272 resultados para Train Crashworthiness
Resumo:
The steady problem of free surface flow due to a submerged line source is revisited for the case in which the fluid depth is finite and there is a stagnation point on the free surface directly above the source. Both the strength of the source and the fluid speed in the far field are measured by a dimensionless parameter, the Froude number. By applying techniques in exponential asymptotics, it is shown that there is a train of periodic waves on the surface of the fluid with an amplitude which is exponentially small in the limit that the Froude number vanishes. This study clarifies that periodic waves do form for flows due to a source, contrary to a suggestion by Chapman & Vanden-Broeck (2006, J. Fluid Mech., 567, 299--326). The exponentially small nature of the waves means they appear beyond all orders of the original power series expansion; this result explains why attempts at describing these flows using a finite number of terms in an algebraic power series incorrectly predict a flat free surface in the far field.
Resumo:
At present, for mechanical power transmission, Cycloidal drives are most preferred - for compact, high transmission ratio speed reduction, especially for robot joints and manipulator applications. Research on drive-train dynamics of Cycloidal drives is not well-established. This paper presents a testing rig for Cycloidal drives, which would produce data for development of mathematical models and investigation of drive-train dynamics, further aiding in optimising its design
Resumo:
Background WSUD implementation in the Gold Coast City Council area commenced more than a decade ago. As a result, Council is expected to be in possession of WSUD assets valued at over tens of million dollars. The Gold Coast City Council is responsible for the maintenance and long-term management of these WSUD assets. Any shortcoming in implementation of best WSUD practices can potentially result in substantial liabilities and ineffective expenditure for the Council in addition to reduced efficiencies and outcomes. This highlights the importance of periodic auditing of WSUD implementation. Project scope The overall study entailed the following tasks: * A state-of-the-art literature review of the conceptual hydraulic and water quality treatment principles, current state of knowledge in relation to industry standards, best practice and identification of knowledge gaps in relation to maintenance and management practices and potential barriers to the implementation of WSUD. * Council stakeholder interviews to understand current practical issues in relation to the implementation of WSUD and the process of WSUD application from development application approval to asset management. * Field auditing of selected WSUD systems for condition assessment and identification of possible strengths and weaknesses in implementation. * Review of the Land Development Guidelines in order to identify any gaps and to propose recommendations for improvement. Conclusions Given below is a consolidated summary of the findings of the study undertaken. State-of-the-art literature review Though the conceptual framework for WSUD implementation is well established, the underlying theoretical knowledge underpinning the treatment processes and maintenance regimes and life cycle costing are still not well understood. Essentially, these are the recurring themes in the literature, namely, the inadequate understanding of treatment processes and lack of guidance to ensure specificity of maintenance regimes and life cycle costing of WSUDs. The fundamental barriers to successful WSUD implementation are: * Lack of knowledge transfer – This essentially relates to the lack of appropriate dissemination of research outcomes and the common absence of protocols for knowledge transfer within the same organisation. * Cultural barriers – These relate to social and institutional factors, including institutional inertia and the lack of clear understanding of the benefits. * Fragmented responsibilities – This results from poor administrative integration within local councils in relation to WSUDs. * Technical barriers – These relate to lack of knowledge on operational and maintenance practices which is compounded by model limitations and the lack of long-term quantitative performance evaluation data. * Lack of engineering standards – Despite the availability of numerous guidelines which are non-enforceable and can sometimes be confusing, there is a need for stringent engineering standards. The knowledge gaps in relation to WSUDs are only closing very slowly. Some of the common knowledge gaps identified in recent publications have been recognised almost a decade ago. The key knowledge gaps identified in the published literature are: * lack of knowledge on operational and maintenance practices; * lack of reliable methodology for identifying life