547 resultados para Project Telstar.
Resumo:
This brief paper outlines some of the early work undertaken in Indigenous postgraduate activism in Australia. In particular, the work undertaken in the lead up to the 'Project into the Barriers which Indigenous Students must Overcome in Postgraduate Studies'.
Resumo:
A small collection of creative works developed to acompany some of the artistic images developed by visual artist Dr Pamela Croft for the Yeppoon Public Art Project in 2000.
Resumo:
Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context. Execution of many similar industrial projects creates the idea of lean project management in companies and rapidly growing in industries. This paper offers the standardization method in order to achieve Lean project management in large scale industrial project. Standardization refers to all activity which makes two projects most identical and unify to each other like standardization of design, reducing output variability, value analysis and strategic management. Although standard project may have minor effi ciency decrease, compare to custom built project; but great advantage of standard project like cost saving, time reduction and quality improvement justify standardization methodology. This paper based on empirical experience in industrial project and theoretical analysis of benefi ts of project standardization.
Resumo:
International practice-led design research in landscape architecture has identified the need for addressing the loss of biodiversity in urban environments. China has lost much of its biodiversity in rural and urban environments over thousands of years. However some Chinese cities have attempted to conserve what remains and enhance existing vegetation communities in isolated pockets. Island biogeography has been used as the basis for planning and designing landscapes in Australia and North America but not as yet in China, as far as we know. A gap in landscape design knowledge exists regarding how to apply landscape ecology concepts to urban islands of remaining biodiversity being developed for heavy Chinese domestic tourism impacts in the future. This project responded to the demands for harbour-side tourism opportunities in Xiamen City, Fujian Province, by proposing a range of eco-design innovations using concepts of patch, edge and interior to interconnect people and nature in a Chinese setting.
Resumo:
Chinese landscape architects are largely focused on objective practical solutions to environmental problems. In the West, theoretical landscape knowledge is largely conceptual and abstract. This research debated how Australian ecological concepts could or should be transposed to Chinese landscapes. This project responded to severe water and soil pollution issues in the estuarine and riparian zones of rivers flowing into Dongting Lake, in Yueyang City, Hunan Province. This work proposed a range of waterfront design innovations that challenged the notion of corridor as habitat, filter, barrier and conduit in a Chinese riparian context.
Resumo:
The Centre for Subtropical Design at QUT, in partnership with the Queensland Government and Brisbane City Council, conducts research focused on 'best practice' outcomes for higher density urban living environments in the subtropics through the study of typical urban residential typologies, and urban design. The aim of the research is to inform and illustrate best practice subtropical design principles to policy makers and development industry professionals to stimulate climate-responsive outcomes. The Centre for Subtropical Design recently sought project-specific funding from the Queensland Department of Infrastructure and Planning (DIP) to investigate residential typologies for sustainable subtropical urban communities, based on transit orientated development principles and outcomes for areas around public transport nodes. A development site within the Fitzgibbon Urban Development Area, and close to a rail and bsu transport corridor, provided a case study location for this project. Four design-led multi-disciplinary creative teams participated in a Design Charrette and have produced concept drawings and propositions on a range of options, or prototypes. Analysis of selected prototypes has been undertaken to determine their environmental, economic and social performance. This Project Report discusses the scope of the project funded by DIP in terms of activities undertaken to date, and deliverables achieved. A subsequent Research Report will discuss the detailed findings of the analysis.
Resumo:
This paper describes the Smart Skies project, an ambitious and world-leading research endeavor exploring the development of key enabling technologies, which support the efficient utilization of airspace by manned and unmanned airspace users. This paper provides a programmatic description of the research and development of: an automated separation management system, a mobile aircraft tracking system, and aircraft-based sense-and-act technologies. A summary of the results from a series of real-world flight testing campaigns is also presented.
Resumo:
In December 2006, the Engineering and Technology Group of Queensland’s Department of Main Roads entered into a three-year skid resistance management research project with QUT Faculty of Built Environment and Engineering researchers and the QUT-based CRC for Integrated Engineering Asset Management (CIEAM). CIEAM undertakes a broad range of asset management research in the areas of defence, utilities, transportation and industrial processes. “The research project is an important activity of Main Roads’ Skid Resistance Management Plan published in June 2006.” said Main Roads project leader Mr Justin Weligamage. “The intended project output is a decision-support model for use by Road Asset Managers throughout a road network. The research objective is to enable road asset managers to better manage the surfacing condition of the road asset with specific focus on skid resistance,” said QUT project leader Professor Arun Kumar. The research project will review existing skid resistance investigatory levels, develop a risk-based method to establish skid resistance investigatory levels and improve the decision support methodology in order to minimise crashes. The new risk-based approach will be used to identify locations on the Queensland state-controlled road network that may have inadequate skid resistance. Once a high risk site is identified, the appropriate remedial action will be decided on. This approach will allow road asset managers to target optimal remedial actions, reducing the incidence and severity of crashes where inadequate skid resistance is a contributing cause.
Resumo:
This paper investigated the phenomenon of prejudice among ISD project members. We presented a theoretical discussion followed by one qualitative and one quantitative study. In the qualitative study, we interviewed different members of the project teams to understand the different types of prejudice possessed by team members. Results of this interview study led to the development of prejudice scales for IT members and users, which was used in the quantitative study. We surveyed 128 ISD teams and found that prejudice was related task and relationship conflict, satisfaction and willingness to work together in the future. Furthermore, prejudice exerts stronger influences on users than IT members in terms of increasing task and relationship conflicts and decreasing goal commitment.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
Increasingly, Australian universities are facing the challenges of global education. While overseas students studying in Australia provide the primary source of export earnings for educational institutions, a number of institutions, including QUT, are also involved in international trade in educational services by providing services offshore. This paper discusses driving forces behind moves by Australian universities to enter the international education market. It then briefly describes Queensland University of Technology’s internationalisation strategy. The paper concludes with a case study describing how the School of Construction Management has pioneered the development of offshore courses at QUT. The introduction of the Master of Project Management and Graduate Diploma of Project Management programs in Singapore in November 1993 represented QUT’s first experience in this area. With the experience of 18 months of operation, the School now has the opportunity to reflect on the outcomes of this venture and consider future options.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.