Delay in the delivery of manufacturing projects is a major problem in manufacturing industries. This research investigates the factors that influence the lead time of new projects in manufacturing organisations. Employing a questionnaire survey and interview methodologies, this study collected data from five leading manufacturing organisations as well as their suppliers and contractors in Saudi Arabia to examine what, how and why the new project implementation delay occurs. Results show that the main factors contributing to manufacturing delays are related to people and material. On the other hand, social, political and cultural factors were the least significant factors as per the outcome of this study. Views of manufacturers, suppliers and contractors regarding causes of delays have also been analysed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Overview The incidence of skin tears, pressure injuries and chronic wounds increases with age [1-4] and therefore is a serious issue for staff and residents in Residential Aged Care Facilities (RACFs). A pilot project funded in Round 2 of the Encouraging Best Practice in Residential Aged Care (EBPRAC) program by the then Australian Government Department of Health and Ageing found that a substantial proportion of residents in aged care facilities experienced pressure injuries, skin tears or chronic wounds. It also found the implementation of the evidence based Champions for Skin Integrity (CSI) model of wound care was successful in significantly decreasing the prevalence and severity of wounds in residents, improving staff skills and knowledge of evidence based wound management, increasing staff confidence with wound management, increasing implementation of evidence based wound management and prevention strategies, and increasing staff awareness of their roles in evidence based wound care at all levels [5]. Importantly, during the project, the project team developed a resource kit on evidence based wound management. Two critical recommendations resulting from the project were that: - The CSI model or a similar strategic approach should be implemented in RACFs to facilitate the uptake of evidence based wound management and prevention - The resource kit on evidence based wound management should be made available to all Residential Aged Care Facilities and interested parties A proposal to disseminate or rollout the CSI model of wound care to all RACFs across Australia was submitted to the department in 2012. The department approved funding from the Aged Care Services Improvement Healthy Ageing Grant (ACSIHAG) at the same time as the Round 3 of the Encouraging Better Practice in Aged Care (EBPAC) program. The dissemination involved two crucial elements: 1. The updating, refining and distribution of a Champions for Skin Integrity Resource Kit, more commonly known as a CSI Resource Kit and 2. The presentation of intensive one day Promoting Healthy Skin “Train the Trainer” workshops in all capital cities and major regional towns across Australia Due to demand, the department agreed to fund a second round of workshops focussing on regional centres and the completion date was extended to accommodate the workshops. Later, the department also decided to host a departmental website for a number of clinical domains, including wound management, so that staff from the residential aged care sector had easy access to a central repository of helpful clinical resource material that could be used for improving the health and wellbeing of their older adults, consumers and carers. CSI Resource Kit Upgrade and Distribution: At the start of the project, a full evidence review was carried out on the material produced during the EBPRAC-CSI Stage 1 project and the relevant evidence based changes were made to the documentation. At the same time participants in the EBPRAC-CSI Stage 1 project were interviewed for advice on how to improve the resource material. Following this the documentation, included in the kit, was sent to independent experts for peer review. When this process was finalised, a learning designer and QUT’s Visual Communications Services were engaged to completely refine and update the design of the resources, and combined resource kit with the goal of keeping the overall size of the kit suitable for bookshelf mounting and the cost at reasonable levels. Both goals were achieved in that the kit is about the same size as a 25 mm A4 binder and costs between $19.00 and $28.00 per kit depending on the size of the print run. The dissemination of the updated CSI resource kit was an outstanding success. Demand for the kits was so great that a second print run of 2,000 kits was arranged on top of the initial print run of 4,000 kits. All RACFs across Australia were issued with a kit, some 2,740 in total. Since the initial distribution another 1,100 requests for kits has been fulfilled as well as 1,619 kits being distributed to participants at the Promoting Healthy Skin workshops. As the project was winding up a final request email was sent to all workshop participants asking if they required additional kits or resources to distribute the remaining kits and resources. This has resulted in requests for 200 additional kits and resources. Feedback from the residential aged care sector and other clinical providers who have interest in wound care has been very positive