823 resultados para Accident risk forecasting.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study aimed to determine whether two brief, low cost interventions would reduce young drivers’ optimism bias for their driving skills and accident risk perceptions. This tendency for such drivers to perceive themselves as more skilful and less prone to driving accidents than their peers may lead to less engagement in precautionary driving behaviours and a greater engagement in more dangerous driving behaviour. 243 young drivers (aged 17 - 25 years) were randomly allocated to one of three groups: accountability, insight or control. All participants provided both overall and specific situation ratings of their driving skills and accident risk relative to a typical young driver. Prior to completing the questionnaire, those in the accountability condition were first advised that their driving skills and accident risk would be later assessed via a driving simulator. Those in the insight condition first underwent a difficult computer-based hazard perception task designed to provide participants with insight into their potential limitations when responding to hazards in difficult and unpredictable driving situations. Participants in the control condition completed only the questionnaire. Results showed that the accountability manipulation was effective in reducing optimism bias in terms of participants’ comparative ratings of their accident risk in specific situations, though only for less experienced drivers. In contrast, among more experienced males, participants in the insight condition showed greater optimism bias for overall accident risk than their counterparts in the accountability or control groups. There were no effects of the manipulations on drivers’ skills ratings. The differential effects of the two types of manipulations on optimism bias relating to one’s accident risk in different subgroups of the young driver sample highlight the importance of targeting interventions for different levels of experience. Accountability interventions may be beneficial for less experienced young drivers but the results suggest exercising caution with the use of insight type interventions, particularly hazard perception style tasks, for more experienced young drivers typically still in the provisional stage of graduated licensing systems.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The study presented in this paper reviewed 9,358 accidents which occurred in the U.S. construction industry between 2002 and 2011, in order to understand the relationships between the risk factors and injury severity (e.g. fatalities, hospitalized injuries, or non-hospitalized injuries) and to develop a strategic prevention plan to reduce the likelihood of fatalities where an accident is unavoidable. The study specifically aims to: (1) verify the relationships among risk factors, accident types, and injury severity, (2) determine significant risk factors associated with each accident type that are highly correlated to injury severity, and (3) analyze the impact of the identified key factors on accident and fatality occurrence. The analysis results explained that safety managers’ roles are critical to reducing human-related risks—particularly misjudgement of hazardous situations—through safety training and education, appropriate use of safety devices and proper safety inspection. However, for environment-related factors, the dominant risk factors were different depending on the different accident types. The outcomes of this study will assist safety managers to understand the nature of construction accidents and plan for strategic risk mitigation by prioritizing high frequency risk factors to effectively control accident occurrence and manage the likelihood of fatal injuries on construction sites.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many drivers and non-cyclists perceive cycling as an extremely risky activity with women in particular being concerned about the risk of injury. The low rates of cycling participation by women pose a threat to the achievement of government targets for cycling participation and restrict the potential transport, health and environmental benefits that increased levels of cycling could provide. This study seeks to extend earlier research in gender and cycling by comparing the risks perceived by female and male cyclists and drivers in specific on-road situations while accounting for other potentially gender-related factors such as travel patterns and experience, perceived skill, and risk taking behaviors. In an online survey, 444 regular cyclists and 151 (non-cyclist) car drivers rated the level of risk in six situations: Failing to yield; Going through a red light; Not signaling when turning; Swerving; Tailgating; and Not checking traffic. The study found that the higher levels of risk perceived by women are not completely accounted for by differences in cycling patterns or perceptions of skill. Compared to their male counterparts, female cyclists and car drivers had similarly elevated perceptions of risk suggesting that these gender differences are not specific to cycling, but reflect wider differences in risk perception. Not all of the gender differences were consistent across cyclists and drivers. Higher levels of perceived skill were evident for male cyclists but not for male car drivers. Further research is needed to explore the robustness and interpretation of this finding.