185 resultados para Job-satisfaction
Resumo:
Many large coal mining operations in Australia rely heavily on the rail network to transport coal from mines to coal terminals at ports for shipment. Over the last few years, due to the fast growing demand, the coal rail network is becoming one of the worst industrial bottlenecks in Australia. As a result, this provides great incentives for pursuing better optimisation and control strategies for the operation of the whole rail transportation system under network and terminal capacity constraints. This PhD research aims to achieve a significant efficiency improvement in a coal rail network on the basis of the development of standard modelling approaches and generic solution techniques. Generally, the train scheduling problem can be modelled as a Blocking Parallel- Machine Job-Shop Scheduling (BPMJSS) problem. In a BPMJSS model for train scheduling, trains and sections respectively are synonymous with jobs and machines and an operation is regarded as the movement/traversal of a train across a section. To begin, an improved shifting bottleneck procedure algorithm combined with metaheuristics has been developed to efficiently solve the Parallel-Machine Job- Shop Scheduling (PMJSS) problems without the blocking conditions. Due to the lack of buffer space, the real-life train scheduling should consider blocking or hold-while-wait constraints, which means that a track section cannot release and must hold a train until the next section on the routing becomes available. As a consequence, the problem has been considered as BPMJSS with the blocking conditions. To develop efficient solution techniques for BPMJSS, extensive studies on the nonclassical scheduling problems regarding the various buffer conditions (i.e. blocking, no-wait, limited-buffer, unlimited-buffer and combined-buffer) have been done. In this procedure, an alternative graph as an extension of the classical disjunctive graph is developed and specially designed for the non-classical scheduling problems such as the blocking flow-shop scheduling (BFSS), no-wait flow-shop scheduling (NWFSS), and blocking job-shop scheduling (BJSS) problems. By exploring the blocking characteristics based on the alternative graph, a new algorithm called the topological-sequence algorithm is developed for solving the non-classical scheduling problems. To indicate the preeminence of the proposed algorithm, we compare it with two known algorithms (i.e. Recursive Procedure and Directed Graph) in the literature. Moreover, we define a new type of non-classical scheduling problem, called combined-buffer flow-shop scheduling (CBFSS), which covers four extreme cases: the classical FSS (FSS) with infinite buffer, the blocking FSS (BFSS) with no buffer, the no-wait FSS (NWFSS) and the limited-buffer FSS (LBFSS). After exploring the structural properties of CBFSS, we propose an innovative constructive algorithm named the LK algorithm to construct the feasible CBFSS schedule. Detailed numerical illustrations for the various cases are presented and analysed. By adjusting only the attributes in the data input, the proposed LK algorithm is generic and enables the construction of the feasible schedules for many types of non-classical scheduling problems with different buffer constraints. Inspired by the shifting bottleneck procedure algorithm for PMJSS and characteristic analysis based on the alternative graph for non-classical scheduling problems, a new constructive algorithm called the Feasibility Satisfaction Procedure (FSP) is proposed to obtain the feasible BPMJSS solution. A real-world train scheduling case is used for illustrating and comparing the PMJSS and BPMJSS models. Some real-life applications including considering the train length, upgrading the track sections, accelerating a tardy train and changing the bottleneck sections are discussed. Furthermore, the BPMJSS model is generalised to be a No-Wait Blocking Parallel- Machine Job-Shop Scheduling (NWBPMJSS) problem for scheduling the trains with priorities, in which prioritised trains such as express passenger trains are considered simultaneously with non-prioritised trains such as freight trains. In this case, no-wait conditions, which are more restrictive constraints than blocking constraints, arise when considering the prioritised trains that should traverse continuously without any interruption or any unplanned pauses because of the high cost of waiting during travel. In comparison, non-prioritised trains are allowed to enter the next section immediately if possible or to remain in a section until the next section on the routing becomes available. Based on the FSP algorithm, a more generic algorithm called the SE algorithm is developed to solve a class of train scheduling problems in terms of different conditions in train scheduling environments. To construct the feasible train schedule, the proposed SE algorithm consists of many individual modules including the feasibility-satisfaction procedure, time-determination procedure, tune-up procedure and conflict-resolve procedure algorithms. To find a good train schedule, a two-stage hybrid heuristic algorithm called the SE-BIH algorithm is developed by combining the constructive heuristic (i.e. the SE algorithm) and the local-search heuristic (i.e. the Best-Insertion- Heuristic algorithm). To optimise the train schedule, a three-stage algorithm called the SE-BIH-TS algorithm is developed by combining the tabu search (TS) metaheuristic with the SE-BIH algorithm. Finally, a case study is performed for a complex real-world coal rail network under network and terminal capacity constraints. The computational results validate that the proposed methodology would be very promising because it can be applied as a fundamental tool for modelling and solving many real-world scheduling problems.