cycle issues including costs; * lack of technical knowledge on system performance; * lack of guidance on retrofitting in existing developments. Based on the review of barriers to WSUD implementation and current knowledge gaps, the following were identified as core areas for further investigation: * performance evaluation of WSUD devices to enhance model development and to assess their viability in the context of environmental, economic and social drivers; establishing realistic life cycle costs to strengthen maintenance and asset management practices; * development of guidelines specific to retrofitting in view of the unique challenges posed by existing urban precincts together with guidance to ensure site specificity; establishment of a process for knowledge translation for enhancing currently available best practice guidelines; * identification of drivers and overcoming of barriers in the areas of institutional fragmentation, knowledge gaps and awareness of WSUD practices. GCCC stakeholder interviews Fourteen staff members involved in WSUD systems management in the Gold Coast City Council, representing four Directorates were interviewed using a standard questionnaire. The primary issues identified by the stakeholders were: * standardisation of WSUD terminology; * clear protocols for safeguarding devices during the construction phase; * engagement of all council stakeholders in the WSUD process from the initial phase; * limitations in the Land Development Guidelines; * ensuring public safety through design; * system siting to avoid conflicts with environmental and public use of open space; * provision of adequate access for maintenance; * integration of social and ecosystem issues to ensure long-term viability of systems in relation to both, vandalism and visual recreation; * lack of performance monitoring and inadequacy of the maintenance budget; * lack of technical training for staff involved in WSUD design approvals and maintenance; incentives for developers for acting responsibly in stormwater management. Field auditing of WSUD systems A representative cross section of WSUD systems in the Gold Coast were audited in the field. The following strengths and weaknesses in WSUD implementation were noted: * The implementation of WSUD systems in the field is not consistent. * The concerns raised by the stakeholders during the interviews in relation to WSUD implementation was validated from the observations from the field auditing, particularly in relation to the following: * safeguarding of devices during the construction phase * public safety * accessibility for maintenance * lack of performance monitoring by Council to assess system performance * inadequate maintenance of existing systems to suit site specific requirements. * A treatment train approach is not being consistently adopted. * Most of the systems audited have satisfactorily catered for public safety. Accessibility for maintenance has been satisfactorily catered for in most of the systems that were audited. * Systems are being commissioned prior to construction activities being substantially completed. * The hydraulic design of most systems appears to be satisfactory. * The design intent of the systems is not always clear. Review of Land Development Guidelines The Land Development Guidelines (TDG) was extensively reviewed and the following primary issues were noted in relation to WSUD implementation: * the LDG appears to have been prepared primarily to provide guidance to developers. It is not clear to what extent the guidelines are applicable to Council staff involved in WSUD maintenance and management; * Section 13 is very voluminous and appears to be a compilation of a series of individual documents resulting in difficulties in locating specific information, a lack of integration and duplication of information; * the LDG has been developed with a primary focus on new urban precinct development and the retrofitting of systems in existing developments has not been specifically discussed; * WSUDs are discussed in two different sections in the LDG and it is not clear which section takes precedence as there are inconsistencies between the two sections; there is inconsistent terminology being used; * there is a need for consolidation of information provided in different sections in the LDG; * there are inconsistencies in the design criteria provided; * there is a need for regular updating of the LDG to ensure that the information provided encompasses the state-of-the-art; * there is limited guidance provided for the preparation of maintenance plans and life cycle costing to assist developers in asset handover and to assist Council staff in assessment. * Based on these observations, eleven recommendations have been provided which are discussed below. Additionally, the stakeholder provided the following specific comments during the interviews in relation to the LDG: * lack of