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Airports worldwide represent key forms of critical infrastructure in addition to serving as nodes in the international aviation network. While the continued operation of airports is critical to the functioning of reliable air passenger and freight transportation, these infrastructure systems face a number of sources of disturbance that threaten their operational viability. Recent examples of high magnitude events include the eruption of Iceland’s Eyjafjallajokull volcano eruption (Folattau and Schofield 2010), the failure of multiple systems at the opening of Heathrow’s Terminal 5 (Brady and Davies 2010) and the Glasgow airport 2007 terrorist attack (Crichton 2008). While these newsworthy events do occur, a multitude of lower-level more common disturbances also have the potential to cause significant discontinuity to airport operations. Regional airports face a unique set of challenges, particularly in a nation like Australia where they serve to link otherwise remote and isolated communities to metropolitan hubs (Wheeler 2005), often without the resources and political attention received by larger capital city airports. This paper discusses conceptual relationships between Business Continuity Management (BCM) and High Reliability Theory, and proposes BCM as an appropriate risk-based management process to ensure continued airport operation in the face of uncertainty. In addition, it argues that that correctly implemented BCM can lead to highly reliable organisations. This is framed within the broader context of critical infrastructures and the need for adequate crisis management approaches suited to their unique requirements (Boin and McConnell 2007).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article examines the importance of accurate classification and identification of risk with particular reference to the problem of adverse selection. It is argued that, historically, this concern was the paramount consideration influencing standard form contract formation and disclosure laws. The scope of its relevance today however is less apparent in that contemporary insurance contracting is conducted in a vastly different environment from that which prevailed at the time Lloyd's was better known as a coffee house. Accordingly, the second part of this article looks at the contemporary framework of information disclosure and those dynamics within it designed to elicit information weighing on risk forecasting : specifically, (a) direct inquiry and testing requirements; (b) signaling - or incentive based structuring of insurance contractual and (c) bargaining in the shadow of the utmost good faith doctrine. Finally, certain conclusions arising out of contemporary and historical economic considerations underpinning disclosure in insurance law are outlined.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Open pit mine operations are complex businesses that demand a constant assessment of risk. This is because the value of a mine project is typically influenced by many underlying economic and physical uncertainties, such as metal prices, metal grades, costs, schedules, quantities, and environmental issues, among others, which are not known with much certainty at the beginning of the project. Hence, mining projects present a considerable challenge to those involved in associated investment decisions, such as the owners of the mine and other stakeholders. In general terms, when an option exists to acquire a new or operating mining project, , the owners and stock holders of the mine project need to know the value of the mining project, which is the fundamental criterion for making final decisions about going ahead with the venture capital. However, obtaining the mine project’s value is not an easy task. The reason for this is that sophisticated valuation and mine optimisation techniques, which combine advanced theories in geostatistics, statistics, engineering, economics and finance, among others, need to be used by the mine analyst or mine planner in order to assess and quantify the existing uncertainty and, consequently, the risk involved in the project investment. Furthermore, current valuation and mine optimisation techniques do not complement each other. That is valuation techniques based on real options (RO) analysis assume an expected (constant) metal grade and ore tonnage during a specified period, while mine optimisation (MO) techniques assume expected (constant) metal prices and mining costs. These assumptions are not totally correct since both sources of uncertainty—that of the orebody (metal grade and reserves of mineral), and that about the future behaviour of metal prices and mining costs—are the ones that have great impact on the value of any mining project. Consequently, the key objective of this thesis is twofold. The first objective consists of analysing and understanding the main sources of uncertainty in an open pit mining project, such as the orebody (in situ metal grade), mining costs and metal price uncertainties, and their effect on the final project value. The second objective consists of breaking down the wall of isolation between economic valuation and mine optimisation techniques in order to generate a novel open pit mine evaluation framework called the ―Integrated Valuation / Optimisation Framework (IVOF)‖. One important characteristic of this new framework is that it incorporates the RO and MO valuation techniques into a single integrated process that quantifies and describes uncertainty and risk in a mine project evaluation process, giving a more realistic estimate of the project’s value. To achieve this, novel and advanced engineering and econometric methods are used to integrate financial and geological uncertainty into dynamic risk forecasting measures. The proposed mine valuation/optimisation technique is then applied to a real gold disseminated open pit mine deposit to estimate its value in the face of orebody, mining costs and metal price uncertainties.