169 resultados para Project 2002-053-C : Wayfinding in the built environment
Resumo:
This paper presents a series of ongoing experiments to facilitate serendipity in the design studio through a diversity of delivery modes. These experiments are conducted in a second year architectural design studio, and include physical, dramatic and musical performance. The act of designing is always exploratory, always seeking an unknown resolution, and the ability to see and capture the value in the unexpected is a critical aspect of such creative design practice. Engaging with the unexpected is however a difficult ability to develop in students. Just how can a student be schooled in such abilities when the challenge and the context are unforeseeable? How can students be offered meaningful feedback about an issue that cannot be predicted, when feedback comes in the form of extrinsic assessment from a tutor? This project establishes a number of student activities that seek to provide intrinsic feedback from the activity itself. Further to this, the project seeks to heighten student engagement with the project through physical expression and performance: utilising more of the students’ senses than just vision and hearing. Diana Laurillard’s theories of conversational frameworks (2002) are used to interrogate the act of dramatic performance as an act of learning, with particular reference to the serendipitous activities of design. Such interrogation highlights the feedback mechanisms that facilitate intrinsic feedback and fast, if not instantaneous, cycles of learning. The physical act of performance itself provides a learning experience that is not replicable in other modes of delivery. Student feedback data and independent assessment of project outcomes are used to assess the success of this studio model.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is a lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC.
Resumo:
The Cancer Genome Project intends to search every human gene for cancer-related mutations. Its first success is the discovery of such mutations in the BRAF gene.
Resumo:
Levels of waste within the construction industry need to be reduced for environmental and economic reasons. Changing people's wasteful behaviour can make a significant contribution. This paper describes a research project that used Ajzen's 'theory of planned behaviour' to investigate the attitudinal forces that shape behaviour at the operative level. It concludes that operatives see waste as an inevitable by-product of construction activity. Attitudes towards waste management are not negative, although they are pragmatic and impeded by perceptions of a lack of managerial commitment. Waste management is perceived as a low project priority, and there is an absence of appropriate resources and incentives to support it. A theory of waste behaviour is proposed for the construction industry, and recommendations are made to help managers improve operatives' attitudes towards waste.
Resumo:
Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO
Resumo:
Project selection is a complex decision-making process as it involves multiple objectives, constraints and stakeholders. Understanding the organisation, in particular organisational culture, is an essential stage in improving decision-making process. The influences of organisational culture on decision-making can be seen in the way people work as a team, act and cooperate in their teamwork to achieve the set goals, and also in how people think, prioritize and decide. This paper aims to give evidence of the impact of organisational culture on the decision-making process in project selection, in the Indonesian context. Data was collected from a questionnaire survey developed based on the existing models of organisational culture (Denison 1990, Hofstede 2001, and Glaser et al 1987). Four main cultural traits (involvement, consistency, mission and power-distance) were selected and employed to examine the influence of organisational culture on the effectiveness of decision-making in the current Indonesian project selection processes. The results reveal that there are differences in organisational cultures for two organisations in three provinces. It also suggests that organisational culture (particularly the traits of ‘involvement’, ‘consistency’ and ‘mission’) contribute to the effectiveness of decision-making in the selected cases.
Resumo:
Under pressure from both the ever increasing level of market competition and the global financial crisis, clients in consumer electronics (CE) industry are keen to understand how to choose the most appropriate procurement method and hence to improve their competitiveness. Four rounds of Delphi questionnaire survey were conducted with 12 experts in order to identify the most appropriate procurement method in the Hong Kong CE industry. Five key selection criteria in the CE industry are highlighted, including product quality, capability, price competition, flexibility and speed. This study also revealed that product quality was found to be the most important criteria for the “First type used commercially” and “Major functional improvements” projects. As for “Minor functional improvements” projects, price competition was the most crucial factor to be considered during the PP selection. These research findings provide owners with useful insights to select the procurement strategies.