flexibility to cover the different stages of the life cycle of the systems; * no differentiation in projects undertaken by developers and Council; * inadequate information with regards to safety issues such as maximum standing water depth, fencing and safety barriers and public access; * lack of detailed design criteria in relation to Crime Prevention through Environmental Design, safety, amenity, environment, surrounding uses and impacts on surroundings; * inadequate information regarding maintenance requirements specific to the assessment and compliance phases; * recommendations for plantings are based primarily on landscape requirements rather than pollutant uptake capability. Recommendations With regards to the Land Development Guidelines, the following specific recommendations are provided: 1. the relevant sections and their extent of applicability to Council should be clearly identified; 2. integration of the different subsections within Section 13 and re-formatting the document for easy reference; 3. the maintenance guidelines provided in Section 13 should be translated to a maintenance manual for guidance of Council staff; 4. should consider extending the Guidelines to specifically encompass retrofitting of WSUD systems to existing urban precincts; 5. Section 3 needs to be revised to be made consistent with Section 13, to ensure priority for WSUD practices in urban precincts and to move away from conventional stormwater drainage design such as kerb and channelling; 6. it would also be good to specify as to which Section takes predominance in relation to stormwater drainage. It is expected that Section 13 would take predominance over the other sections in the LDG; 7. terminology needs to be made consistent to avoid confusion among developers and Council staff. Water Sensitive Urban Design is the term commonly used in Australia for stormwater quality treatment, rather than Stormwater Quality Improvement Devices. This once again underlines the need for ensuring consistency between Section 3 and Section 13; 8. it would also be good if there is a glossary of commonly used terms in relation to WSUD for use by all stakeholders and which should also be reflected in the LDG; 9. consolidation of all WSUD information into one section should be considered together with appropriate indicators in other LDG Sections regarding the availability of WSUD information. Ensuring consistency in the information provided is implied; 10. Section 13 should be updated at regular intervals to ensure the incorporation of the latest in research outcomes and incorporating criteria and guidance based on the state-of-the-art knowledge. The updating could be undertaken, say, in five year cycles. This would help to overcome the current lack of knowledge transfer; 11. the Council should consider commissioning specialised studies to extend the current knowledge base in relation to WSUD maintenance and life cycle costing. Additionally, Recommendation 10 is also applicable in this instance. The following additional recommendations are made based on the state-of-the-art literature review, stakeholder interviews and field auditing of WSUD systems: 1. Performance monitoring of existing systems to assess improvements to water quality, identify modifications and enhancements to improve performance; 2. Appropriate and monitored maintenance during different phases of development of built assets over time is needed to investigate the most appropriate time/phase of development to commission the final WSUD asset. 3. Undertake focussed investigations in the areas of WSUD maintenance and asset management in order to establish more realistic life cycle costs of systems and maintenance schedules; 4. the engagement of all relevant Council stakeholders from the initial stage of concept planning through to asset handover, and ongoing monitoring. This close engagement of internal stakeholders will assist in building a greater understanding of responsibilities and contribute to overcoming constraints imposed by fragmented responsibilities; 5. the undertaking of a public education program to inform the community of the benefits and ecosystem functions of WSUD systems; 6. technical training to impart state-of-the-art knowledge to staff involved in the approval of designs and maintenance and management of WSUD projects; 7. during the construction phase, it is important to ensure that appropriate measures to safeguard WSUD devices are implemented; 8. risks associated with potential public access to open water zones should be minimised with the application of appropriate safety measures; 9. system siting should ensure that potential conflicts are avoided with respect to public and ecosystem needs; 10. integration of social and ecosystem issues to ensure long-term viability of systems; provide incentives to developers who are proactive and responsible in the area of stormwater management.