regarding the utility of the kit, (see Appendix 4). Promoting Healthy Skin Workshops The workshops also exceeded the project team’s initial objective. Our goal of providing workshop training for staff from one in four facilities and 450 participants was exceeded, with overwhelming demand for workshop places resulting in the need to provide a second round of workshops across Australia. At the completion of the second round, 37 workshops had been given, with 1286 participants, representing 835 facilities. A number of strategies were used to promote the workshops ranging from invitations included in the kit, to postcard mail-outs, broadcast emailing to all facilities and aged care networks and to articles and paid advertising in aged care journals. The most effective method, by far, was directly phoning the facilities. This enabled the caller to contact the relevant staff member and enlist their support for the workshop. As this is a labour intensive exercise, it was only used where numbers needed bolstering, with one venue rising from 3 registrants before the calls to 53 registrants after. The workshops were aimed at staff who had the interest and the capability of implementing evidence-based wound management within their facility or organisation. This targeting was successful in that a large proportion (68%) of participants were Registered Nurses, Nurse Managers, Educators or Consultants. Twenty percent were Endorsed Enrolled Nurses with the remaining 12% being made up of Personal Care Workers or Allied Health Professionals. To facilitate long term sustainability, the workshop employed train-the-trainer strategies. Feedback from the EBPRAC-CSI Stage 1 interviews was used in the development of workshop content. In addition, feedback from the workshop conducted at the end of the EBPRAC-CSI Stage 1 project suggested that change management and leadership training should be included in the workshops. The program was trialled in the first workshop conducted in Brisbane and then rolled out across Australia. Participants were asked to complete pre and post workshop surveys at the beginning and end of the workshop to determine how knowledge and confidence improved over the day. Results from the pre and post surveys showed significant improvements in the level of confidence in attendees’ ability to implement evidence based wound management. The results also indicated a significant increase in the level of confidence in ability to implement change within their facility or organisation. This is an important indication that the inclusion of change management/leadership training with clinical instruction can increase staff capacity and confidence in translating evidence into practice. To encourage the transfer of the evidence based content of the workshop into practice, participants were asked to prepare an Action Plan to be followed by a simple one page progress report three months after the workshop. These reports ranged from simple (e.g. skin moisturising to prevent skin tears), to complex implementation plans for introducing the CSI model across the whole organisation. Outcomes described in the project reports included decreased prevalence of skin tears, pressure injuries and chronic wounds, along with increased staff and resident knowledge and resident comfort. As stated above, some organisations prepared large, complex plans to roll out the CSI model across their organisation. These plans included a review of the organisation’s wound care system, policies and procedures, the creation of new processes, the education of staff and clients, uploading education and resource material onto internal electronic platforms and setting up formal review and evaluation processes. The CSI Resources have been enthusiastically sought and incorporated into multiple health care settings, including aged care, acute care, Medicare Local intranets (e.g. Map of Medicine e-pathways), primary health care, community and home care organisations, education providers and New Zealand aged and community health providers. Recommendations: Recommendations for RACFs, aged care and health service providers and government  Skin integrity and the evidence-practice gap in this area should be recognised as a major health issue for health service providers for older adults, with wounds experienced by up to 50% of residents in aged care settings (Edwards et al. 2010). Implementation of evidence based wound care through the Champions for Skin Integrity model in this and the pilot project has demonstrated the prevalence of wounds, wound healing times and wound infections can be halved.  A national program and Centre for Evidence Based Wound Management should be established to: - expand the reach of the model to other aged care facilities and health service providers for older adults - sustain the uptake of models such as the Champions for Skin Integrity (CSI) model - ensure current resources, expertise and training are available for consumers and health care professionals to promote skin integrity for all older adults  Evidence based resources for the CSI program and similar projects should be reviewed and updated every 3 – 4 years as per NH&MRC recommendations  Leadership and change management training is fundamental to increasing staff capacity, at all levels, to promote within-organisation dissemination of skills and knowledge gained from projects providing evidence based training Recommendations for future national dissemination projects  A formal program of opportunities for small groups of like projects to share information and resources, coordinate activities and synergise education programs interactively would benefit future national dissemination projects - Future workshop programs could explore an incentive program to optimise attendance and reduce ‘no shows’ - Future projects should build in the capacity and funding for increased follow-up with workshop attendees, to explore the reasons behind those who are unable to translate workshop learnings into the workplace and identify factors to address these barriers.