225 resultados para construction process re-engineering
Resumo:
Value Management (VM) initially started in early 1940s in the US manufacturing industry has increasingly becoming popular within the construction industry community internationally. It has been widely accepted as an important tool in the management of projects. The structured, systematic and multi-disciplinary approach in decision making process is a niche for VM in delivering better value for money project to the client investment. It would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector especially in the quantity surveying practice. Quantity surveyors increasing involvement in VM provides an opportunity for the profession to re-model some of its traditional services in a more positive light and develop leading-edge skills and promote the profession. International practice has associated VM to be part of services offered in the quantity surveying practice; especially in UK has proven to be a natural progression of QS profession. The introduction of VM as early 1980’s in Malaysia combined with increasing demand for construction project to facilitate nation progress is shedding a positive light for quantity surveying profession to take lead in developing VM as one of their niche area. Therefore, the quantity surveying profession having the opportunity to take lead of this service which reflect their traditional attributes for providing the best value-for-money advise to the client. This paper shall discuss on the development of VM in Malaysia and the challenges VM face services in QS firm to remain ahead of their competitors.
Resumo:
Emerging from the challenge to reduce energy consumption in buildings is a need for research and development into the more effective use of simulation as a decision-support tool. Despite significant research, persistent limitations in process and software inhibit the integration of energy simulation in early architectural design. This paper presents a green star case study to highlight the obstacles commonly encountered with current integration strategies. It then examines simulation-based design in the aerospace industry, which has overcome similar limitations. Finally, it proposes a design system based on this contrasting approach, coupling parametric modelling and energy simulation software for rapid and iterative performance assessment of early design options.
Resumo:
Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants
Resumo:
Design-Build (DB) system has been widely adopted overseas but it has not received the same popularity yet in the People’s Republic of China. The selection of design-build variant is regarded as one of the critical obstacles to the application of this alternative. This paper investigates categories of design-build variants in the construction market of China. The develop-and-construction, enhanced design-build, traditional-design-build and engineering procurement-construction (EPC) are the four current designbuild variants adopted by clients. Each of them is developed to meet a varying set of circumstances and has its own advantages and disadvantages. The develop-and-construction is mostly used in large, complex projects in housing industry and it will guarantee client’s great control over the project while still leave some design room for the contractor. The traditional-design-build and enhanced-design-build systems are mostly applied in projects that are comparatively simple, small-scale, and the DB contractors will have greater control of the projects. The EPC is the extension of pure design-build method and is widely adopted in the petrochemical, metallurgical and electronic fields because of the high-technique requirements and the necessity for one entity to control the design, construction, procurement and commissioning etc. Four corresponding design-build projects are also presented in this paper in order to better illustrate the operational process and provide the insight for understanding the design-build variants in Mainland China.
Resumo:
Though the value of a process-centred view for the understanding and (re-)design of corporations has been widely accepted, our understanding of the research process in Information Systems (IS) remains superficial. A process-centred view on IS research considers the conduct of a research project as a sequence of activities involving resources, data and research artifacts. As such, it helps to reflect on more effective ways to conduct IS research, to consolidate and compare diverse practices and to complement the focus on research methodologies with research project practices. This paper takes a first step towards the discipline of ‘Research Process Management’ by exploring the features of research processes and by presenting a preliminary approach for research process design that can facilitate modelling IS research. The case study method and the design science research method are used as examples to demonstrate the potential of such reference research process models.
Resumo:
A key issue in the economic development and performance of organizations is the existence of standards. Their definition and control are sources of power and it is important to understand their concept, as it gives standards their direction and their legitimacy, and to explore how they are represented and applied. The difficulties posed by classical micro-economics in establishing a theory of standardization that is compatible with its fundamental axiomatic are acknowledged. We propose to reconsider the problem by taking the opposite perspective in questioning its theoretical base and by reformulating assumptions about the independent and autonomous decisions taken by actors. The Theory of Conventions will offer us a theoretical framework and tools enabling us to understand the systemic dimension and dynamic structure of standards. These will be seen as a special case of conventions. This work aims to provide a sound basis and promote a better consciousness in the development of global project management standards. It aims also to emphasize that social construction is not a matter of copyright but a matter of open minds, collective cognitive process and freedom for the common wealth.
