325 resultados para Violin with orchestra, Arranged
Resumo:
The aim of this study was to determine the collection efficiency of ultrafine particles into an impinger fitted with a fritted nozzle tip as a means to increase contact surface area between the aerosol and the liquid. The influence of liquid sampling volume, frit porosity and the nature of the sampling liquid was explored and it was shown that all impact on the collection efficiency of particles smaller than 220 nm. Obtained values for overall collection efficiency were substantially higher (~30–95%) than have been previously reported, mainly due to the high deposition of particles in the fritted nozzle tip, especially in case of finer porosity frits and smaller particles. Values for the capture efficiency of the solvent alone ranged from 20 to 45%, depending on the type and the volume of solvent. Additionally, our results show that airstream dispersion into bubbles improves particle trapping by the liquid and that there is a difference in collection efficiencies based on the nature and volume of the solvent used.
Resumo:
Whisper Our Futures was an invited design proposal to produce a major public artwork for the State of Queensland’s 150th Anniversary Celebrations. It involved a network of 100 individual scrolling digital text boxes each with individual audio systems arranged together in a tessellated format. This form (specified by the originating brief) both mimicked the soaring gothic arches typical of Queensland cathedrals and was also suggestive of their stained glass windows. Each text module presented a message in both visual and audible forms for Queenslanders living 150 years hence - spoken both by the general public aw well as prominent figures. In this way the work was designed as a focus of future hope, historical reflection and inspiration to visitors to Queensland cathedrals throughout the entire year of celebrations (2009). The work was planned to premiere at Brisbane’s main Anglican Cathedral and then tour to nine other state cathedrals throughout 2009.---- Two staged proposals and budgets were invited throughout 2007. After the second successful proposal stage the State Premier and cabinet changed, ultimately leading the public art components to be dropped from the program. The proposal currently remains on file at the Queensland Premiers Office.