Resumo:
The purpose of this article is to investigate the relationship between organizational and professional commitment of project workers. We first present (1) role-conflict theory and exchange theory to establish the multiple dimensions of commitment (affective, continuance, and normative) and (2) social identity theory to support our argument for different foci of commitment—organization and profession. Building on these theoretical lenses, we present the literature review that compares organizational and professional commitment of project workers with respect to the three dimensions of commitment. Adopting a positivist approach and a sample of 141 project workers, we use Pearson’s correlation to identify the relationship between affective organizational and affective professional, continuance organizational and continuance professional, and normative organizational and normative professional commitment. We report significant correlation between affective organizational commitment and affective professional commitment of project workers. The correlations between continuance organizational commitment and continuance professional commitment and normative organizational commitment and normative professional commitment are moderate. We then discuss the implications of these findings for the project management profession.
Resumo:
This report provides an overview of findings of qualitative research comprising three case studies undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. These case studies (see Parts 2, 3 and 4 of this suite of reports) were undertaken to illustrate the nature of past R&D investments in Australia. This was done to complement: (i) the audit and analysis of past R&D investment undertaken by Thomas Barlow (2011); and (ii) the Construction 2030 roadmap being developed by Swinburne University of Technology and Professor Göran Roos from VTT Technical Research Centre of Finland. These documents will be the basis for the final phase of the present project - developing policy guidelines for future R&D investment in the Australian built environment. Refer also Parts 1, 2 and 3 for detail findings.
Resumo:
This report discusses findings of a case study into "CADD, BIM and IPD" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. This case study investigated the evolution that has taken place in the Queensland Department of Public Works Division of Project Services during the last 20 years from: the initial implementation of computer aided design and documentation(CADD); to the experimentation with building information modelling (BIM) from the mid 2000’s; embedding integrated practice (IP); to current steps towards integrated project delivery (IPD) with the integration of contractors in the design/delivery process. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
This report discusses findings of a case study into "Road Construction Safety" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Queensland Department of Transport and Main Roads (QTMR) has taken a leadership role in developing a safer working environment for road construction workers. In the past decades, a range of initiatives have been introduced to contribute to improved performance in this area. Several initiatives have been undertaken by QTMR as part of their overarching commitment to safety. Three such initiatives form the basis for this case study investigation, in order to better illustrate the nature of R&D investment and its impact on day-to-day operations and the supply chain. These are the development and implementation of: (i) the Mechanical Traffic Aid: (ii) the Thermal Imaging Camera; and (iii) the Trailer-based CCTV (camera). This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
This report discusses findings of a case study into "Green Buildings" undertaken as a part of the retrospective analysis component of Sustainable Built Environment National Research Centre (SBEnrc) Project 2.7 Leveraging R&D investment for the Australian Built Environment. The Western Australian Government (WAG) has taken a leadership role for a number of decades in developing more environmentally responsive buildings. In the past decade, considerable initiatives have been introduced to contribute to: (i) greening the stock of government buildings; and (ii) providing leadership in the development of other non-residential buildings developed commercially. This role has been informed by global, national and internal initiatives and research in this area. This case study investigates: (i) the nature of this leadership; and (ii) the role of R&D policy development; and (iii) the dissemination and impact of outcomes in the broader industry. This case study should be read in conjunction with Part 1 of this suite of reports.
Resumo:
The construction industry demands priority from all governments because it impacts economically and socially on all citizens. A number of recent studies have identified inefficiencies in the Australian construction industry by modelling the building process. A culture of reform supported by industry and government is now emerging in the industry – one in which alternate forms of project delivery are being trialed. The Australian Building and Construction Industry Action Agenda brought together industry and government to identify actions necessary to lift Australia’s innovative and knowledge creating capacity at the sector level. A central activity under this Action Agenda was dissemination of information relating to industry best practice initiatives in innovation, project delivery and the use of information technology. Government and industry identified project alliance contracting and more advanced information technology as means to increase efficiency in construction as part of a new innovative procurement environment.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.