera to be tested extensively. However, due to technical difficulties with the platform the Mini- MCA was not mounted to the platform. Once a suitable platform is developed, future extensions can be conducted into the suitability of the Mini-MCA for airborne surveillance of Australian crops.
Resumo:
Responding to mixed evidence on the decision-usefulness of annual report disclosures for derivative financial instruments to capital market participants, and concerns identified by practice, this paper examines usefulness in a direct study of user perceptions. Interviews with analysts from Australia’s four major banks reveal essential usefulness, limited by the disclosures’ failure to reflect companies’ actual use of derivatives throughout the period, and inability of users to understand companies’ off-balance sheet risk and risk management practices from information considered generic and boilerplate. The research complements and extends existing archival and survey research and provides new evidence suggesting low-cost ways for increasing usefulness. It supports the International Accounting Standards Board’s disclosure recommendations in its recent Discussion Paper: A Review of the Conceptual Framework for Financial Reporting, but, at the same time, highlights that for these proposed measures to be successful in relation to IFRS 7, they may need to address other issues. The research increases knowledge of the informational requirements of lenders, an important class of financial information user, and supports calls from practice for companies to improve their disclosure of material economic risks.
Resumo:
Purpose This paper discusses the development of a strategy game for enterprise education. It is argued that requiring students to initially struggle with the game’s rules and strategies results in a worthwhile test of their persistence and ability to manage ambiguity. Further, that in the absence of uncertainty, students will not benefit from the game’s potential contribution to their overall learning. Approach The paper is constructed around the infusion of student narratives and the author’s self-reflective thoughts. The papers explores the process of developing a game that; - 1) provides the students with access to an enterprise reality, - 2) strengthens their engagement with the theoretical foundations of their studies, and; - 3) provides a process for serious self-reflection. Findings Despite the mixed views presented in this paper, the game’s development thus far has been very successful. Students do enjoy and benefit from enduring the frustration of a pure contest. Having to work through uncertainty is a good practice for students in Higher Education, especially those engaged in enterprise education. Practical Implications Whilst the use of games in experiential education is not uncommon, consideration of how and why they are developed is not always well understood. This paper suggests that enterprise educators have significant opportunities to develop games that genuinely provide student access to the entrepreneur’s way of life. Value of Paper This paper provides evidence of how a game can be constructed to add significant value to an existing curriculum. It also provides evidence of the inner thoughts of students frustrated by a challenge they refuse to give up on. As such, it provides a valuable window through which to contemplate the minds of tomorrow’s nascent entrepreneurs.
Resumo:
We conducted an experiment to investigate the impact of sport scandal on consumer attitudes toward a range of sport stakeholders. We examined the effects of fans’ social identity (fan of scandalized team vs. fan of rival team), scandal severity (single perpetrator vs. multiple perpetrators) and the sponsor brand’s response to the scandal (sponsorship retention vs. termination) on consumers’ attitudes toward the implicated team, the scandal perpetrators, the sport, and sponsor brand. We find evidence of differential reactions to scandal reflecting social identity, such that fans support their own team despite increased scandal severity but negatively judge a rival team’s transgressions. Results suggest that where fans are concerned, sponsors may be better served to continue with a sponsorship following scandal than to terminate, even for some forms of severe scandal. However, termination may receive more positive evaluation from rival team fans; hence continuation of sponsorship needs to accompany a tempered approach.