431 resultados para Construction Management, Employees, Job Performance


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, practitioners and researchers alike have turned their attention to knowledge management (KM) in order to increase organisational performance (OP). As a result, many different approaches and strategies have been investigated and suggested for how knowledge should be managed to make organisations more effective and efficient. However, most research has been undertaken in the for-profit sector, with only a few studies focusing on the benefits nonprofit organisations might gain by managing knowledge. This study broadly investigates the impact of knowledge management on the organisational performance of nonprofit organisations. Organisational performance can be evaluated through either financial or non-financial measurements. In order to evaluate knowledge management and organisational performance, non-financial measurements are argued to be more suitable given that knowledge is an intangible asset which often cannot be expressed through financial indicators. Non-financial measurement concepts of performance such as the balanced scorecard or the concept of Intellectual Capital (IC) are well accepted and used within the for-profit and nonprofit sectors to evaluate organisational performance. This study utilised the concept of IC as the method to evaluate KM and OP in the context of nonprofit organisations due to the close link between KM and IC: Indeed, KM is concerned with managing the KM processes of creating, storing, sharing and applying knowledge and the organisational KM infrastructure such as organisational culture or organisational structure to support these processes. On the other hand, IC measures the knowledge stocks in different ontological levels: at the individual level (human capital), at the group level (relational capital) and at the organisational level (structural capital). In other words, IC measures the value of the knowledge which has been managed through KM. As KM encompasses the different KM processes and the KM infrastructure facilitating these processes, previous research has investigated the relationship between KM infrastructure and KM processes. Organisational culture, organisational structure and the level of IT support have been identified as the main factors of the KM infrastructure influencing the KM processes of creating, storing, sharing and applying knowledge. Other research has focused on the link between KM and OP or organisational effectiveness. Based on existing literature, a theoretical model was developed to enable the investigation of the relation between KM (encompassing KM infrastructure and KM processes) and IC. The model assumes an association between KM infrastructure and KM processes, as well as an association between KM processes and the various levels of IC (human capital, structural capital and relational capital). As a result, five research questions (RQ) with respect to the various factors of the KM infrastructure as well as with respect to the relationship between KM infrastructure and IC were raised and included into the research model: RQ 1 Do nonprofit organisations which have a Hierarchy culture have a stronger IT support than nonprofit organisations which have an Adhocracy culture? RQ 2 Do nonprofit organisations which have a centralised organisational structure have a stronger IT support than nonprofit organisations which have decentralised organisational structure? RQ 3 Do nonprofit organisations which have a stronger IT support have a higher value of Human Capital than nonprofit organisations which have a less strong IT support? RQ 4 Do nonprofit organisations which have a stronger IT support have a higher value of Structural Capital than nonprofit organisations which have a less strong IT support? RQ 5 Do nonprofit organisations which have a stronger IT support have a higher value of Relational Capital than nonprofit organisations which have a less strong IT support? In order to investigate the research questions, measurements for IC were developed which were linked to the main KM processes. The final KM/IC model contained four items for evaluating human capital, five items for evaluating structural capital and four items for evaluating relational capital. The research questions were investigated through empirical research using a case study approach with the focus on two nonprofit organisations providing trade promotions services through local offices worldwide. Data for the investigation of the assumptions were collected via qualitative as well as quantitative research methods. The qualitative study included interviews with representatives of the two participating organisations as well as in-depth document research. The purpose of the qualitative study was to investigate the factors of the KM infrastructure (organisational culture, organisational structure, IT support) of the organisations and how these factors were related to each other. On the other hand, the quantitative study was carried out through an online-survey amongst staff of the various local offices. The purpose of the quantitative study was to investigate which impact the level of IT support, as the main instrument of the KM infrastructure, had on IC. Overall several key themes were found as a result of the study: • Knowledge Management and Intellectual Capital were complementary with each other, which should be expressed through measurements of IC based on KM processes. • The various factors of the KM infrastructure (organisational culture, organisational structure and level of IT support) are interdependent. • IT was a primary instrument through which the different KM processes (creating, storing, sharing and applying knowledge) were performed. • A high level of IT support was evident when participants reported higher level of IC (human capital, structural capital and relational capital). The study