268 resultados para inter-rater reliability
Resumo:
This paper explores the impacts and extent of knowledge transfer (KT) in an undergraduate engineering transnational program with an Australian university partner at the University of Indonesia (UI) using an inter-university KT conceptual framework (Sutrisno, Lisana, & Pillay 2012). For the purpose of this paper, the opportunity for KT in curriculum design is examined. Given the explicit nature of curriculum knowledge, assessing each partner’s curriculum was pivotal in allowing UI to enrich its own curriculum. The KT mechanism of face-to-face contact between Indonesian and Australian academics led to not only transfer of knowledge related to the curriculum of the undergraduate program but also to other cooperation beyond the transnational program in the form of joint research and joint supervision of post-graduate theses. Positive inter-university dynamics, such as trust and willingness to work together between the partners were underpinned by the presence of key actors from both sides at the earlier stages of the partnership. Retrospectively exploring the KT process in the UI’s transnational programs with its Australian partner suggests that there have been both structured and unstructured mechanisms, highlighting the ubiquitous and unbounded nature of KT between universities. While initially successful in facilitating KT, due to rapid succession of persons in charge of the program and the increasing focus on revenue generation, the useful lessons and practices unfortunately are being lost. Although the intention to use the transnational program for KT was always implied, it gradually was overlooked by newer staff members. Based on UI’s experience as the first provider of transnational program in Indonesia and other similar cases in China, seemingly transnational programs driven by short-term immediate financial return are unsuccessful in facilitating KT due to sensitivities to unfavourable economic situation. Those that remain operational and contribute to knowledge exchange between the partners apparently have genuine long-term engagement objective.
Resumo:
Summary Background The final phase of a three phase study analysing the implementation and impact of the nurse practitioner role in Australia (the Australian Nurse Practitioner Project or AUSPRAC) was undertaken in 2009, requiring nurse telephone interviewers to gather information about health outcomes directly from patients and their treating nurse practitioners. A team of several registered nurses was recruited and trained as telephone interviewers. The aim of this paper is to report on development and evaluation of the training process for telephone interviewers. Methods The training process involved planning the content and methods to be used in the training session; delivering the session; testing skills and understanding of interviewers post-training; collecting and analysing data to determine the degree to which the training process was successful in meeting objectives and post-training follow-up. All aspects of the training process were informed by established educational principles. Results Interrater reliability between interviewers was high for well-validated sections of the survey instrument resulting in 100% agreement between interviewers. Other sections with unvalidated questions showed lower agreement (between 75% and 90%). Overall the agreement between interviewers was 92%. Each interviewer was also measured against a specifically developed master script or gold standard and for this each interviewer achieved a percentage of correct answers of 94.7% or better. This equated to a Kappa value of 0.92 or better. Conclusion The telephone interviewer training process was very effective and achieved high interrater reliability. We argue that the high reliability was due to the use of well validated instruments and the carefully planned programme based on established educational principles. There is limited published literature on how to successfully operationalise educational principles and tailor them for specific research studies; this report addresses this knowledge gap.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
Urban transit system performance may be quantified and assessed using transit capacity and productive capacity for planning, design and operational management. Bunker (4) defines important productive performance measures of an individual transit service and transit line. Transit work (p-km) captures transit task performed over distance. Transit productiveness (p-km/h) captures transit work performed over time. This paper applies productive performance with risk assessment to quantify transit system reliability. Theory is developed to monetize transit segment reliability risk on the basis of demonstration Annual Reliability Event rates by transit facility type, segment productiveness, and unit-event severity. A comparative example of peak hour performance of a transit sub-system containing bus-on-street, busway, and rail components in Brisbane, Australia demonstrates through practical application the importance of valuing reliability. Comparison reveals the highest risk segments to be long, highly productive on street bus segments followed by busway (BRT) segments and then rail segments. A transit reliability risk reduction treatment example demonstrates that benefits can be significant and should be incorporated into project evaluation in addition to those of regular travel time savings, reduced emissions and safety improvements. Reliability can be used to identify high risk components of the transit system and draw comparisons between modes both in planning and operations settings, and value improvement scenarios in a project evaluation setting. The methodology can also be applied to inform daily transit system operational management.
Resumo:
The Clarence-Moreton Basin (CMB) covers approximately 26000 km2 and is the only sub-basin of the Great Artesian Basin (GAB) in which there is flow to both the south-west and the east, although flow to the south-west is predominant. In many parts of the basin, including catchments of the Bremer, Logan and upper Condamine Rivers in southeast Queensland, the Walloon Coal Measures are under exploration for Coal Seam Gas (CSG). In order to assess spatial variations in groundwater flow and hydrochemistry at a basin-wide scale, a 3D hydrogeological model of the Queensland section of the CMB has been developed using GoCAD modelling software. Prior to any large-scale CSG extraction, it is essential to understand the existing hydrochemical character of the different aquifers and to establish any potential linkage. To effectively use the large amount of water chemistry data existing for assessment of hydrochemical evolution within the different lithostratigraphic units, multivariate statistical techniques were employed.
Resumo:
The ability to forecast machinery health is vital to reducing maintenance costs, operation downtime and safety hazards. Recent advances in condition monitoring technologies have given rise to a number of prognostic models which attempt to forecast machinery health based on condition data such as vibration measurements. This paper demonstrates how the population characteristics and condition monitoring data (both complete and suspended) of historical items can be integrated for training an intelligent agent to predict asset health multiple steps ahead. The model consists of a feed-forward neural network whose training targets are asset survival probabilities estimated using a variation of the Kaplan–Meier estimator and a degradation-based failure probability density function estimator. The trained network is capable of estimating the future survival probabilities when a series of asset condition readings are inputted. The output survival probabilities collectively form an estimated survival curve. Pump data from a pulp and paper mill were used for model validation and comparison. The results indicate that the proposed model can predict more accurately as well as further ahead than similar models which neglect population characteristics and suspended data. This work presents a compelling concept for longer-range fault prognosis utilising available information more fully and accurately.
