180 resultados para Building blocks in elastomer composite fabrication
Resumo:
Despite a general belief that incentive mechanisms can improve value for money during procurement and performance during project execution, empirical research on the actual effects is nascent. This research focuses on the design and implementation of incentive mechanisms in four different infrastructure projects: two road reconstructions in the Netherlands and two building constructions in Australia. Based on an analytical framework of key motivation drivers, a cross cases analysis is conducted in view of performance on the contract assumptions, selection phase, execution phase and project contract performance. It was identified that despite significant differences in the project characteristics, results indicate that they experience similar contextual drivers on the incentive effectiveness. High value was placed on risk allocation and relationship building in the selection and construction phase. The differences can be explained from both contextual and project related characteristics. Although there are limitations with this research in drawing generalizations across two sets of case projects, the results provide a strong base to explore the nature of incentive systems across different geographical and contextual boundaries in future research.
Resumo:
Cold-formed steel stud walls are an important component of Light Steel Framing (LSF) building systems used in commercial, industrial and residential buildings. In the conventional LSF stud wall systems, thin-walled steel studs are protected from fire by placing one or two layers of plasterboard on both sides with or without cavity insulation. However, there is very limited data about the structural and thermal performance of these wall systems while past research showed contradicting results about the benefits of cavity insulation. This research proposed a new LSF stud wall system in which a composite panel made of two plasterboards with insulation between them was used to improve the fire rating of walls. Full scale fire tests were conducted using both conventional steel stud walls with and without the use of cavity insulation and the new composite panel system. Eleven full scale load bearing wall specimens were tested to study the thermal and structural performances of the load bearing wall assemblies under standard fire conditions. These tests showed that the use of cavity insulation led to inferior fire performance of walls while also providing good explanations and supporting test data to overcome the incorrect industry assumptions about cavity insulation. Tests demonstrated that the use of external insulation in a composite panel form enhanced the thermal and structural performances of stud walls and increased their fire resistance rating significantly. This paper presents the details of the full scale fire tests of load-bearing wall assemblies lined with plasterboards and different types of insulation under varying load ratios. Test results including the temperature and deflection profiles of walls measured during the fire tests will be presented along with their failure modes and failure times.
Resumo:
Abstract. Fire resistance has become an important part in structural design due to the ever increasing loss of properties and lives every year. Conventionally the fire rating of load bearing Light gauge Steel Frame (LSF) walls is determined using standard fire tests based on the time-temperature curve given in ISO 834 [1]. Full scale fire testing based on this standard time-temperature curve originated from the application of wood burning furnaces in the early 1900s and it is questionable whether it truly represents the fuel loads in modern buildings. Hence a detailed fire research study into the performance of LSF walls was undertaken using real design fires based on Eurocode parametric curves [2] and Barnett’s ‘BFD’ curves [3]. This paper presents the development of these real fire curves and the results of full scale experimental study into the structural and fire behaviour of load bearing LSF stud wall systems.
Resumo:
In order to promote green building practice in Australia, the Green Building Council of Australia (GBCA) launched the Green Star rating tools for various types of buildings built since 2003. Of these, the Green Star-Education rating tool addresses sustainability issues during the design and construction phrases of education facility development. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use & Ecology, Emissions and Innovation. This paper reviews the use of the Green Star system in Australian education facilities construction and the potential challenges associated with Green Star- Education implementation. Score sheets of 34 education projects across Australia that achieved Green Star certification were collected and analysed. The percentage of green star points obtained within each category and sub-category (credits) for each project were analysed to illustrate the achievement of credits. The results show that management-related credits and ecology-related credits are the easiest and most difficult to obtain respectively. The study also indicted that 6 Green Star education projects obtained particularly high percentages in the Innovation category. The investigation of points obtained in each category provides prospective Green Star applicants with insights into credit achievement for future projects.
Resumo:
Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli’s law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.
Resumo:
This paper reports outcomes of a pilot study to develop a conceptual framework to allow people to retrofit a building-layer to gain better control of their own built- environments. The study was initiated by the realisation that discussions surrounding the improvement of building performances tend to be about top-down technological solutions rather than to help and encourage bottom-up involvement of building-users. While users are the ultimate beneficiaries and their feedback is always appreciated, their direct involvements in managing buildings would often be regarded as obstruction or distraction. This is largely because casual interventions by uninformed building-users tend to disrupt the system. Some earlier researches showed however that direct and active participation of users could improve the building performance if appropriate training and/or systems were introduced. We also speculate this in long run would also make the built environment more sustainable. With this in mind, we looked for opportunities to retrofit our own office with an interactive layer to study how we could introduce ad-hoc systems for building-users. The aim of this paper is to describe our vision and initial attempts followed by discussion.
