710 resultados para construction productivity


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer can prevent the reinvention of systems and ideas as well as the repetition of errors. Doing so will save substantial time, as well as contribute to better performance of projects and project-based organisations (PBOs). Despite the importance of knowledge, PBOs face serious barriers to the effective transfer of knowledge, while their characteristics, such as unique and innovative approaches taken during every project, mean they have much to gain from knowledge transfer. As each new project starts, there is the strong potential to reinvent the process, rather than utilise learning from previous projects. In fact, rework is one of the primary factors contributing to construction industry's poor performance and productivity. Current literature has identified several barriers to knowledge transfer in organisational settings in general, and not specifically PBOs. However, PBOs significantly differ from other types of organisations. PBOs operate mainly on temporary projects, where time is a crucial factor and people are more mobile than in other organisational settings. The aim of this research is to identify the key barriers that prevent effective knowledge transfer for PBOs, exclusively. Interviews with project managers and senior managers of PBOs complement the analysis of the literature and provide professional expertise. This research is crucial to gaining a better understanding of obstacles that hinder knowledge transfer in projects. The main contribution of this research is exclusive for PBO, list of key barriers that organisation and project managers need to consider to ensure effective knowledge transfer and better project management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Joint ventures can take many forms and can be formed for different reasons, from sharing resources to creating future business opportunities. At the same time, there is increasing interest and discussion of alternative procurement methods, moving away from traditional procurement systems to relational approaches. Business systems and strategies need to be redefined and move from a short-term project to project culture to a more strategic, long-term perspective. Joint ventures of construction organisations, global and local, have become increasingly popular to deliver large-scale infrastructure construction projects. However, successful strategic collaborations require project organisations to formulate a fit between contractual and operational arrangements for each situation. This study reviews the movement from traditional procurement methods towards relational contracting approaches in Queensland, Australia. The study examines the organisational factors that facilitates sustainable relationship between project organisations and hence, lead to long-term business success. This paper reports on initial findings captured from a survey undertaken with construction contracting organisations in Australia, focusing on the supply chain relationships. Contractors’ perceptions of the relationship management process and the engagement of the supply chain are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Anecdotal evidence highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Information is limited however regarding the prevalence of AODs in the workplace and there is limited evidential guidance regarding how to effectively address it. This research aimed to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A national qualitative and quantitative evaluation of the use of AODs was conducted with approximately 500 employees. Results indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption and support the need for evidence-based, tailored responses. This is the first known study to scientifically evaluate the use of AODs and potential workplace safety impacts in the construction sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper charts the history and development of the Hong Kong Housing Department (HKHD) Performance Assessment Scoring System (PASS) from 1990 to the present day and examines its effect on facilitating change to the quality of construction work of building contractors engaged in the production of public sector housing projects Hong Kong. The paper builds partly on empirical research carried out by the author as part of a doctoral thesis from 2000 to 2005, on experiential knowledge and also on some relevant case studies. The outcomes from this earlier research and validation of PASS based on results derived from the system since the research was originally undertaken are of benefit to practitioners and academics working and studying in the areas of performance assessment and organisational culture and change. The conclusions presented in the paper further underpin the connection established in previous research between strong organisational culture and project and corporate success. Organisational culture was measured using a survey instrument originally developed by Denison and Neale (1994), adapted for the environment of the study, and corporate success was measured by the PASS system mentioned above. The major results of the original study indicate that there is significant linkage between strong organisational cultures and business success and the detailed findings were that, (1) strong organisational culture was positively associated a high level of company effectiveness, (2) a high level of company effectiveness was positively associated with the cultural traits of ‘consistency’, ‘adaptability’ and ‘mission’, and (3) a high level of company effectiveness was positively associated with the combined cultural traits represented by the dimensions of ‘external focus’ and ‘stable culture’. Several opportunities to take forward this research have been identified, including extending the study to other countries and also longitudinally re-evaluating some of the original case studies to ascertain how organisational cultures have changed or further developed in relation to the changing construction climate in Hong Kong.