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Queensland Transport Industry Workplace Health Intervention project was a Participatory Action Research (PAR) project to investigate the effectiveness of workplace-based nutrition and physical activity health promotion interventions for truck drivers in transport industry workplaces in south-east Queensland. The project was conducted by a research team at the Queensland University of Technology (QUT), and was funded by the Queensland Government under the Healthier.Happier.Workplaces initiative.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background Project archives are becoming increasingly large and complex. On construction projects in particular, the increasing amount of information and the increasing complexity of its structure make searching and exploring information in the project archive challenging and time-consuming. Methods This research investigates a query-driven approach that represents new forms of contextual information to help users understand the set of documents resulting from queries of construction project archives. Specifically, this research extends query-driven interface research by representing three types of contextual information: (1) the temporal context is represented in the form of a timeline to show when each document was created; (2) the search-relevance context shows exactly which of the entered keywords matched each document; and (3) the usage context shows which project participants have accessed or modified a file. Results We implemented and tested these ideas within a prototype query-driven interface we call VisArchive. VisArchive employs a combination of multi-scale and multi-dimensional timelines, color-coded stacked bar charts, additional supporting visual cues and filters to support searching and exploring historical project archives. The timeline-based interface integrates three interactive timelines as focus + context visualizations. Conclusions The feasibility of using these visual design principles is tested in two types of project archives: searching construction project archives of an educational building project and tracking of software defects in the Mozilla Thunderbird project. These case studies demonstrate the applicability, usefulness and generality of the design principles implemented.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In competitive tourism markets the consumer-traveller is spoilt by choice of available destinations. Successfully differentiating a destination and getting noticed at decision time is arguably the focus of activities by destination marketing organisations (DMOs). In pursuit of differentiation, three emergent themes in the marketing literature during the past decade have been branding, integrated marketing communications (IMC), and customer relationship management (CRM) a fundamental goal of each being stimulating customer loyalty. However there has been little attention given to destination loyalty in the tourism literature. The purpose of this paper is to report an exploratory investigation of visitor relationship management (VRM) by DMOs. Based on interviews with the management of 11 regional tourism organisations (RTO) in Queensland, Australia, the opportunities for, and immediate challenges of, VRM are discussed. While each RTO recognised the potential for VRM, none had yet been able to develop a formal approach to engage in meaningful dialogue with previous visitors from their largest market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The PMBOK Guide is one of the most influential publications concerning the knowledge of the project manangement. Moreover, the pervasion of this guide seems to be set to increase as the basis of accreditation - in conjunction with the increasing global trend toward obtaining project management professional status. However, despite the influence and strengthening profile of this guide, reports continue to be published that detail numerous project failures in a wide range of different industries. The PMBOK Guide comprises mainly declarative (know-what) and procedural (know-how) information. In this sense, the guide is largely normative and provides a very good example of the limitations of this approach as highlighted by proponents of a move to the genuine application of positibe theory in project management.