Resumo:
The IEEE Subcommittee on the Application of Probability Methods (APM) published the IEEE Reliability Test System (RTS) [1] in 1979. This system provides a consistent and generally acceptable set of data that can be used both in generation capacity and in composite system reliability evaluation [2,3]. The test system provides a basis for the comparison of results obtained by different people using different methods. Prior to its publication, there was no general agreement on either the system or the data that should be used to demonstrate or test various techniques developed to conduct reliability studies. Development of reliability assessment techniques and programs are very dependent on the intent behind the development as the experience of one power utility with their system may be quite different from that of another utility. The development and the utilization of a reliability program are, therefore, greatly influenced by the experience of a utlity and the intent of the system manager, planner and designer conducting the reliability studies. The IEEE-RTS has proved to be extremely valuable in highlighting and comparing the capabilities (or incapabilities) of programs used in reliability studies, the differences in the perception of various power utilities and the differences in the solution techniques. The IEEE-RTS contains a reasonably large power network which can be difficult to use for initial studies in an educational environment.
Resumo:
The IEEE Reliability Test System (RTS) developed by the Application of Probability Method Subcommittee has been used to compare and test a wide range of generating capacity and composite system evaluation techniques and subsequent digital computer programs. A basic reliability test system is presented which has evolved from the reliability education and research programs conducted by the Power System Research Group at the University of Saskatchewan. The basic system data necessary for adequacy evaluation at the generation and composite generation and transmission system levels are presented together with the fundamental data required to conduct reliability-cost/reliability-worth evaluation
Resumo:
A set of basic reliability indices at the generation and composite generation and transmission levels for a small reliability test system are presented. The test system and the results presented have evolved from reliability research and teaching programs. The indices presented are for fundamental reliability applications which should be covered in a power system reliability teaching program. The RBTS test system and the basic indices provide a valuable reference for faculty and students engaged in reliability teaching and research
Resumo:
In this paper a combined subtransmission and distribution reliability analysis of SEQEB’s outer suburban network is presented. The reliability analysis was carried out with a commercial software package which evaluates both energy and customer indices. Various reinforcement options were investigated to ascertain the impact they have on the reliability of supply seen by the customers. The customer and energy indices produced by the combined subtransmission and distribution reliability studies contributed to optimise capital expenditure to the most effective areas of the network.
Resumo:
Capacity probability models of generating units are commonly used in many power system reliability studies, at hierarchical level one (HLI). Analytical modelling of a generating system with many units or generating units with many derated states in a system, can result in an extensive number of states in the capacity model. Limitations on available memory and computational time of present computer facilities can pose difficulties for assessment of such systems in many studies. A cluster procedure using the nearest centroid sorting method was used for IEEE-RTS load model. The application proved to be very effective in producing a highly similar model with substantially fewer states. This paper presents an extended application of the clustering method to include capacity probability representation. A series of sensitivity studies are illustrated using IEEE-RTS generating system and load models. The loss of load and energy expectations (LOLE, LOEE), are used as indicators to evaluate the application
Resumo:
This paper present an efficient method using system state sampling technique in Monte Carlo simulation for reliability evaluation of multi-area power systems, at Hierarchical Level One (HLI). System state sampling is one of the common methods used in Monte Carlo simulation. The cpu time and memory requirement can be a problem, using this method. Combination of analytical and Monte Carlo method known as Hybrid method, as presented in this paper, can enhance the efficiency of the solution. Incorporation of load model in this study can be utilised either by sampling or enumeration. Both cases are examined in this paper, by application of the methods on Roy Billinton Test System(RBTS).
Resumo:
The reliable operation of the electrical system at Callide Power Station is of extreme importance to the normal everyday running of the Station. This study applied the principles of reliability to do an analysis on the electrical system at Callide Power Station. It was found that the level of expected outage cost increased exponentially with a declining level of maintenance. Concluding that even in a harsh economic electricity market where CS Energy tries and push their plants to the limit, maintenance must not be neglected. A number of system configurations were found to increase the reliability of the system and reduce the expected outage costs. A number of other advantages were identified as a result of using reliability principles to do this study on the Callide electrical system configuration.
Resumo:
This paper presents a reliability assessment of a substation, part of the Queensland transmission network in Australia. As part of a maintenance considerations, this study utilises the substation reliability assessment package STAREL to quantitatively compare the reliability improvement achieved by two circuit breaker reinforcement alternatives for Swanbank circuit breaker replacement or refurbishment. Substation reliability is interpreted on the basis of outage frequency and outage duration indices for each individual transmission line terminated in Swanbank 'B' substation. By considering the reliability indices in this paper with the cost associated conducted by POWERLINK Queensland, a Swanbank 'B' reinforcement alternative can be selected that optimises both transmission line security and the costs incurred in achieving it.
Resumo:
Reliability is an integral component of modern power system design, planning and management. This paper uses the Markov approach to substation reliability evaluation using dedicated reliability software. This technique was applied to yield reliability indices for an existing and important substation in the POWERLINK QUEENSLAND 275 kV transmission network. Reliability indices were also determined for several reinforcement alternatives for this substation with the aim of improving substation reliability. The economic feasibility of achieving higher levels of reliability was also taken into account.