Resumo:
Introduction: The purpose of this study was to assess the capacity of a written intervention, in this case a patient information brochure, to improve patient satisfaction during an Emergency Department (ED) visit. For the purpose of measuring the effect of the intervention the ED journey was conceptualised as a series of distinct areas of service comprising waiting time, service by the triage nurse, care from doctors and nurses and information giving Background of study: Research into patient satisfaction has become a widespread activity endorsed by both governments and hospital administrations. The literature on ED patient satisfaction has consistently indicated three primary areas of patient dissatisfaction: waiting time, nursing care and communication. Recent developments in the literature on patient satisfaction studies however have highlighted the relationship between patients. expectations of a service encounter and their consequent assessment of the experience as dissatisfying or satisfying. Disconfirmation theory posits that the degree to which expectations are confirmed will affect subsequent levels of satisfaction. The conceptual framework utilised in this study is Coye.s (2004) model of disconfirmation. Coye while reiterating satisfaction is a consequence of the degree expectations are either confirmed or disconfirmed also posits that expectations can be modified by interventions. Coye.s work conceptualises these interventions as intra encounter experiences (cues) which function to adjust expectations. Coye suggests some cues are unintended and may have a negative impact which also reinforces the value of planned cues intended to meet or exceed consumer expectations. Consequently the brochure can be characterized as a potentially positive cue, encouraging the patient to understand processes and to orient them in what can be a confronting environment. Only a limited number of studies have examined the effect of written interventions within an ED. No studies could be located which have tested the effect of ED interventions using a conceptual framework which relates the effect of the degree to which expectations are confirmed or disconfirmed in terms of satisfaction with services. Method: Two studies were conducted. Study One used qualitative methods to explore patients. expectations of the ED from the perspective of both patients and health care professionals. Study One was used in part to direct the development of the intervention (brochure) in Study Two. The brochure was an intervention designed to modify patients. expectations thus increasing their satisfaction with the provision of ED service. As there was no existing tools to measure ED patients. expectations and satisfaction a new tool was also developed based on the findings and the literature of Study One. Study Two used a non-randomised, quasi-experimental approach using a non-equivalent post-test only comparison group design used to investigate the effect of the patient education brochure (Stommel and Wills, 2004). The brochure was disseminated to one of two study groups (the intervention group). The effect of the brochure was assessed by comparing the data obtained from both the intervention and control group. These two groups consisted of 150 participants each. It was expected that any differences in the relevant domains selected for examination would indicate the effect of the brochure both on expectation and potentially satisfaction. Results: Study One revealed several areas of common ground between patients and nurses in terms of relevant content for the written intervention, including the need for information on the triage system and waiting times. Areas of difference were also found with patients emphasizing communication issues, whereas focus group members expressed concern that patients were often unable to assimilate verbal information. The findings suggested the potential utility of written material to reinforce verbal communication particularly in terms of the triage process and other ED protocols. This material was synthesized within the final version of the written intervention. Overall the results of Study Two indicated no significant differences between the two groups. The intervention group did indicate a significant number of participants who viewed the brochure of having changed their expectations. The effect of the brochure may have been obscured by a lack of parity between the two groups as the control group presented with statistically significantly higher levels of acuity and experienced significantly shorter waiting times. In terms of disconfirmation theory this would suggest expectations that had been met or exceeded. The results confirmed the correlation of expectations with satisfaction. Several domains also indicated age as a significant predictor with older patients tending to score higher satisfaction results. Other significant predictors of satisfaction established were waiting time and care from nurses, reinforcing the combination of efficient service and positive interpersonal experiences as being valued by patients. Conclusions: Information presented in written form appears to benefit a significant number of ED users in terms of orientation and explaining systems and procedures. The degree to which these effects may interact with other dimensions of satisfaction however is likely to be limited. Waiting time and interpersonal behaviours from staff also provide influential cues in determining satisfaction. Written material is likely to be one element in a series of coordinated strategies to improve patient satisfaction during periods of peak demand.