----- The aim of this paper is to determine the applicability of the guide in Australia and to determine the extent to which project success can be attributed to the guide. Project Managers from a variety of organisations were surveyed. This postal survey yielded 48 replies. Descriptive statistics was used to assess the incidence and effectivieness of all the processes in the guide. The results indicate that there were no processes that could be considered as peripheral or as a candidate for elimination from the guide. More specifically, all the processes were identified as either a key routine process or a key selective process and positively related to the level of project success. However, the results also indicated that other major factors pertaining to causal knowledge (know-why) are, at least, equally important determinants of project success. It is concluded that declarative, procedural and causal knowledge are all valuable, and given the preponderance of the first two types of knowledge, there seems to be an urgent need to now ensure an equal quest for causal knowledge. In terms of developing causal knowledge, a good starting point would appear to be both positive theory from production and economics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Banana bunchy top is regarded as the most important viral disease of banana, causing significant yield losses worldwide. The disease is caused by Banana bunchy top virus (BBTV), which is a circular ssDNA virus belonging to the genus Babuvirus in the family Nanoviridae. There are currently few effective control strategies for this and other ssDNA viruses. “In Plant Activation” (InPAct) is a novel technology being developed at QUT for ssDNA virus-activated suicide gene expression. The technology exploits the rolling circle replication mechanism of ssDNA viruses and is based on a unique “split” gene design such that suicide gene expression is only activated in the presence of the viral Rep. This PhD project aimed to develop a BBTV-based InPAct system as a suicide gene strategy to control BBTV. The BBTV-based InPAct vector design requires a BBTV intergenic region (IR) to be embedded within an intron in the gene expression cassette. To ensure that the BBTV IR would not interfere with intron splicing, a TEST vector was initially generated that contained the entire BBTV IR embedded within an intron in a β-glucuronidase (GUS) expression vector. Transient GUS assays in banana embryogenic cell suspensions indicated that cryptic intron splice sites were present within the IR. Transcript analysis revealed two cryptic intron splice sites in the Domain III sequence of the CR-M within the IR. Removal of the CR-M from the TEST vector resulted in an enhancement of GUS expression suggesting that the cryptic intron splice sites had been removed. An InPAct GUS vector was subsequently generated that contained the modified BBTV IR, with the CR-M (minus Domain III) repositioned within the InPAct cassette. Using transient histochemical and fluorometric GUS assays in banana embryogenic cells, the InPAct GUS vector was shown to be activated in the presence of the BBTV Rep. However, the presence of both BBTV Rep and Clink was shown to have a deleterious effect on GUS expression suggesting that these proteins were cytotoxic at the levels expressed. Analysis of replication of the InPAct vectors by Southern hybridisation revealed low levels of InPAct cassette-based episomal DNA released from the vector through the nicking/ligation activity of BBTV Rep. However, Rep-mediated episomal replicons, indicative of rolling circle replication of the released circularised cassettes, were not observed. The inability of the InPAct cassette to be replicated was further investigated. To examine whether the absence of Domain III of the CR-M was responsible, a suite of modified BBTV-based InPAct GUS vectors was constructed that contained the CR-M with the inclusion of Domain III, the CR-M with the inclusion of Domain III and additional upstream IR sequence, or no CR-M. Analysis of replication by Southern hybridisation revealed that neither the presence of Domain III, nor the entire CR-M, had an effect on replication levels. Since the InPAct cassette was significantly larger than the native BBTV genomic components (approximately 1 kb), the effect of InPAct cassette size on replication was also investigated. A suite of size variant BBTV-based vectors was constructed that increased the size of a replication competent cassette to 1.1 kbp through to 2.1 kbp.. Analysis of replication by Southern hybridisation revealed that an increase in vector size above approximately 1.5 - 1.7 kbp resulted in a decrease in replication. Following the demonstration of Rep-mediated release, circularisation and expression from the InPAct GUS vector, an InPAct vector was generated in which the uidA reporter gene was replaced with the ribonuclease-encoding suicide gene, barnase. Initially, a TEST vector was generated to assess the cytotoxicity of Barnase on banana cells. Although transient assays revealed a Barnase-induced cytotoxic effect in banana cells, the expression levels were sub-optimal. An InPAct BARNASE vector was generated and tested for BBTV Rep-activated Barnase expression using transient assays in banana embryogenic cells. High levels of background expression from the InPAct BARNASE vector made it difficult to accurately assess Rep-activated Barnase expression. Analysis of replication by Southern hybridisation revealed low levels of InPAct cassette-based episomal DNA released from the vector but no Rep-mediated episomal replicons indicative of rolling circle replication of the released circularised