Resumo:
This thesis reports on an investigation to develop an advanced and comprehensive milling process model of the raw sugar factory. Although the new model can be applied to both, the four-roller and six-roller milling units, it is primarily developed for the six-roller mills which are widely used in the Australian sugar industry. The approach taken was to gain an understanding of the previous milling process simulation model "MILSIM" developed at the University of Queensland nearly four decades ago. Although the MILSIM model was widely adopted in the Australian sugar industry for simulating the milling process it did have some incorrect assumptions. The study aimed to eliminate all the incorrect assumptions of the previous model and develop an advanced model that represents the milling process correctly and tracks the flow of other cane components in the milling process which have not been considered in the previous models. The development of the milling process model was done is three stages. Firstly, an enhanced milling unit extraction model (MILEX) was developed to access the mill performance parameters and predict the extraction performance of the milling process. New definitions for the milling performance parameters were developed and a complete milling train along with the juice screen was modelled. The MILEX model was validated with factory data and the variation in the mill performance parameters was observed and studied. Some case studies were undertaken to study the effect of fibre in juice streams, juice in cush return and imbibition% fibre on extraction performance of the milling process. It was concluded from the study that the empirical relations developed for the mill performance parameters in the MILSIM model were not applicable to the new model. New empirical relations have to be developed before the model is applied with confidence. Secondly, a soluble and insoluble solids model was developed using modelling theory and experimental data to track the flow of sucrose (pol), reducing sugars (glucose and fructose), soluble ash, true fibre and mud solids entering the milling train through the cane supply and their distribution in juice and bagasse streams.. The soluble impurities and mud solids in cane affect the performance of the milling train and further processing of juice and bagasse. New mill performance parameters were developed in the model to track the flow of cane components. The developed model is the first of its kind and provides some additional insight regarding the flow of soluble and insoluble cane components and the factors affecting their distribution in juice and bagasse. The model proved to be a good extension to the MILEX model to study the overall performance of the milling train. Thirdly, the developed models were incorporated in a proprietary software package "SysCAD’ for advanced operational efficiency and for availability in the ‘whole of factory’ model. The MILEX model was developed in SysCAD software to represent a single milling unit. Eventually the entire milling train and the juice screen were developed in SysCAD using series of different controllers and features of the software. The models developed in SysCAD can be run from macro enabled excel file and reports can be generated in excel sheets. The flexibility of the software, ease of use and other advantages are described broadly in the relevant chapter. The MILEX model is developed in static mode and dynamic mode. The application of the dynamic mode of the model is still under progress.
Resumo:
Road safety barriers are used to redirect traffic at roadside work-zones. When filled with water, these barriers are able to withstand low to moderate impact speeds up to 50kmh-1. Despite this feature, Portable Water-filled barriers (PWFB) face challenges such as large lateral displacements, tearing and breakage during impact; especially at higher speeds. This study explores the use of composite action to enhance the crashworthiness of PWFBs and enable their usage at higher speeds. Initially, energy absorption capability of water in PWFB is investigated. Then, composite action of the PWFB with the introduction of steel frame is considered to evaluate its enhanced impact performance. Findings of the study show that the initial height of the impact must be lower than the free surface level of water in a PWFB in order for the water to provide significant crash energy absorption. In general, an impact of a road barrier with 80% filled is a good estimation. Furthermore, the addition of a composite structure greatly reduces the probability of tearing by decreasing the strain and impact energy transferred to the shell container. This allows the water to remain longer in the barrier to absorb energy via inertial displacements and sloshing response. Information from this research will aid in the design of new generation roadside safety structures aimed to increase safety in modern roadways.
Resumo:
Disciplines have emerged as an alternative administrative structure to departments or schools in Australian universities. We presently investigate the pattern of discipline use and by way of case study examine a role for distributed leadership in discipline management. Over forty per cent of Australian universities currently employ disciplines, especially within faculties of sciences, engineering and medicine. No trend is observed according to institutional age, state, or historical origins. Effective planning, retention of corporate knowledge and good communication are important during the transition period. Moreover, it is vital that professional staff continue to work closely alongside academics as extended members of the discipline. Distributed leadership encourages this interaction. The duties of a discipline leader can be similar to those faced by a head of department. Universities should therefore establish clear policies, position descriptions and appropriate remuneration packages in order to recruit, train and retain staff within this emerging academic management role.