Resumo:
With the recent regulatory reforms in a number of countries, railways resources are no longer managed by a single party but are distributed among different stakeholders. To facilitate the operation of train services, a train service provider (SP) has to negotiate with the infrastructure provider (IP) for a train schedule and the associated track access charge. This paper models the SP and IP as software agents and the negotiation as a prioritized fuzzy constraint satisfaction (PFCS) problem. Computer simulations have been conducted to demonstrate the effects on the train schedule when the SP has different optimization criteria. The results show that by assigning different priorities on the fuzzy constraints, agents can represent SPs with different operational objectives.
Resumo:
In general, the performance of construction projects, including their sustainability performance, does not meet optimal expectations. One aspect of this is the performance of the participants who are independent and make a significance impact on overall project outcomes. Of these participants, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely, time, cost and quality. As the level of satisfaction is a subjective issue, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in an attempt to determine the performance of construction project outcomes - for instance, client satisfaction, customer satisfaction, contractor satisfaction, occupant satisfaction and home buyer satisfaction. These not only identify the performance of the construction project but are also used to improve and maintain relationships. In addition, these assessments are necessary for the continuous improvement and enhanced cooperation of participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparative standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may possibly be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This chapter examines the methods commonly practised in measuring satisfaction levels today and the advantages of promoting these methods. The results provide a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods to use in identifying the performance of project outcomes.
Resumo:
Bronfenbrenner.s Bioecological Model, expressed as the developmental equation, D f PPCT, is the theoretical framework for two studies that bring together diverse strands of psychology to study the work-life interface of working adults. Occupational and organizational psychology is focused on the demands and resources of work and family, without emphasising the individual in detail. Health and personality psychology examine the individual but without emphasis on the individual.s work and family roles. The current research used Bronfenbrenner.s theoretical framework to combine individual differences, work and family to understand how these factors influence the working adult.s psychological functioning. Competent development has been defined as high well-being (measured as life satisfaction and psychological well-being) and high work engagement (as work vigour, work dedication and absorption in work) and as the absence of mental illness (as depression, anxiety and stress) and the absence of burnout (as emotional exhaustion, cynicism and professional efficacy). Study 1 and 2 were linked, with Study 1 as a cross-sectional survey and Study 2, a prospective panel study that followed on from the data used in Study1. Participants were recruited from a university and from a large public hospital to take part in a 3-wave, online study where they completed identical surveys at 3-4 month intervals (N = 470 at Time 1 and N = 198 at Time 3). In Study 1, hierarchical multiple regressions were used to assess the effects of individual differences (Block 1, e.g. dispositional optimism, coping self-efficacy, perceived control of time, humour), work and family variables (Block 2, e.g. affective commitment, skill discretion, work hours, children, marital status, family demands) and the work-life interface (Block 3, e.g. direction and quality of spillover between roles, work-life balance) on the outcomes. There were a mosaic of predictors of the outcomes with a group of seven that were the most frequent significant predictors and which represented the individual (dispositional optimism and coping self-efficacy), the workplace (skill discretion, affective commitment and job autonomy) and the work-life interface (negative work-to-family spillover and negative family-to-work spillover). Interestingly, gender and working hours were not important predictors. The effects of job social support, generally and for work-life issues, perceived control of time and egalitarian gender roles on the outcomes were mediated by negative work-to-family spillover, particularly for emotional exhaustion. Further, the effect of negative spillover on depression, anxiety and work engagement was moderated by the individual.s personal and workplace resources. Study 2 modelled the longitudinal relationships between the group of the seven most frequent predictors and the outcomes. Using a set of non-nested models, the relative influences of concurrent functioning, stability and change over time were assessed. The modelling began with models at Time 1, which formed the basis for confirmatory factor analysis (CFA) to establish