supported previous research in the field of KM and replicated the findings from other case studies in this area. The study also contributed to theory by placing the KM research within the nonprofit context and analysing the linkage between KM and IC. From the managerial perspective, the findings gave clear indications that would allow interested parties, such as nonprofit managers or consultants to understand more about the implications of KM on OP and to use this knowledge for implementing efficient and effective KM strategies within their organisations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose –The introduction of Building Information Model tools over the last 20 years is resulting in radical changes in the Architectural, Engineering and Construction industry. One of these changes concerns the use of Virtual Prototyping - an advanced technology integrating BIM with realistic graphical simulations. Construction Virtual Prototyping (CVP) has now been developed and implemented on ten real construction projects in Hong Kong in the past three years. This paper reports on a survey aimed at establishing the effects of adopting this new technology and obtaining recommendations for future development. Design/methodology/approach – A questionnaire survey was conducted in 2007 of 28 key participants involved in four major Hong Kong construction projects – these projects being chosen because the CVP approach was used in more than one stage in each project. In addition, several interviews were conducted with the project manager, planning manager and project engineer of an individual project. Findings –All the respondents and interviewees gave a positive response to the CVP approach, with the most useful software functions considered to be those relating to visualisation and communication. The CVP approach was thought to improve the collaboration efficiency of the main contractor and sub-contractors by approximately 30 percent, and with a concomitant 30 to 50 percent reduction in meeting time. The most important benefits of CPV in the construction planning stage are the improved accuracy of process planning and shorter planning times, while improved fieldwork instruction and reducing rework occur in the construction implementation stage. Although project teams are hesitant to attribute the use of CVP directly to any specific time savings, it was also acknowledged that the workload of project planners is decreased. Suggestions for further development of the approach include incorporation of automatic scheduling and advanced assembly study. Originality/value –Whilst the research, development and implementation of CVP is relatively new in the construction industry, it is clear from the applications and feedback to date that the approach provides considerable added value to the organisation and management of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however, offers an improved method through the visualization of construction activities by computer simulation — enabling a range of ‘what-if’ questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models, resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nonlinearity, uncertainty and subjectivity are the three predominant characteristics of contractors prequalification which cause the process more of an art than a scientific evaluation. A fuzzy neural network (FNN) model, amalgamating both the fuzzy set and neural network theories, has been developed aiming to improve the objectiveness of contractor prequalification. Through the FNN theory, the fuzzy rules as used by the prequalifiers can be identified and the corresponding membership functions can be transformed. Eighty-five cases with detailed decision criteria and rules for prequalifying Hong Kong civil engineering contractors were collected. These cases were used for training (calibrating) and testing the FNN model. The performance of the FNN model was compared with the original results produced by the prequalifiers and those generated by the general feedforward neural network (GFNN, i.e. a crisp neural network) approach. Contractor’s ranking orders, the model efficiency (R2) and the mean absolute percentage error (MAPE) were examined during the testing phase. These results indicate the applicability of the neural network approach for contractor prequalification and the benefits of the FNN model over the GFNN model. The FNN is a practical approach for modelling contractor prequalification.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The selection criteria for contractor pre-qualification are characterized by the co-existence of both quantitative and qualitative data. The qualitative data is non-linear, uncertain and imprecise. An ideal decision support system for contractor pre-qualification should have the ability of handling both quantitative and qualitative data, and of mapping the complicated nonlinear relationship of the selection criteria, such that rational and consistent decisions can be made. In this research paper, an artificial neural network model was developed to assist public clients identifying suitable contractors for tendering. The pre-qualification criteria (variables) were identified for the model. One hundred and twelve real pre-qualification cases were collected from civil engineering projects in Hong Kong, and eighty-eight hypothetical pre-qualification cases were also generated according to the “If-then” rules used by professionals in the pre-qualification process. The results of the analysis totally comply with current practice (public developers in Hong Kong). Each pre-qualification case consisted of input ratings for candidate contractors’ attributes and their corresponding pre-qualification decisions. The training of the neural network model was accomplished by using the developed program, in which a conjugate gradient descent algorithm was incorporated for improving the learning performance of the network. Cross-validation was applied to estimate the generalization errors based on the “re-sampling” of training pairs. The case studies show that the artificial neural network model is suitable for mapping the complicated nonlinear relationship between contractors’ attributes and their corresponding pre-qualification (disqualification) decisions. The artificial neural network model can be concluded as an ideal alternative for performing the contractor pre-qualification task.