cassettes were again observed. Despite the inability of the InPAct vectors to replicate to enable high level gene expression, the InPAct BARNASE vector was assessed in planta for BBTV Rep-mediated activation of Barnase expression. Eleven lines of transgenic InPAct BARNASE banana plants were generated by Agrobacterium-mediated transformation and were challenged with viruliferous Pentalonia nigronervosa. At least one clonal plant in each line developed bunchy top symptoms and infection was confirmed by PCR. No localised lesions were observed on any plants, nor was there any localised GUS expression in the one InPAct GUS line challenged with viruliferous aphids. The results presented in this thesis are the first study towards the development of a BBTV-based InPAct system as a Rep-activatable suicide gene expression system to control BBTV. Although further optimisation of the vectors is necessary, the preliminary results suggest that this approach has the potential to be an effective control strategy for BBTV. The use of iterons within the InPAct vectors that are recognised by Reps from different ssDNA plant viruses may provide a broad-spectrum resistance strategy against multiple ssDNA plant viruses. Further, this technology holds great promise as a platform technology for the molecular farming of high-value proteins in vitro or in vivo through expression of the ssDNA virus Rep protein.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Developing an effective impact evaluation framework, managing and conducting rigorous impact evaluations, and developing a strong research and evaluation culture within development communication organisations presents many challenges. This is especially so when both the community and organisational context is continually changing and the outcomes of programs are complex and difficult to clearly identify.----- This paper presents a case study from a research project being conducted from 2007-2010 that aims to address these challenges and issues, entitled Assessing Communication for Social Change: A New Agenda in Impact Assessment. Building on previous development communication projects which used ethnographic action research, this project is developing, trailing and rigorously evaluating a participatory impact assessment methodology for assessing the social change impacts of community radio programs in Nepal. This project is a collaboration between Equal Access – Nepal (EAN), Equal Access – International, local stakeholders and listeners, a network of trained community researchers, and a research team from two Australian universities. A key element of the project is the establishment of an organisational culture within EAN that values and supports the impact assessment process being developed, which is based on continuous action learning and improvement. The paper describes the situation related to monitoring and evaluation (M&E) and impact assessment before the project began, in which EAN was often reliant on time-bound studies and ‘success stories’ derived from listener letters and feedback. We then outline the various strategies used in an effort to develop stronger and more effective impact assessment and M&E systems, and the gradual changes that have occurred to date. These changes include a greater understanding of the value of adopting a participatory, holistic, evidence-based approach to impact assessment. We also critically review the many challenges experienced in this process, including:----- • Tension between the pressure from donors to ‘prove’ impacts and the adoption of a bottom-up, participatory approach based on ‘improving’ programs in ways that meet community needs and aspirations.----- • Resistance from the content teams to changing their existing M&E practices and to the perceived complexity of the approach.----- • Lack of meaningful connection between the M&E and content teams.----- • Human resource problems and lack of capacity in analysing qualitative data and reporting results.----- • The contextual challenges, including extreme poverty, wide cultural and linguistic diversity, poor transport and communications infrastructure, and political instability.----- • A general lack of acceptance of the importance of evaluation within Nepal due to accepting everything as fate or ‘natural’ rather than requiring investigation into a problem.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explores how we may design located information and communication technologies (ICTs) to foster community sentiment. It focuses explicitly on possibilities for ICTs to create new modalities of place through exploring key factors such as shared experiences, shared knowledge and shared authorship. To contextualise this discussion in a real world setting, this paper presents FIGMENTUM, a situated generative art application that was developed for and installed in a new urban development. FIGMENTUM is a non-authoritative, non-service based application that aims to trigger emotional and representational place-based communities. Out of this practice-led research comes a theory and a process for designing creative place-based ICT’s to animate our urban communities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The importance of broadening community participation in environmental decision-making is widely recognized and lack of participation in this process appears