the underlying relationships between the variables and calculate the composite variables for the longitudinal models. The CFAs were well fitting with few modifications to ensure good fit. However, using burnout and work engagement together required additional analyses to resolve poor fit, with one factor (representing a continuum from burnout to work engagement) being the only acceptable solution. Five different longitudinal models were investigated as the Well-Being, Mental Distress, Well-Being-Mental Health, Work Engagement and Integrated models using differing combinations of the outcomes. The best fitting model for each was a reciprocal model that was trimmed of trivial paths. The strongest paths were the synchronous correlations and the paths within variables over time. The reciprocal paths were more variable with weak to mild effects. There was evidence of gain and loss spirals between the variables over time, with a slight net gain in resources that may provide the mechanism for the accumulation of psychological advantage over a lifetime. The longitudinal models also showed that there are leverage points at which personal, psychological and managerial interventions can be targeted to bolster the individual and provide supportive workplace conditions that also minimise negative spillover. Bronfenbrenner.s developmental equation has been a useful framework for the current research, showing the importance of the person as central to the individual.s experience of the work-life interface. By taking control of their own life, the individual can craft a life path that is most suited to their own needs. Competent developmental outcomes were most likely where the person was optimistic and had high self-efficacy, worked in a job that they were attached to and which allowed them to use their talents and without too much negative spillover between their work and family domains. In this way, individuals had greater well-being, better mental health and greater work engagement at any one time and across time.
Resumo:
The Australian tourism tertiary education sector operates in a competitive and dynamic environment, which necessitates a market orientation to be successful. Academic staff and management in the sector must regularly assess the perceptions of prospective and current students and monitor the satisfaction levels of current students. This study is concerned with the setting and monitoring of satisfaction levels of current students, reporting the results of three longitudinal investigations of student satisfaction in a postgraduate unit. The study also addresses a limitation of a university’s generic teaching evaluation instrument. Importance-Performance Analysis (IPA) has been recommended as a simple but effective tool for overcoming the deficiencies of many student evaluation studies, which have generally measured only attribute performance at the end of a semester. IPA was used to compare student expectations of the unit at the beginning of a semester with their perceptions of performance 10 weeks later. The first stage documented key benchmarks for which amendments to the unit based on student feedback could be evaluated during subsequent teaching periods.
Resumo:
It is recognized that, in general, the performance of construction projects does not meet optimal expectations. One aspect of this is the performance of each participant, which is interdependent and makes a significance impact on overall project outcomes. Of these, the client is traditionally the owner of the project, the architect or engineer is engaged as the lead designer and a contractor is selected to construct the facilities. Generally, the performance of the participants is gauged by considering three main factors, namely time, cost and quality. As the level of satisfaction is a subjective measurement, it is rarely used in the performance evaluation of construction work. Recently, various approaches to the measurement of satisfaction have been made in attempting to determine the performance of construction project outcomes – for instance client satisfaction, consultant satisfaction, contractor satisfaction, customer satisfaction and home buyer satisfaction. These not only identify the performance of the construction project, but are also used to improve and maintain relationships. In addition, these assessments are necessary for continuous improvement and enhanced cooperation between participants. The measurement of satisfaction levels primarily involves expectations and perceptions. An expectation can be regarded as a comparison standard of different needs, motives and beliefs, while a perception is a subjective interpretation that is influenced by moods, experiences and values. This suggests that the disparity between perceptions and expectations may be used to represent different levels of satisfaction. However, this concept is rather new and in need of further investigation. This paper examines the current methods commonly practiced in measuring satisfaction level and the advantages of promoting these methods. The results provided are a preliminary review of the advantages of satisfaction measurement in the construction industry and recommendations are made concerning the most appropriate methods for use in identifying the performance of project outcomes.
