12 resultados para service level management
em Universidade do Minho
Resumo:
This paper presents a proposal for a management model based on reliability requirements concerning Cloud Computing (CC). The proposal was based on a literature review focused on the problems, challenges and underway studies related to the safety and reliability of Information Systems (IS) in this technological environment. This literature review examined the existing obstacles and challenges from the point of view of respected authors on the subject. The main issues are addressed and structured as a model, called "Trust Model for Cloud Computing environment". This is a proactive proposal that purposes to organize and discuss management solutions for the CC environment, aiming improved reliability of the IS applications operation, for both providers and their customers. On the other hand and central to trust, one of the CC challenges is the development of models for mutual audit management agreements, so that a formal relationship can be established involving the relevant legal responsibilities. To establish and control the appropriate contractual requirements, it is necessary to adopt technologies that can collect the data needed to inform risk decisions, such as access usage, security controls, location and other references related to the use of the service. In this process, the cloud service providers and consumers themselves must have metrics and controls to support cloud-use management in compliance with the SLAs agreed between the parties. The organization of these studies and its dissemination in the market as a conceptual model that is able to establish parameters to regulate a reliable relation between provider and user of IT services in CC environment is an interesting instrument to guide providers, developers and users in order to provide services and secure and reliable applications.
Resumo:
Maturity models are adopted to minimise our complexity perception over a truly complex phenomenon. In this sense, maturity models are tools that enable the assessment of the most relevant variables that impact on the outputs of a specific system. Ideally a maturity model should provide information concerning the qualitative and quantitative relationships between variables and how they affect the latent variable, that is, the maturity level. Management systems (MSs) are implemented worldwide and by an increasing number of companies. Integrated management systems (IMSs) consider the implementation of one or several MSs usually coexisting with the quality management subsystem (QMS). It is intended in this chapter to report a model based on two components that enables the assessment of the IMS maturity, considering the key process agents (KPAs) identified through a systematic literature review and the results collected from two surveys.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão Industrial
Resumo:
A Zero waste management is believed to be one of methods to gain sustainability in urban areas. Take advantages of resources as enough as the needs and process it until the last part to be wasted is a contribution to take care the environment for the next generation. Reduce, reuse, and recycle are three simplesactivities which are until nowadays consideredas the back bone of zero waste. Jonggolgreen city is a new urban area in Indonesia with a 100 ha of surface area zoned as education tourism area. It is an independent area with pure natural resources of water, air, and land to be managed and protected. It is planned as green city through zero waste management since2013. In this preliminary period, a monitoring tool is being prepared by applying a Life Cycle Analysis (LCA) for urban areas [1]. This paper will present an explanatory assessment ofthe zero waste management for Jonggolgreen city. The existing situation will be examined through LCA and afterwards,the new program and the proposed green design to gain the next level of zero waste will be discussed. The purpose is to track the persistence of the commitment and the perception of the necessary innovationsin order to achieve the ideal behavior level of LCA.
Resumo:
Peer-to-Peer (P2P) is nowadays a widely used paradigm underpinning the deployment of several Internet services and applications. However, the management of P2P traffic aggregates is not an easy task for Internet Service Providers (ISPs). In this perspective, and considering an expectable proliferation in the use of such ap- plications, future networks require the development of smart mechanisms fostering an easier coexistence between P2P applications and ISP infrastructures. This paper aims to contribute for such research efforts presenting a framework incorporating useful mechanisms to be activated by network administrators, being also able to operate as an automated management tool dealing with P2P traffic aggregates.
Resumo:
This article compiles the main topics addressed by management systems (MSs) literature concerningMSs integration by performing a systematic literature review. In this paper, it is intended to present themain limitations of non-integratedmanagement systems (IMSs), the main motivations driving an IMS implementation, the major resistances faced, the most common resultant benefits, the suitable guidelines and standards and the critical success factors. In addition, this paper addresses the issues concerning integration strategies and models, the integration levels or degrees achieved by an IMS and the audit function in an integrated context. The motivations that drive companies to integrate their management subsystems, the obstacles faced and the benefits collected may have internal or external origins. The publishing of standards guiding companies on how to integrate their management subsystems has been done mainly at a national level. There are several models that could be used in order to support companies in their management subsystems integration processes, and a sequential or an all-in strategy may be adopted. Four audit typologies can be distinguished, and the adoption of any of these typologies should consider resource availability and audit team know-how, among other features.
Resumo:
PhD thesis in Educational Sciences (specialization in Politics of Education).
Resumo:
Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.
Resumo:
This study focuses on the granite mountain known as Monte Pindo (627 m above sea level) in the Autonomous Community of Galicia (NW Spain). This territory is included in the area classified as “Costa da Morte” in the “Politica de Ordenación Litoral” (POL) (Coastal Planning Policy) for the region of Galicia. This coastal unit, located between “Rías Baixas” and “Cape Fisterra” has great potential for demonstrating geological processes and its geomorphological heritage is characterized by a high degree of geodiversity of granite landforms. The main objective of our work is to assess the geomorphological heritage of the site, thus revealing its wide geodiversity. We shall analyze and highlight: its scientific value, developing an inventory of granite landforms; its educational valuel and its geotouristic potential. It must be ensured that the Administration understands that natural diversity is composed of both geodiversity and biodiversity. Only then will the sustainable management of Monte Pindo become possible by integrating natural and cultural heritage values. The goal is to ensure that Monte Pindo and its immediate surroundings become a geopark with the aim of promoting local development projects based on the conservation and valorization of its geological heritage.
Resumo:
Dissertação de mestrado em Engenharia de Sistemas
Resumo:
Dissertação de mestrado em Engenharia Industrial