to be a perennial problem. In this context, there have been calls from some academics for the more extensive use of geographic information systems (GIS) and distance learning technologies, accessible via the Internet, as a possible means to inform and empower communities. However, a number of problems exist. For instance, at present the scope for online interaction between policy-makers and citizens is currently limited. Contemporary web-based environmental information systems suffer from this lack of interactivity on the one hand and on the other hand from the apparent complexity for the lay user. This paper explores the issue of online community participation at the local level and attempts to construct a framework for a new (and potentially more effective) model of online participatory decision-making. The key components, system architecture and stages of such a model are introduced. This model, referred to as a ‘Community Based Interactive Environmental Decision Support System’, incorporates advanced information technologies, distance learning and community involvement tools which will be applied and evaluated in the field through a pilot project in Tokyo in the summer of 2002.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary The objective of this report was to use the Sydney Opera House as a case study of the application of Building Information Modelling (BIM). The Sydney opera House is a complex, large building with very irregular building configuration, that makes it a challenging test. A number of key concerns are evident at SOH: • the building structure is complex, and building service systems - already the major cost of ongoing maintenance - are undergoing technology change, with new computer based services becoming increasingly important. • the current “documentation” of the facility is comprised of several independent systems, some overlapping and is inadequate to service current and future services required • the building has reached a milestone age in terms of the condition and maintainability of key public areas and service systems, functionality of spaces and longer term strategic management. • many business functions such as space or event management require up-to-date information of the facility that are currently inadequately delivered, expensive and time consuming to update and deliver to customers. • major building upgrades are being planned that will put considerable strain on existing Facilities Portfolio services, and their capacity to manage them effectively While some of these concerns are unique to the House, many will be common to larger commercial and institutional portfolios. The work described here supported a complementary task which sought to identify if a building information model – an integrated building database – could be created, that would support asset & facility management functions (see Sydney Opera House – FM Exemplar Project, Report Number: 2005-001-C-4 Building Information Modelling for FM at Sydney Opera House), a business strategy that has been well demonstrated. The development of the BIMSS - Open Specification for BIM has been surprisingly straightforward. The lack of technical difficulties in converting the House’s existing conventions and standards to the new model based environment can be related to three key factors: • SOH Facilities Portfolio – the internal group responsible for asset and facility management - have already well established building and documentation policies in place. The setting and adherence to well thought out operational standards has been based on the need to create an environment that is understood by all users and that addresses the major business needs of the House. • The second factor is the nature of the IFC Model Specification used to define the BIM protocol. The IFC standard is based on building practice and nomenclature, widely used in the construction industries across the globe. For example the nomenclature of building parts – eg ifcWall, corresponds to our normal terminology, but extends the traditional drawing environment currently used for design and documentation. This demonstrates that the international IFC model accurately represents local practice for building data representation and management. • a BIM environment sets up opportunities for innovative processes that can exploit the rich data in the model and improve services and functions for the House: for example several high-level processes have been identified that could benefit from standardized Building Information Models such as maintenance processes using engineering data, business processes using scheduling, venue access, security data and benchmarking processes using building performance data. The new technology matches business needs for current and new services. The adoption of IFC compliant applications opens the way forward for shared building model collaboration and new processes, a significant new focus of the BIM standards. In summary, SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. These BIM standards and their application to the Opera House are intended as a template for other organisations to adopt for the own procurement and facility management activities. Appendices provide an overview of the IFC Integrated Object Model and an understanding IFC Model Data.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.