636 resultados para Group strategy-proofness
Resumo:
IEC Technical Committee 57 (TC57) published a series of standards and technical reports for “Communication networks and systems for power utility automation” as the IEC 61850 series. Sampled value (SV) process buses allow for the removal of potentially lethal voltages and damaging currents inside substation control rooms and marshalling kiosks, reduce the amount of cabling required in substations, and facilitate the adoption of non-conventional instrument transformers. IEC 61850-9-2 provides an inter-operable solution to support multi-vendor process bus solutions. A time synchronisation system is required for a SV process bus, however the details are not defined in IEC 61850-9-2. IEEE Std 1588-2008, Precision Time Protocol version 2 (PTPv2), provides the greatest accuracy of network based time transfer systems, with timing errors of less than 100 ns achievable. PTPv2 is proposed by the IEC Smart Grid Strategy Group to synchronise IEC 61850 based substation automation systems. IEC 61850-9-2, PTPv2 and Ethernet are three complementary protocols that together define the future of sampled value digital process connections in substations. The suitability of PTPv2 for use with SV is evaluated, with preliminary results indicating that steady state performance is acceptable (jitter < 300 ns), and that extremely stable grandmaster oscillators are required to ensure SV timing requirements are met when recovering from loss of external synchronisation (such as GPS).
Resumo:
Background The relationship between positive parent-child interactions and optimal child development is well established. Families with a child with a disability may face additional challenges to establishing positive parent-child relationships. There are limited studies addressing the effectiveness of interventions which seek to address these issues with parents and young children with a disability. In particular, prior studies of music therapy with this group have been limited by small sample sizes and the use of measures of limited reliability and validity. Objective This study investigates the effectiveness of a short-term group music therapy intervention for parents who have a child with a disability and explores the factors associated with higher outcomes for participating families. Methods The participants were 201 mother-child dyads, where the child had a disability. Pre and post intervention parental questionnaires and clinician observation measures were taken on a range of parental wellbeing, parenting behaviours and child developmental factors. Descriptive data, t-tests for repeated measures and a predictive model tested via logistic regression are presented. Results Significant improvements pre to post were found for parent mental health, child communication and social skills, parenting sensitivity, parental engagement with child and acceptance of child, child responsiveness to parent, and child interest and participation in program activities. There was also evidence that parents were very satisfied with the program and that it brought social benefits to families. Reliable change on six or more indicators of parent or child functioning was predicted by attendance and parent education. Conclusions This study provides positive evidence for the effectiveness of group music therapy in promoting improved parental mental health, positive parenting and key child developmental areas. Whilst several limitations are discussed, the study does address some of the gaps in the music therapy evidence base in this area.
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
In a resource constrained business world, strategic choices must be made on process improvement and service delivery. There are calls for more agile forms of enterprises and much effort is being directed at moving organizations from a complex landscape of disparate application systems to that of an integrated and flexible enterprise accessing complex systems landscapes through service oriented architecture (SOA). This paper describes the analysis of strategies to detect supporting business services. These services can then be delivered in a variety of ways: web-services, new application services or outsourced services. The focus of this paper is on strategy analysis to identify those strategies that are common to lines of business and thus can be supported through shared services. A case study of a state government is used to show the analytical method and the detection of shared strategies.
Resumo:
The Raman spectra of a series of related minerals of the pinakiolite group of minerals have been collected and the spectra related to the mineral structure. These minerals are based upon an isolated BO33- ion. The site symmetry is reduced from D3h to C1. Intense Raman bands are observed for the minerals takeuchiite, pinakiolite, fredrikssonite and azoproite at 1084, 1086, 1086 and 1086 cm-1. These bands are assigned to the ν1 BO33- symmetric stretching mode. Low intensity Raman bands are observed for the minerals at 1345, 1748; 1435, 1748; 1435, 1750; 1436, 1749 cm-1. One probable assignment is to ν3 BO33- antisymmetric stretching mode. Intense Raman bands of takeuchiite, pinakiolite, fredrikssonite and azoproite at 712 cm-1 attributed to the ν2 out-of-plane bending mode. Importantly, through the comparison of the Raman spectra, the molecular structure of borate minerals with ill-defined structures can be obtained.