Resumo:
In Social Science (Organization Studies, Economics, Management Science, Strategy, International Relations, Political Science…) the quest for addressing the question “what is a good practitioner?” has been around for centuries, with the underlying assumptions that good practitioners should lead organizations to higher levels of performance. Hence to ask “what is a good “captain”?” is not a new question, we should add! (e.g. Tsoukas & Cummings, 1997, p. 670; Söderlund, 2004, p. 190). This interrogation leads to consider problems such as the relations between dichotomies Theory and Practice, rigor and relevance of research, ways of knowing and knowledge forms. On the one hand we face the “Enlightenment” assumptions underlying modern positivist Social science, grounded in “unity-of-science dream of transforming and reducing all kinds of knowledge to one basic form and level” and cause-effects relationships (Eikeland, 2012, p. 20), and on the other, the postmodern interpretivist proposal, and its “tendency to make all kinds of knowing equivalent” (Eikeland, 2012, p. 20). In the project management space, this aims at addressing one of the fundamental problems in the field: projects still do not deliver their expected benefits and promises and therefore the socio-economical good (Hodgson & Cicmil, 2007; Bredillet, 2010, Lalonde et al., 2012). The Cartesian tradition supporting projects research and practice for the last 60 years (Bredillet, 2010, p. 4) has led to the lack of relevance to practice of the current conceptual base of project management, despite the sum of research, development of standards, best & good practices and the related development of project management bodies of knowledge (Packendorff, 1995, p. 319-323; Cicmil & Hodgson, 2006, p. 2–6, Hodgson & Cicmil, 2007, p. 436–7; Winter et al., 2006, p. 638). Referring to both Hodgson (2002) and Giddens (1993), we could say that “those who expect a “social-scientific Newton” to revolutionize this young field “are not only waiting for a train that will not arrive, but are in the wrong station altogether” (Hodgson, 2002, p. 809; Giddens, 1993, p. 18). While, in the postmodern stream mainly rooted in the “practice turn” (e.g. Hällgren & Lindahl, 2012), the shift from methodological individualism to social viscosity and the advocated pluralism lead to reinforce the “functional stupidity” (Alvesson & Spicer, 2012, p. 1194) this postmodern stream aims at overcoming. We suggest here that addressing the question “what is a good PM?” requires a philosophy of practice perspective to complement the “usual” philosophy of science perspective. The questioning of the modern Cartesian tradition mirrors a similar one made within Social science (Say, 1964; Koontz, 1961, 1980; Menger, 1985; Warry, 1992; Rothbard, 1997a; Tsoukas & Cummings, 1997; Flyvbjerg, 2001; Boisot & McKelvey, 2010), calling for new thinking. In order to get outside the rationalist ‘box’, Toulmin (1990, p. 11), along with Tsoukas & Cummings (1997, p. 655), suggests a possible path, summarizing the thoughts of many authors: “It can cling to the discredited research program of the purely theoretical (i.e. “modern”) philosophy, which will end up by driving it out of business: it can look for new and less exclusively theoretical ways of working, and develop the methods needed for a more practical (“post-modern”) agenda; or it can return to its pre-17th century traditions, and try to recover the lost (“pre-modern”) topics that were side-tracked by Descartes, but can be usefully taken up for the future” (Toulmin, 1990, p. 11). Thus, paradoxically and interestingly, in their quest for the so-called post-modernism, many authors build on “pre-modern” philosophies such as the Aristotelian one (e.g. MacIntyre, 1985, 2007; Tsoukas & Cummings, 1997; Flyvbjerg, 2001; Blomquist et al., 2010; Lalonde et al., 2012). It is perhaps because the post-modern stream emphasizes a dialogic process restricted to reliance on voice and textual representation, it limits the meaning of communicative praxis, and weaking the practice because it turns away attention from more fundamental issues associated with problem-definition and knowledge-for-use in action (Tedlock, 1983, p. 332–4; Schrag, 1986, p. 30, 46–7; Warry, 1992, p. 157). Eikeland suggests that the Aristotelian “gnoseology allows for reconsidering and reintegrating ways of knowing: traditional, practical, tacit, emotional, experiential, intuitive, etc., marginalised and considered insufficient by modernist [and post-modernist] thinking” (Eikeland, 2012, p. 20—21). By contrast with the modernist one-dimensional thinking and relativist and pluralistic post-modernism, we suggest, in a turn to an Aristotelian pre-modern lens, to re-conceptualise (“re” involving here a “re”-turn to pre-modern thinking) the “do” and to shift the perspective from what a good PM is (philosophy of science lens) to what a good PM does (philosophy of practice lens) (Aristotle, 1926a). As Tsoukas & Cummings put it: “In the Aristotelian tradition to call something good is to make a factual statement. To ask, for example, ’what is a good captain’?’ is not to come up with a list of attributes that good captains share (as modem contingency theorists would have it), but to point out the things that those who are recognized as good captains do.” (Tsoukas & Cummings, 1997, p. 670) Thus, this conversation offers a dialogue and deliberation about a central question: What does a good project manager do? The conversation is organized around a critic of the underlying assumptions supporting the modern, post-modern and pre-modern relations to ways of knowing, forms of knowledge and “practice”.