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Worldwide, education systems have undergone unprecedented change due to a variety of economic, social, and political forces (Limerick, Cunnington & Crowther, 2002). The People’s Republic of China (PRC) is no exception. Continuous educational reform at primary and secondary levels in Mainland China has created new challenges and accountabilities for school principals. The important role of principals in primary and secondary schools has been acknowledged in both policy documents and the broader literature (Central Committee of the Chinese Communist Party, 1985; F. Chen, 2005; Chu, 2003; W. Huang, 2005; T. Wang, 2003). Yet, most of the literature on primary and secondary school principals in Mainland China is prescriptive in nature, identifying from the perspectives of researchers and academics what principals should do and how they should enact leadership. Lacking in this research is an awareness of the daily practices and lived experiences of principals. Furthermore, within the small body of writing on primary and secondary school principals in Mainland China, gender is seldom given any attention. To date, only a small number of empirical studies have focused on female principals as a specific category of research (Zen, 2004; Zhong, 2004). This study aimed to explore the professional lives of two female exemplary school principals in urban primary schools in Mainland China. A qualitative exploratory case study was used. Semi-structured interviews with each individual female principal, with six teachers in each of the school sites and with the superintendent of each principal were conducted. Field observations and document analysis were also undertaken to obtain multiple insights about their leadership practices. The conceptual framework was based largely on the theory of Gronn (1999) and incorporated five core leadership practices (vision building, ethical considerations, teaching and learning, power utilisation, and dealing with risks and challenges) taken from the wider literature. The key findings of this study were twofold. Firstly, while the five leadership practices were evident in the leadership of the two principals, this study identified some subtle differences in the way they approached each of them. Secondly, contextual factors such as Chinese traditional culture, the contemporary societal context, and the school organisational context, in addition to the biographical experiences of each principal were significant factors in shaping the way in which they exercised their leadership practices in the schools.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre (CRC) for Construction Innovation is Australia’s national centre for research and innovation focused on the needs of the property, design, construction and facility management sectors. The period covered by this report is from 1 July 2001 to 30 October 2009. The report comprises of two parts. Part A details the future and possible future impact of the CRC including: The Future of the CRC, Research and Commercialisation, Economic Benefit to Australia, Public Good Benefits to Australia. Part B details the achievements during the funding period including: Economic Benefit and Commercialisation, Uptake of Research Results, Impact of Education Programs, CRC Operations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A strong designated verifier signature scheme makes it possible for a signer to convince a designated verifier that she has signed a message in such a way that the designated verifier cannot transfer the signature to a third party, and no third party can even verify the validity of a designated verifier signature. We show that anyone who intercepts one signature can verify subsequent signatures in Zhang-Mao ID-based designated verifier signature scheme and Lal-Verma ID-based designated verifier proxy signature scheme. We propose a new and efficient ID-based designated verifier signature scheme that is strong and unforgeable. As a direct corollary, we also get a new efficient ID-based designated verifier proxy signature scheme.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To date, most theories of business models have theorized value capture assuming that appropriability regimes were exogenous and that the firm would face a unique, ideal-typical appropriability regime. This has led theory contributions to focus on governance structures to minimize transaction costs, to downplay the interdepencies between value capture and value creation, and to ignore revenue generation strategies. We propose a reconceptualization of business models value capture mechanisms that rely on assumptions of endogeneity and multiplicity of appropriability regimes. This new approach to business model construction highlights the interdependencies and trade-offs between value creation and value capture offered by different types and combinations of appropriability regimes. The theory is illustrated by the analysis of three cases of open source software business models

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Patients with severe back deformities can greatly benefit from customized medical seating. Customized medical seating is made by taking measurements of each individual patient and making the seat as per these measurements. The current measuring systems employed by the industry are limited to use in clinics which are generally located only in major population centres. Patients living in remote areas are severely affected by this as the clinics could be far away and inaccessible for these patients. To provide service of customized medical seating requires a new measurement system which is portable so that the system could be transported to the patients in remote areas. The requirements for a new measurement system are analysed to suite the needs of Equipment Technology Services of the Cerebral Palsy League of Queensland. Design for a new measurement system was conceptualised by reviewing systems and technologies in various scientific disciplines. Design for a new system was finalised by optimizing each individual component. The final approach was validated by measuring difficult models and repeating the process to check for process variances. This system has now been adopted for clinical evaluation by ETS Suggestions have been made for further improvements in this new measurement approach.