Resumo:
Raman spectra of two well-defined types of koritnigite crystals from the Jáchymov ore district, Czech Republic, were recorded and interpreted. No substantial differences were observed between both crystal types. Observed Raman bands were attributed to the (AsO3OH)2- stretching and bending vibrations, stretching and bending vibrations of water molecules and hydroxyl ions. Non-interpreted Raman spectra of koritnigite from the RRUFF database, and published infrared spectra of cobaltkoritnigite were used for comparison. The O-H...O hydrogen bond lengths in the crystal structure of koritnigite were inferred from the Raman spectra and compared with those derived from the X-ray single crystal refinement. The presence of (AsO3OH)2- units in the crystal structure of koritnigite was proved from the Raman spectra which supports the conclusions of the X-ray structure analysis.
Resumo:
Effective academic workforce staff development remains a challenge in higher education. This thesis-by-publication examined the importance of alternative paradigms for academic staff development, focusing specifically on arts-based learning as a non-traditional approach to transformative learning for management and self-development within the business of higher education. The research question asked was whether or not the facilitation of staff development through the practice of arts-based transformational learning supported academic aims in higher education, based on data obtained with the participants of the academic staff development program at one Australian university over a three year period. Over that three year period, eighty academics participated in one large metropolitan Australian university’s arts-based academic development program. The research approach required analysis of the transcribed one-on-one hermeneutic-based conversations with fifteen self-selected academics, five from each year, and with a focus group of twenty other self-selected academics from all three years. The study’s findings provided evidence that supported the need for academic staff development that prepared academics to be engaged and creative and therefore more likely to be responsive to emerging issues and to be innovative in the presence of constraints, including organisational constraints. The qualitative participative conversation transcription data found that arts-based lifelong learning processes provided participant perception of enhanced capabilities for self-creation and clarity of transformational action in academic career management. The study presented a new and innovative Artful Learning Wave Trajectory learning model to engender academic professional artistry. The findings provided developers with support for using a non-traditional strategy of transformational learning.
Resumo:
Automation technology can provide construction firms with a number of competitive advantages. Technology strategy guides a firm's approach to all technology, including automation. Engineering management educators, researchers, and construction industry professionals need improved understanding of how technology affects results, and how to better target investments to improve competitive performance. A more formal approach to the concept of technology strategy can benefit the construction manager in his efforts to remain competitive in increasingly hostile markets. This paper recommends consideration of five specific dimensions of technology strategy within the overall parameters of market conditions, firm capabilities and goals, and stage of technology evolution. Examples of the application of this framework in the formulation of technology strategy are provided for CAD applications, co-ordinated positioning technology and advanced falsework and formwork mechanisation to support construction field operations. Results from this continuing line of research can assist managers in making complex and difficult decisions regarding reengineering construction processes in using new construction technology and benefit future researchers by providing new tools for analysis. Through managing technology to best suit the existing capabilities of their firm, and addressing the market forces, engineering managers can better face the increasingly competitive environment in which they operate.
Resumo:
Pragmatic construction professionals, accustomed to intense price competition and focused on the bottom line, have difficulty justifying investments in advanced technology. Researchers and industry professionals need improved tools to analyze how technology affects the performance of the firm. This paper reports the results of research to begin answering the question, “does technology matter?” The researchers developed a set of five dimensions for technology strategy, collected information regarding these dimensions along with four measures of competitive performance in five bridge construction firms, and analyzed the information to identify relationships between technology strategy and competitive performance. Three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit—showed particularly strong correlations with the competitive performance indicators of absolute growth in contract awards and contract award value per technical employee. These findings indicate that technology does matter. The research also provides ways to analyze options for approaching technology and ways to relate technology to competitive performance for use by managers. It also provides a valuable set of research measures for technology strategy.
Resumo:
The antecedents of channel power (e.g. El-Ansary and Stern, 1972) and the impact of channel structure ( e.g. Anderson and Narus,1984) on channel dynamics have long been important topics within the channel literature. In addition to the theoretical and methodological contributions, research in these areas has helped channel managers to understand how power is generated and used in coordinating distribution strategies in different contexts. The study presented in this paper builds upon these previous literatures, which are first briefly reviewed below.