Resumo:
Road safety barriers are used to redirect traffic at roadside work-zones. When filled with water, these barriers are able to withstand low to moderate impact speeds up to 50kmh-1. Despite this feature, there are challenges when using portable water-filled barriers (PWFBs) such as large lateral displacements as well as tearing and breakage during impact, especially at higher speeds. In this study, the authors explore the use of composite action to enhance the crashworthiness of PWFBs and enable their use at higher speeds. Initially, we investigated the energy absorption capability of water in PWFB. Then, we considered the composite action of a PWFB with the introduction of a steel frame to evaluate its impact on performance. Findings of the study show that the initial height of impact must be lower than the free surface level of water in a PWFB for the water to provide significant crash energy absorption. In general, impact of a road barrier that is 80% filled is a good estimation. Furthermore, the addition of a composite structure greatly reduces the probability of tearing by decreasing the strain and impact energy transferred to the shell container. This allows the water to remain longer in the barrier to absorb energy via inertial displacement and sloshing response. Information from this research will aid in the design of next generation roadside safety structures aimed to increase safety on modern roadways.
Resumo:
Increases in functionality, power and intelligence of modern engineered systems led to complex systems with a large number of interconnected dynamic subsystems. In such machines, faults in one subsystem can cascade and affect the behavior of numerous other subsystems. This complicates the traditional fault monitoring procedures because of the need to train models of the faults that the monitoring system needs to detect and recognize. Unavoidable design defects, quality variations and different usage patterns make it infeasible to foresee all possible faults, resulting in limited diagnostic coverage that can only deal with previously anticipated and modeled failures. This leads to missed detections and costly blind swapping of acceptable components because of one’s inability to accurately isolate the source of previously unseen anomalies. To circumvent these difficulties, a new paradigm for diagnostic systems is proposed and discussed in this paper. Its feasibility is demonstrated through application examples in automotive engine diagnostics.
Resumo:
A technique for analysing exhaust emission plumes from unmodified locomotives under real world conditions is described and applied to the task of characterizing plumes from railway trains servicing an Australian shipping port. The method utilizes the simultaneous measurement, downwind of the railway line, of the following pollutants; particle number, PM2.5 mass fraction, SO2, NOx and CO2, with the last of these being used as an indicator of fuel combustion. Emission factors are then derived, in terms of number of particles and mass of pollutant emitted per unit mass of fuel consumed. Particle number size distributions are also presented. The practical advantages of the method are discussed including the capacity to routinely collect emission factor data for passing trains and to thereby build up a comprehensive real world database for a wide range of pollutants. Samples from 56 train movements were collected, analyzed and presented. The quantitative results for emission factors are: EF(N)=(1.7±1)×1016 kg-1, EF(PM2.5)= (1.1±0.5) g·kg-1, EF(NOx)= (28±14) g·kg-1, and EF(SO2 )= (1.4±0.4) g·kg-1. The findings are compared with comparable previously published work. Statistically significant (p<α, α=0.05) correlations within the group of locomotives sampled were found between the emission factors for particle number and both SO2 and NOx.