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Communication is one team process factor that has received considerable research attention in the team literature. This literature provides equivocal evidence regarding the role of communication in team performance and yet, does not provide any evidence for when communication becomes important for team performance. This research program sought to address this evidence gap by a) testing task complexity and team member diversity (race diversity, gender diversity and work value diversity) as moderators of the team communication — performance relationship; and b) testing a team communication — performance model using established teams across two different task types. The functional perspective was used as the theoretical framework for operationalizing team communication activity. The research program utilised a quasi-experimental research design with participants from a large multi-national information technology company whose Head Office was based in Sydney, Australia. Participants voluntarily completed two team building exercises (a decision making and production task), and completed two online questionnaires. In total, data were collected from 1039 individuals who constituted 203 work teams. Analysis of the data revealed a small number of significant moderation effects, not all in the expected direction. However, an interesting and unexpected finding also emerged from Study One. Large and significant correlations between communication activity ratings were found across tasks, but not within tasks. This finding suggested that teams were displaying very similar profiles of communication on each task, despite the tasks having different communication requirements. Given this finding, Study Two sought to a) determine the relative importance of task versus team effects in explaining variance in team communication measures for established teams; b) determine if established teams had reliable and discernable team communication profiles and if so, c) investigate whether team communication profiles related to task performance. Multi-level modeling and repeated measures analysis of variance (ANOVA) revealed that task type did not have an effect on team communication ratings. However, teams accounted for 24% of the total variance in communication measures. Through cluster analysis, five reliable and distinct team communication profiles were identified. Consistent with the findings of the multi-level analysis and repeated measures ANOVA, teams’ profiles were virtually identical across the decision making and production tasks. A relationship between communication profile and performance was identified for the production task, although not for the decision making task. This research responds to calls in the literature for a better understanding of when communication becomes important for team performance. The moderators tested in this research were not found to have a substantive or reliable effect on the relationship between communication and performance. However, the consistency in team communication activity suggests that established teams can be characterized by their communication profiles and further, that these communication profiles may have implications for team performance. The findings of this research provide theoretical support for the functional perspective in terms of the communication – performance relationship and further support the team development literature as an explanation for the stability in team communication profiles. This research can also assist organizations to better understand the specific types of communication activity and profiles of communication that could offer teams a performance advantage.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Throughout the developed world demographic trends and their forecast consequences are attracting the attention of governments, academics, think tanks and the popular press alike. Population aging, in particular, is the focus of many and has generated extensive debate. Approaches commonly advocated in the literature include a mix of ‘population', ‘participation’ and ‘productivity’ measures. Immigration and population policy alongside industry reform and related productivity initiatives are also being pursued. Participation, however, remains a key element of the demographic change policy response. Evidence suggests however, that these approaches are unlikely to deliver the necessary labour force volumes. This has prompted a shift in the participation agenda to also include a stronger focus on skilled and experienced older workers. The literature suggests, however, that the current suite of practices are less than effective for the long-term unemployed, previously long-tenured older workers with specialised skills and trade-displaced workers. Adverse health and human capital outcomes often associated with social disadvantage are complicating factors. This reminds of the complexity of the challenge in seeking to deliver social equity to the disadvantaged and suggests a need for an alternative policy architecture. By integrating the three concepts of health capital, human capital and social capital we show how policy has to change if the older age cohorts of jobseekers are to be assisted to remain employable. This review includes an examination of current policy, a consolidation of the literature and original data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.