785 resultados para Performance Reports
Resumo:
The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.
Resumo:
Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.
Resumo:
Reinforced concrete structures are susceptible to a variety of deterioration mechanisms due to creep and shrinkage, alkali-silica reaction (ASR), carbonation, and corrosion of the reinforcement. The deterioration problems can affect the integrity and load carrying capacity of the structure. Substantial research has been dedicated to these various mechanisms aiming to identify the causes, reactions, accelerants, retardants and consequences. This has improved our understanding of the long-term behaviour of reinforced concrete structures. However, the strengthening of reinforced concrete structures for durability has to date been mainly undertaken after expert assessment of field data followed by the development of a scheme to both terminate continuing degradation, by separating the structure from the environment, and strengthening the structure. The process does not include any significant consideration of the residual load-bearing capacity of the structure and the highly variable nature of estimates of such remaining capacity. Development of performance curves for deteriorating bridge structures has not been attempted due to the difficulty in developing a model when the input parameters have an extremely large variability. This paper presents a framework developed for an asset management system which assesses residual capacity and identifies the most appropriate rehabilitation method for a given reinforced concrete structure exposed to aggressive environments. In developing the framework, several industry consultation sessions have been conducted to identify input data required, research methodology and output knowledge base. Capturing expert opinion in a useable knowledge base requires development of a rule based formulation, which can subsequently be used to model the reliability of the performance curve of a reinforced concrete structure exposed to a given environment.
Resumo:
Real-World Data Mining Applications generally do not end up with the creation of the models. The use of the model is the final purpose especially in prediction tasks. The problem arises when the model is built based on much more information than that the user can provide in using the model. As a result, the performance of model reduces drastically due to many missing attributes values. This paper develops a new learning system framework, called as User Query Based Learning System (UQBLS), for building data mining models best suitable for users use. We demonstrate its deployment in a real-world application of the lifetime prediction of metallic components in buildings
Resumo:
This paper deals with the problem of using the data mining models in a real-world situation where the user can not provide all the inputs with which the predictive model is built. A learning system framework, Query Based Learning System (QBLS), is developed for improving the performance of the predictive models in practice where not all inputs are available for querying to the system. The automatic feature selection algorithm called Query Based Feature Selection (QBFS) is developed for selecting features to obtain a balance between the relative minimum subset of features and the relative maximum classification accuracy. Performance of the QBLS system and the QBFS algorithm is successfully demonstrated with a real-world application
Resumo:
The quality of office indoor environments is considered to consist of those factors that impact occupants according to their health and well-being and (by consequence) their productivity. Indoor Environment Quality (IEQ) can be characterized by four indicators: • Indoor air quality indicators • Thermal comfort indicators • Lighting indicators • Noise indicators. Within each indicator, there are specific metrics that can be utilized in determining an acceptable quality of an indoor environment based on existing knowledge and best practice. Examples of these metrics are: indoor air levels of pollutants or odorants; operative temperature and its control; radiant asymmetry; task lighting; glare; ambient noise. The way in which these metrics impact occupants is not fully understood, especially when multiple metrics may interact in their impacts. While the potential cost of lost productivity from poor IEQ has been estimated to exceed building operation costs, the level of impact and the relative significance of the above four indicators are largely unknown. However, they are key factors in the sustainable operation or refurbishment of office buildings. This paper presents a methodology for assessing indoor environment quality (IEQ) in office buildings, and indicators with related metrics for high performance and occupant comfort. These are intended for integration into the specification of sustainable office buildings as key factors to ensure a high degree of occupant habitability, without this being impaired by other sustainability factors. The assessment methodology was applied in a case study on IEQ in Australia’s first ‘six star’ sustainable office building, Council House 2 (CH2), located in the centre of Melbourne. The CH2 building was designed and built with specific focus on sustainability and the provision of a high quality indoor environment for occupants. Actual IEQ performance was assessed in this study by field assessment after construction and occupancy. For comparison, the methodology was applied to a 30 year old conventional building adjacent to CH2 which housed the same or similar occupants and activities. The impact of IEQ on occupant productivity will be reported in a separate future paper
Resumo:
Worldwide, the current pattern of urban development is unsustainable and metropolitan planning and development strategies deliver poor environmental outcomes in relation to energy production. As a result, an increasing number of governments and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes rather than a ‘business as usual’ approach. This paper will summarise the findings from a study that explored the link between building orientation and energy efficiencies in sub-tropical and tropical climates. The study used a new thermal modelling software tool developed by CSIRO that responds more accurately to residential heating and cooling energy performance in those climate zones. This software tool responds to industry criticisms regarding cold climate modelling systems that do not make sufficient allowance for natural ventilation. The study examined a range of low, medium and high-density dwelling types and investigated the impact of orientation, insulation, ventilation and shading devices on energy efficiencies. This paper will examine the findings from the medium and high-density case study developments as these are relevant to residential developments in many South East Asian countries, such as Singapore, Hong Kong and Malaysia. Finally, the paper will explore the potential benefits that medium and high-density residential developments have in the development of ‘solar cities’ and ‘solar suburbs’.