Resumo:
This research project contributed to the in-depth understanding of the influence of hydrologic and hydraulic factors on the stormwater treatment performance of constructed wetlands and bioretention basins in the "real world". The project was based on the comprehensive monitoring of a Water Sensitive Urban Design treatment train in the field and underpinned by complex multivariate statistical analysis. The project outcomes revealed that the reduction in pollutant concentrations were consistent in the constructed wetland, but was highly variable in the bioretention basin to a range of influential factors. However, due to the significant amount retention within the filter media, all pollutant loadings were reduced in the bioretention basin.
Resumo:
Automated crowd counting has become an active field of computer vision research in recent years. Existing approaches are scene-specific, as they are designed to operate in the single camera viewpoint that was used to train the system. Real world camera networks often span multiple viewpoints within a facility, including many regions of overlap. This paper proposes a novel scene invariant crowd counting algorithm that is designed to operate across multiple cameras. The approach uses camera calibration to normalise features between viewpoints and to compensate for regions of overlap. This compensation is performed by constructing an 'overlap map' which provides a measure of how much an object at one location is visible within other viewpoints. An investigation into the suitability of various feature types and regression models for scene invariant crowd counting is also conducted. The features investigated include object size, shape, edges and keypoints. The regression models evaluated include neural networks, K-nearest neighbours, linear and Gaussian process regresion. Our experiments demonstrate that accurate crowd counting was achieved across seven benchmark datasets, with optimal performance observed when all features were used and when Gaussian process regression was used. The combination of scene invariance and multi camera crowd counting is evaluated by training the system on footage obtained from the QUT camera network and testing it on three cameras from the PETS 2009 database. Highly accurate crowd counting was observed with a mean relative error of less than 10%. Our approach enables a pre-trained system to be deployed on a new environment without any additional training, bringing the field one step closer toward a 'plug and play' system.
Resumo:
This paper assesses Intelligent Transportation Systems (ITS) to identify safety systems that are most likely to reduce driver errors at railway crossings. ITS technologies have been integrated in order to develop improved evaluation tools to reduce crashes at railway crossings. Although emerging technologies, knowledge, innovative interventions have been introduced to change driver behaviour, there is a lack of research on the impact of integrating ITS technologies and transportation simulation on drivers. The outcomes of ITS technologies for complementing traditional signage were compared with those of current safety systems (passive and active) at railway crossings. Three ITS technologies are compared with current treatments, in terms of compliance rate and vehicle speed profiles. It is found that ITS technologies improve compliance rate by 17~30% and also encourage drivers to slow down earlier compared to current passive and active crossings when there is a train approaching the railway crossings.
Resumo:
This study investigates travel behaviour and wait-time activities as a component of passenger satisfaction with public transport in Brisbane, Australia. Australian transport planners recognise a variety of benefits to encouraging a mode shift away from automobile travel in favour of active and public transport use. Efforts to increase public transport ridership have included introducing state of the art passenger information systems, improving physical station access, and integrating system pricing, routes and scheduling for train, bus and ferry. Previous research regarding satisfaction with public transport emphasizes technical dimensions of service quality, including the timing and reliability of service. Those factors might be especially significant for frequent (commuting) travellers who look to balance the cost and efficiency of their travel options. In contrast, infrequent (leisure) passengers may be more concerned with way finding and the sensory experience of the journey. Perhaps due to the small relative proportion of trips made by river ferry compared to bus and rail, this mode of public transport has not received as much attention in travel-behaviour research. This case study of Brisbane’s river ferry system examines ferry passengers at selected terminals during peak and off-peak travel times to find out how travel behaviours and activities correlate to satisfaction with ferry travel. Data include 416 questionnaires completed by passengers intercepted during wait times at seven CityCat terminals in Brisbane. Descriptive statistical analysis revealed associations between specific wait time activities and satisfaction levels that could inform planners seeking to increase ridership and quality of life through ferry-oriented development.