Resumo:
It is widely recognized that the quality of design is crucial to the success of the construction or production process and fairly minor changes in design can often result in giving major effects on the cost and efficiency of production and construction as well as on the usefulness, constructability and marketability of the product especially in developing high rise residential property development. The purpose of this study is to suggest a framework model for property manager, considering the sustainable and building quality of property development in high rise residential complex. This paper evaluates and ranks the importance, and frequency of the building quality factors that affect the sustainability and comfort of living for the resident in the selected high rise residential complex in Malaysia. A total of 500 respondents consisting of 20 property managers participated in this study. The respondents were asked to indicate how important each of building equipments in giving them the comfort of living in the selected high rise residential complex. The data were then subjected to the calculation of important indices which enabled the factors to be ranked. After that, a framework model will be developed to make sure all property managers will be guided to prepare their property for the resident to stay in the complex. Accordingly, the living satisfaction by the framework model plays a meaningful role in preparing and developing sustainable and good building quality in Malaysia high rise residential complex.
Resumo:
Metal and semiconductor nanowires (NWs) have been widely employed as the building blocks of the nanoelectromechanical systems, which usually acted a resonant beam. Recent researches reported that nanowires are often polycrystalline, which contains grain boundaries (GBs) that transect the whole nanowire into a bamboo like structure. Based on the larger-scale molecular dynamics (MD) simulations, a comprehensive investigation of the influence from grain boundaries on the vibrational properties of doubly clamped Ag NWs is conducted. It is found that, the presence of grain boundary will result in significant energy dissipation during the resonance of polycrystalline NWs, which leads a great deterioration to the quality factor. Further investigation reveals that the energy dissipation is originated from the plastic deformation of polycrystalline NWs in the form of the nucleation of partial dislocations or the generation of micro stacking faults around the GBs and the micro stacking faults is found to keep almost intact during the whole vibration process. Moreover, it is observed that the closer of the grain boundary getting to the regions with the highest strain state, the more energy dissipation will be resulted from the plastic deformation. In addition, either the increase of the number of grain boundaries or the decrease of the distance between the grain boundary and the highest strain state region is observed to induce a lower first resonance frequency. This work sheds lights on the better understanding of the mechanical properties of polycrystalline NWs, which benefits the increasing utilities of NWs in diverse nano-electronic devices.
Resumo:
Complex Internet attacks may come from multiple sources, and target multiple networks and technologies. Nevertheless, Collaborative Intrusion Detection Systems (CIDS) emerges as a promising solution by using information from multiple sources to gain a better understanding of objective and impact of complex Internet attacks. CIDS also help to cope with classical problems of Intrusion Detection Systems (IDS) such as zero-day attacks, high false alarm rates and architectural challenges, e. g., centralized designs exposing the Single-Point-of-Failure. Improved complexity on the other hand gives raise to new exploitation opportunities for adversaries. The contribution of this paper is twofold. We first investigate related research on CIDS to identify the common building blocks and to understand vulnerabilities of the Collaborative Intrusion Detection Framework (CIDF). Second, we focus on the problem of anonymity preservation in a decentralized intrusion detection related message exchange scheme. We use techniques from design theory to provide multi-path peer-to-peer communication scheme where the adversary can not perform better than guessing randomly the originator of an alert message.
Resumo:
In 2003, the Green Building Council of Australia (GBCA) launched their Green Star rating tools for various types of buildings in order to promote green building practice in Australia. Of these, the Green Star-Office Interior rating tool is designed for building owners, tenants and interior designers to assess the environmental impact of an interior fitout. It covers a number of categories, including Management, Indoor Environment Quality, Energy, Transport, Water, Materials, Land Use and Ecology, Emissions, and Innovation. This paper reviews the usage of the Green Star system in Australian office tenancy fitouts and the potential challenges associated with Green Star-Office Interior implementation. This involves the analysis of score sheets of 66 office interior projects across Australia that achieved Green Star certification. The percentage of green star points obtained within each category and sub-categories (credits) for each project are investigated to illustrate the achievement of credits. The results show that Emission-related credits and Innovation related credits are the easiest and most difficult respectively to obtain. It is also found that 6 Green Star office interior projects perform especially better in the categories of Energy and Ecology than 4 and 5 Star projects. The investigation of point frequency in each category provides prospective Green Star applicants with insights into credit achievement for future projects.