Resumo:
The importance of designing sustainable buildings is gaining greater acceptance worldwide. Evidence of this is how regulators are incorporating sustainable design principles into building regulations and requirements. The aim being to increase the number of sustainable buildings and move from a traditional voluntary compliance to one that is mandatory. However, developing regulations that actually achieve these aims can be a difficult exercise. Several countries in South East Asia, such as Singapore and Malaysia, have performance based building regulations that are supplemented by prescriptive measures for achieving the desired performance. Australia too has similar building regulations and has had energy efficiency regulations within the Building Code of Australia for over a decade. This paper explores some of the difficulties and problems that Australian regulators have experienced with the performance-based method and the prescriptive or “deemed-to-comply” method and measures that have been taken to try and overcome these problems. These experiences act as a useful guide to all regulators considering the incorporation of sustainable design measures into their countries building regulations. The paper also speculates on future environmental requirements being incorporated into regulations, including the possibility of non-residential buildings being required to meet minimum energy efficiency requirements, and the possible systems that would need to be in place before such requirements were included. Finally, the paper looks at a possible way forward using direct assessment from electronic designs and introduces several software tools that are currently being developed that move towards achieving this goal. Keywords: Sustainable buildings, Performance-based, Regulations, Energy efficiency, Assessment tools.
Resumo:
There is evidence that many heating, ventilating & air conditioning (HVAC) systems, installed in larger buildings, have more capacity than is ever required to keep the occupants comfortable. This paper explores the reasons why this can occur, by examining a typical brief/design/documentation process. Over-sized HVAC systems cost more to install and operate and may not be able to control thermal comfort as well as a “right-sized” system. These impacts are evaluated, where data exists. Finally, some suggestions are developed to minimise both the extent of, and the negative impacts of, HVAC system over-sizing, for example: • Challenge “rules of thumb” and/or brief requirements which may be out of date. • Conduct an accurate load estimate, using AIRAH design data, specific to project location, and then resist the temptation to apply “safety factors • Use a load estimation program that accounts for thermal storage and diversification of peak loads for each zone and air handling system. • Select chiller sizes and staged or variable speed pumps and fans to ensure good part load performance. • Allow for unknown future tenancies by designing flexibility into the system, not by over-sizing. For example, generous sizing of distribution pipework and ductwork will allow available capacity to be redistributed. • Provide an auxiliary tenant condenser water loop to handle high load areas. • Consider using an Integrated Design Process, build an integrated load and energy use simulation model and test different operational scenarios • Use comprehensive Life Cycle Cost analysis for selection of the most optimal design solutions. This paper is an interim report on the findings of CRC-CI project 2002-051-B, Right-Sizing HVAC Systems, which is due for completion in January 2006.
Resumo:
The endeavour to obtain estimates of durability of components for use in lifecycle assessment or costing and infrastructure and maintenance planning systems is large. The factor method and the reference service life concept provide a very valuable structure, but do not resolve the central dilemma of the need to derive an extensive database of service life. Traditional methods of estimating service life, such as dose functions or degradation models, can play a role in developing this database, however the scale of the problem clearly indicates that individual dose functions cannot be derived for each component in each different local and geographic setting. Thus, a wider range of techniques is required in order to devise reference service life. This paper outlines the approaches being taken in the Cooperative Research Centre for Construction Innovation project to predict reference service life. Approaches include the development of fundamental degradation and microclimate models, the development of a situation-based reasoning ‘engine’ to vary the ‘estimator’ of service life, and the development of a database on expert performance (Delphi study). These methods should be viewed as complementary rather than as discrete alternatives. As discussed in the paper, the situation-based reasoning approach in fact has the possibility of encompassing all other methods.
Resumo:
In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
Despite the increasing significance of the construction industry as an emerging sector of the Australian economy, there is inadequate research performed on construction design firms in terms of theoretical and empirical foundations. Although past research has identified the barriers and success factors for firm market entry, evidence suggests that to date no research has explicitly explored the sustainability of construction design firms in international markets. SMEs and their approach to firm internationalisation differ significantly from large manufacturing firms and a vast majority of construction design firms operate as SMEs. This paper develops a sustainable business model for construction design SMEs, which rely upon the development of clear Client Following (CF) versus Market Seeking (MS) strategies to support internal firm strategic and operational management. The understanding of these strategies is vital as the application of either will shape the design management approach of firms, which would in turn impact on the sustainability of these firms in foreign markets. Long-term sustainability of firms in international markets relies heavily upon client satisfaction. Client and project team participants’ communication during various design processes has often been problematic and the added difficulty of communicating across international boundaries further compounds the problem of capturing and maintaining client’s requirements. Therefore this paper develops a model for economic sustainability of Australian construction design firms working in international markets by exploring factors that affect client satisfaction across international boundaries, through the development of business performance indicators. These include not only the critical financial capital but also other ‘softer’ indicators, namely: social, cultural and intellectual capital. These act as a firm’s measure of success and the acquisition of this type of capital will provide significant advantages to firms’ success, hence sustainability in international markets.
Resumo:
Many factors have the potential to influence human health. These factors need to be monitored to maintain health. As is the case with human health, construction projects have a number of critical factors that can facilitate a broad evaluation of project health. In order to use these factors as an indication of health, they need to be assessed. This assessment can help to achieve desired outcomes for the project. This paper discusses the approach of assessing Critical Success Factors (CSFs) using Key Performance Indicators (KPIs) to ascertain the immediate health of a construction project. This approach is applicable to all phases of construction projects and many construction procurement methods. KPIs have been benchmarked on the basis of industry standards and historical data. The robustness of the KPIs to assess the immediate health of a project has been validated using Australian and international case studies.