Resumo:
The outcomes of the construction projects can be evaluated in numerous ways. One method is to measure the satisfaction of participants as represented by the differences between their expectations and perceptions. This measurement is used widely in construction as it promises benefits, such as the improvement of product delivery, and enhances services quality by identifying some necessary changes. Commonly satisfaction measurement is gauged by evaluating the level of client satisfaction of construction performance. The measurement of customer satisfaction on the other hand, is based on the quality of the end product. This evaluation is used to encourage contractors to improve their performance to a required level and to ensure that the projects are delivered as expected- in terms of time, budget and quality. Several studies of performance measurement have indicated that contractor performance is still not satisfactory, as the outcome delivered is not as required (because of cost overruns, time overruns or because it is generally unsatisfactory). This drawback may be due to the contractors’ lack of expertise, motivation and/or satisfaction. The measurement of performance based on contractor satisfaction levels is still new and very few studies have yet taken place in the construction industry. This paper examines how the characteristics of a contracting organisation – namely its experience in the industry, background, past performance, size of organisation and financial stability- may influence its satisfaction levels with regards to project performance. Previous literature reviews and interviews are used as research tools in the preliminary investigation. The outcome is expected to present a basic understanding of contractor satisfaction measurement and its potential for improving the performance of project outcomes.
Resumo:
The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. ----- ----- This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. ----- ----- The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors’ needs, mutual objectives and open communication to help to deliver a successful project.
Resumo:
As governments around the world adopt a marketing orientation, the importance of consumer satisfaction to the effectiveness of the organization is being recognized. While some investigation of satisfaction with a government agencies' service has occurred, there is little examination of satisfaction with a government agency that acts as a third-party on the behalf of consumers to gain marketplace redress. Given the number of third-party complaints is increasing as a result of internet access to complaint channels, this research is a timely investigation. This study reports the findings of a survey of 454 complainants to an Australian Government agency: the Office of Fair Trading (OFT). The findings show that satisfaction with the service was subjectively experienced, based around individual expectations of the redress and satisfaction levels were higher when the redress sought was financial compared with non-financial forms of redress such as apology.
Resumo:
In an environment where economic, political and technological change is the rule, a fundamental business strategy should be the defence of traditional markets and thoughtful entry into new markets, with an aim to increase market penetration and stimulate profit. The success of such a strategy will depend on the success of firms to do more and better for customers than their competitors. In other words, the firm’s primary competitive advantage will come from changes they implement to please their customers. In the construction industry, complexity of technical knowledge and construction processes have traditionally encouraged clients to play a largely passive role in the management of their project. However, today’s clients not only want to know about internal efficiency of their projects but also need to know how they and their contractors compare and compete against their competitors. Given the vulnerability of construction activities in the face of regional financial crisis, constructors need to be proactive in the search to improve their internal firm and project processes to ensure profitability and market responsiveness. In this context, reengineering is a radical design that emphasises customer satisfaction rather than cost reduction This paper discusses the crucial role of the client-project interface and how project networks could facilitate and improve information dissemination and sharing, collaborative efforts, decision-making and improved project climate. An intra-project network model is presented, and project managers’ roles and competencies in forming and coordinating project workgroups is discussed.