Resumo:
In this paper, the initial stage of films assembled by energetic C36 fullerenes on diamond (001)–(2 × 1) surface at low-temperature was investigated by molecular dynamics simulation using the Brenner potential. The incident energy was first uniformly distributed within an energy interval 20–50 eV, which was known to be the optimum energy range for chemisorption of single C36 on diamond (001) surface. More than one hundred C36 cages were impacted one after the other onto the diamond surface by randomly selecting their orientation as well as the impact position relative to the surface. The growth of films was found to be in three-dimensional island mode, where the deposited C36 acted as building blocks. The study of film morphology shows that it retains the structure of a free C36 cage, which is consistent with Low Energy Cluster Beam Deposition (LECBD) experiments. The adlayer is composed of many C36-monomers as well as the covalently bonded C36 dimers and trimers which is quite different from that of C20 fullerene-assembled film, where a big polymerlike chain was observed due to the stronger interaction between C20 cages. In addition, the chemisorption probability of C36 fullerenes is decreased with increasing coverage because the interaction between these clusters is weaker than that between the cluster and the surface. When the incident energy is increased to 40–65 eV, the chemisorption probability is found to increased and more dimers and trimers as well as polymerlike-C36 were observed on the deposited films. Furthermore, C36 film also showed high thermal stability even when the temperature was raised to 1500 K.
Resumo:
The use of online tools to support teaching and learning is now commonplace within educational institutions, with many of these institutions mandating or strongly encouraging the use of a blended learning approach to teaching and learning. Consequently, these institutions generally adopt a learning management system (LMS), with a fixed set of collaborative tools, in the belief that effective teaching and learning approaches will be used, to allow students to build knowledge. While some studies into the use of an LMS’s still identify continued didactic approaches to teaching and learning, the focus of this paper is on the ability of collaborative tools such as discussion forums, to build knowledge. In the context of science education, argumentation is touted as playing an important role in this process of knowledge building. However, there is limited research into argumentation in other domains using online discussion and a blended learning approach. This paper describes a study, using design research, which adapts a framework for argumentation that can be applied to other domains. In particular it will focus on an adapted social argumentation schema to identify argument in a discussion forum of N=16 participants in a secondary High School.
Resumo:
The literature concerning firm boundaries has focussed extensively on the rationale for different boundary choices and the economic efficiencies that such choices can make. There is also an acknowledged position that a firm’s boundary choices may impact the ability of a firm to maintain and even build new capabilities, though such choices may not be optimal from an economic efficiency perspective. It is in this context that we seek to investigate how firms make this potential trade-off in respect of their boundary choices and how these choices are implemented across a wide range of activities. Using qualitative data from three public sector construction oriented organizations, we observe that neither pure make nor buy decisions assisted significantly in capability building. Dual modes – where firms make and buy the same product or service simultaneously – provided firms with some opportunities to manage this paradox, but the most successful decisions seemed to occur in respect of using intermediate governance modes such as alliances. We also observed that the boundary choice was just one dimension of the capability building process and firms pursuing the same boundary choice decisions often had quite divergent outcomes on the basis of their boundary management and the ability of knowledge to move across firm boundaries.
Resumo:
Technological advances have led to an influx of affordable hardware that supports sensing, computation and communication. This hardware is increasingly deployed in public and private spaces, tracking and aggregating a wealth of real-time environmental data. Although these technologies are the focus of several research areas, there is a lack of research dealing with the problem of making these capabilities accessible to everyday users. This thesis represents a first step towards developing systems that will allow users to leverage the available infrastructure and create custom tailored solutions. It explores how this notion can be utilized in the context of energy monitoring to improve conventional approaches. The project adopted a user-centered design process to inform the development of a flexible system for real-time data stream composition and visualization. This system features an extensible architecture and defines a unified API for heterogeneous data streams. Rather than displaying the data in a predetermined fashion, it makes this information available as building blocks that can be combined and shared. It is based on the insight that individual users have diverse information needs and presentation preferences. Therefore, it allows users to compose rich information displays, incorporating personally relevant data from an extensive information ecosystem. The prototype was evaluated in an exploratory study to observe its natural use in a real-world setting, gathering empirical usage statistics and conducting semi-structured interviews. The results show that a high degree of customization does not warrant sustained usage. Other factors were identified, yielding recommendations for increasing the impact on energy consumption.
Resumo:
Joint venture design teams are formed to combine resources and expertise in order to secure multi-discipline engineering design services on major projects. Bringing together resources from two ordinarily competing companies to form one joint team is however challenging as each parent company brings to the project its own organisational culture, processes and team attitudes. This study examined the factors that impact on forming a successful joint venture project team. Three critical areas were identified from an extensive literature review; Joint Venture Arrangements, Parent Companies and Forming the Team; and a survey was conducted with professionals who have worked in joint venture project teams in the Australian building industry in order to identify factors that affected successful joint venture team formation, and the common lessons learnt. This study reinforced the importance of three key criteria - trust, commitment and compatibility - for partner alignment. The results also identified four key lessons learnt which included; selecting the right resources, enabling a collaborative working environment by way of project office, implementing an independent Joint Venture Manager, and allocating work which is best for project with fees reflecting risk where risk is disproportionate.