Resumo:
Overloaded truck traffic is a significant problem on highways around the world. Developing countries in particular, overloaded truck traffic causes large amounts of unexpected expenditure in terms of road maintenance because of premature pavement damage. Overloaded truck traffic is a common phenomenon in developing countries, because of inefficient road management and monitoring systems. According to the available literature, many developing countries are facing the same problem, which is economic loss caused by the existence of overloaded trucks in the traffic stream. This paper summarizes the available literature, news reports, journal articles and traffic research regarding overloaded traffic. It examines the issue of overloading and the strategies and legislation used in developed countries.
Resumo:
Proposed transmission smart grids will use a digital platform for the automation of substations operating at voltage levels of 110 kV and above. The IEC 61850 series of standards, released in parts over the last ten years, provide a specification for substation communications networks and systems. These standards, along with IEEE Std 1588-2008 Precision Time Protocol version 2 (PTPv2) for precision timing, are recommended by the both IEC Smart Grid Strategy Group and the NIST Framework and Roadmap for Smart Grid Interoperability Standards for substation automation. IEC 61850-8-1 and IEC 61850-9-2 provide an inter-operable solution to support multi-vendor digital process bus solutions, allowing for the removal of potentially lethal voltages and damaging currents from substation control rooms, a reduction in the amount of cabling required in substations, and facilitates the adoption of non-conventional instrument transformers (NCITs). IEC 61850, PTPv2 and Ethernet are three complementary protocol families that together define the future of sampled value digital process connections for smart substation automation. This paper describes a specific test and evaluation system that uses real time simulation, protection relays, PTPv2 time clocks and artificial network impairment that is being used to investigate technical impediments to the adoption of SV process bus systems by transmission utilities. Knowing the limits of a digital process bus, especially when sampled values and NCITs are included, will enable utilities to make informed decisions regarding the adoption of this technology.
Resumo:
Regeneration of osseous defects by tissue-engineering approach provides a novel means of treatment utilizing cell biology, materials science, and molecular biology. The concept of in vitro cultured osteoblasts having an ability to induce new bone formation has been demonstrated in the critical size defects using small animal models. The bone derived cells can be incorporated into bioengineered scaffolds and synthesize bone matrix, which on implantation can induce new bone formation. In search of optimal cell delivery materials, the extracellular matrix as cell carriers for the repair and regeneration of tissues is receiving increased attention. We have investigated extracellular matrix formed by osteoblasts in vitro as a scaffold for osteoblasts transplantation and found a mineralized matrix, formed by human osteoblasts in vitro, can initiate bone formation by activating endogenous mesenchymal cells. To repair the large bone defects, osteogenic or stem cells need to be prefabricated in a large three dimensional scaffold usually made of synthetic biomaterials, which have inadequate interaction with cells and lead to in vivo foreign body reactions. The interstitial extracellular matrix has been applied to modify biomaterials surface and identified vitronectin, which binds the heparin domain and RGD (Arg-Gly-Asp) sequence can modulate cell spreading, migration and matrix formation on biomaterials. We also synthesized a tri-block copolymer, methoxy-terminated poly(ethylene glycol)(MPEG)-polyL-lactide(PLLA)-polylysine(PLL) for human osteoblasts delivery. We identified osteogenic activity can be regulated by the molecular weight and composition of the triblock copolymers. Due to the sequential loss of lineage differentiation potential during the culture of bone marrow stromal cells that hinderers their potential clinical application, we have developed a clonal culture system and established several stem cell clones with fast growing and multi-differentiation properties. Using proteomics and subtractive immunization, several differential proteins have been identified and verified their potential application in stem cell characterization and tissue regeneration
Resumo:
Doctoral dissertation, Stanford University, California, 1993
Resumo:
This paper describes the background and methodology developed and employed in undertaking research developing a Knowledge Management Strategy for a key construction focused government agency. This paper reviews this methodology and examines a likely Knowledge Management Strategy. Two central objectives structure this Case Study: 1. Identify categories of important information generated by the Building Division, Queensland Department of Public Works in its service delivery to internal and external stake-holders, and 2. Formulate an appropriate and targeted Knowledge Management Strategy to meet the needs of the Queensland Building Capital Works program. The structure of this paper includes: *Description of the Queensland construction industry setting *Review the relevant literature *Design an appropriate research methodology *Analyse results *Formulate conclusions, contributions and implications of the targeted strategy.