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this thesis we are interested in financial risk and the instrument we want to use is Value-at-Risk (VaR). VaR is the maximum loss over a given period of time at a given confidence level. Many definitions of VaR exist and some will be introduced throughout this thesis. There two main ways to measure risk and VaR: through volatility and through percentiles. Large volatility in financial returns implies greater probability of large losses, but also larger probability of large profits. Percentiles describe tail behaviour. The estimation of VaR is a complex task. It is important to know the main characteristics of financial data to choose the best model. The existing literature is very wide, maybe controversial, but helpful in drawing a picture of the problem. It is commonly recognised that financial data are characterised by heavy tails, time-varying volatility, asymmetric response to bad and good news, and skewness. Ignoring any of these features can lead to underestimating VaR with a possible ultimate consequence being the default of the protagonist (firm, bank or investor). In recent years, skewness has attracted special attention. An open problem is the detection and modelling of time-varying skewness. Is skewness constant or there is some significant variability which in turn can affect the estimation of VaR? This thesis aims to answer this question and to open the way to a new approach to model simultaneously time-varying volatility (conditional variance) and skewness. The new tools are modifications of the Generalised Lambda Distributions (GLDs). They are four-parameter distributions, which allow the first four moments to be modelled nearly independently: in particular we are interested in what we will call para-moments, i.e., mean, variance, skewness and kurtosis. The GLDs will be used in two different ways. Firstly, semi-parametrically, we consider a moving window to estimate the parameters and calculate the percentiles of the GLDs. Secondly, parametrically, we attempt to extend the GLDs to include time-varying dependence in the parameters. We used the local linear regression to estimate semi-parametrically conditional mean and conditional variance. The method is not efficient enough to capture all the dependence structure in the three indices —ASX 200, S&P 500 and FT 30—, however it provides an idea of the DGP underlying the process and helps choosing a good technique to model the data. We find that GLDs suggest that moments up to the fourth order do not always exist, there existence appears to vary over time. This is a very important finding, considering that past papers (see for example Bali et al., 2008; Hashmi and Tay, 2007; Lanne and Pentti, 2007) modelled time-varying skewness, implicitly assuming the existence of the third moment. However, the GLDs suggest that mean, variance, skewness and in general the conditional distribution vary over time, as already suggested by the existing literature. The GLDs give good results in estimating VaR on three real indices, ASX 200, S&P 500 and FT 30, with results very similar to the results provided by historical simulation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Safety-compromising accidents occur regularly in the led outdoor activity domain. Formal accident analysis is an accepted means of understanding such events and improving safety. Despite this, there remains no universally accepted framework for collecting and analysing accident data in the led outdoor activity domain. This article presents an application of Rasmussen's risk management framework to the analysis of the Lyme Bay sea canoeing incident. This involved the development of an Accimap, the outputs of which were used to evaluate seven predictions made by the framework. The Accimap output was also compared to an analysis using an existing model from the led outdoor activity domain. In conclusion, the Accimap output was found to be more comprehensive and supported all seven of the risk management framework's predictions, suggesting that it shows promise as a theoretically underpinned approach for analysing, and learning from, accidents in the led outdoor activity domain.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