Resumo:
A key issue for the economic development and for performance of organizations is the existence of standards. As their definitions and control are source of power, it seems to be important to understand the concept and to wonder about the representations authorized by the concept which give their direction and their legitimacy. The difficulties of classical microeconomics of establishing a theory of standardisation compatible with its fundamental axiomatic are underlined. We propose to reconsider the problem by carrying out the opposite way: to question the theoretical base, by reformulating assumptions on the autonomy of the choice of the actors. The theory of conventions will offer us both a theoretical framework and tools, enabling us to understand the systemic dimension and dynamic structure of standards seen as special case of conventions. This work aims thus to provide a sound basis and promote a better consciousness in the development of global project management standards, aiming also to underline that social construction is not a matter of copyright but a matter of open minds, collective cognitive process and freedom for the common wealth.
Resumo:
Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.
Resumo:
Sustainability has emerged as a primary context for engineering education in the 21st Century, particularly the sub-discipline of chemical engineering. However, there is confusion over how to go about integrating sustainability knowledge and skills systemically within bachelor degrees. This paper addresses this challenge, using a case study of an Australian chemical engineering degree to highlight important practical considerations for embedding sustainability at the core of the curriculum. The paper begins with context for considering a systematic process for rapid curriculum renewal. The authors then summarise a 2-year federally funded project, which comprised piloting a model for rapid curriculum renewal led by the chemical engineering staff. Model elements contributing to the renewal of this engineering degree and described in this paper include: industry outreach; staff professional development; attribute identification and alignment; program mapping; and curriculum and teaching resource development. Personal reflections on the progress and process of rapid curriculum renewal in sustainability by the authors and participating engineering staff will be presented as a means to discuss and identify methodological improvements, as well as highlight barriers to project implementation. It is hoped that this paper will provide an example of a formalised methodology on which program reform and curriculum renewal for sustainability can be built upon in other higher education institutions.
Resumo:
The construction industry demands priority from all governments because it impacts economically and socially on all citizens. A number of recent studies have identified inefficiencies in the Australian construction industry by modelling the building process. A culture of reform supported by industry and government is now emerging in the industry – one in which alternate forms of project delivery are being trialed. The Australian Building and Construction Industry Action Agenda brought together industry and government to identify actions necessary to lift Australia’s innovative and knowledge creating capacity at the sector level. A central activity under this Action Agenda was dissemination of information relating to industry best practice initiatives in innovation, project delivery and the use of information technology. Government and industry identified project alliance contracting and more advanced information technology as means to increase efficiency in construction as part of a new innovative procurement environment.
Resumo:
The construction of a Lunar Base is seen as achievable. The paper provides a useful summary of challenges facing pioneers of lunar base construction. It highlights important aspects of the location and use of the facility, the local environment, the human physiological adaptation process, and a principal concern for the construction industry—construction materials and methods required to erect the facility. Specific emphasis is placed on the latter two major issues. The authors believe that a lunar base will be built, operated and maintained by humans. It may be the next generation that carry out these dreams, but it is research of the type reported in this paper that will make these dreams a reality.
Resumo:
Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general.
Resumo:
Data mining techniques extract repeated and useful patterns from a large data set that in turn are utilized to predict the outcome of future events. The main purpose of the research presented in this paper is to investigate data mining strategies and develop an efficient framework for multi-attribute project information analysis to predict the performance of construction projects. The research team first reviewed existing data mining algorithms, applied them to systematically analyze a large project data set collected by the survey, and finally proposed a data-mining-based decision support framework for project performance prediction. To evaluate the potential of the framework, a case study was conducted using data collected from 139 capital projects and analyzed the relationship between use of information technology and project cost performance. The study results showed that the proposed framework has potential to promote fast, easy to use, interpretable, and accurate project data analysis.