One major gap in transportation system safety management is the ability to assess the safety ramifications of design changes for both new road projects and modifications to existing roads. To fulfill this need, FHWA and its many partners are developing a safety forecasting tool, the Interactive Highway Safety Design Model (IHSDM). The tool will be used by roadway design engineers, safety analysts, and planners throughout the United States. As such, the statistical models embedded in IHSDM will need to be able to forecast safety impacts under a wide range of roadway configurations and environmental conditions for a wide range of driver populations and will need to be able to capture elements of driving risk across states. One of the IHSDM algorithms developed by FHWA and its contractors is for forecasting accidents on rural road segments and rural intersections. The methodological approach is to use predictive models for specific base conditions, with traffic volume information as the sole explanatory variable for crashes, and then to apply regional or state calibration factors and accident modification factors (AMFs) to estimate the impact on accidents of geometric characteristics that differ from the base model conditions. In the majority of past approaches, AMFs are derived from parameter estimates associated with the explanatory variables. A recent study for FHWA used a multistate database to examine in detail the use of the algorithm with the base model-AMF approach and explored alternative base model forms as well as the use of full models that included nontraffic-related variables and other approaches to estimate AMFs. That research effort is reported. The results support the IHSDM methodology.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

BACKGROUND Mosquito-borne diseases are climate sensitive and there has been increasing concern over the impact of climate change on future disease risk. This paper projected the potential future risk of Barmah Forest virus (BFV) disease under climate change scenarios in Queensland, Australia. METHODS/PRINCIPAL FINDINGS We obtained data on notified BFV cases, climate (maximum and minimum temperature and rainfall), socio-economic and tidal conditions for current period 2000-2008 for coastal regions in Queensland. Grid-data on future climate projections for 2025, 2050 and 2100 were also obtained. Logistic regression models were built to forecast the otential risk of BFV disease distribution under existing climatic, socio-economic and tidal conditions. The model was applied to estimate the potential geographic distribution of BFV outbreaks under climate change scenarios. The predictive model had good model accuracy, sensitivity and specificity. Maps on potential risk of future BFV disease indicated that disease would vary significantly across coastal regions in Queensland by 2100 due to marked differences in future rainfall and temperature projections. CONCLUSIONS/SIGNIFICANCE We conclude that the results of this study demonstrate that the future risk of BFV disease would vary across coastal regions in Queensland. These results may be helpful for public health decision making towards developing effective risk management strategies for BFV disease control and prevention programs in Queensland.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: Injury is the leading cause of mortality for young people in Australia (AIHW, 2008). Adolescent injury mortality is consistently associated with risk taking behaviour, including transport and interpersonal violence (AIHW, 2003), which often occurs in the context of alcohol and other substance use. A rapid increase in risk taking and injury through early to late adolescence highlights the need for effective school based interventions. Aim: The aim of the current research was to examine the relationship between school connectedness and adolescent risk and injury, in order to inform effective prevention approaches. School connectedness, or students’ feelings of belongingness to school, has been shown to be a critical protective factor in adolescence which can be targeted effectively through teacher interventions. Despite evidence linking low school connectedness with increased health risk behaviour, including substance use and violence, research has not yet addressed possible links between connectedness and a broader range of risk taking behaviours (e.g. transport risks) or injury. Method: This study involved background data collection to inform the development of an intervention. A total of 595 Year 9 students (aged 13-14 years) from 5 Southeast Queensland high schools completed questionnaires that included measures of school connectedness, risk taking behaviour, alcohol and other substance use, and injuries. Results: Increased school connectedness was found to be associated with fewer transport risk behaviours and with decreased alcohol and other substance use for both males and females. Similarly, increased school connectedness was associated with fewer passenger and motorcycle injuries for male participants. Both males and females with increased school connectedness reported fewer alcohol related injuries. Implications: These results indicate that school connectedness appears to have protective effects for early adolescence. These findings may also hold for older adolescents and indicate that it may be an important factor to target in school based risk and injury prevention programs. A school connectedness intervention is currently being designed, focusing on teacher professional development. The intervention will be implemented in conjunction with a curriculum based injury prevention program for Year 9 students and will be evaluated through a large scale cluster randomised trial involving 26 schools.