8 resultados para Strategic cost management
em Universidade do Minho
Resumo:
Dissertação de mestrado em Comunicação, Arte e Cultura
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
Security risk management is by definition, a subjective and complex exercise and it takes time to perform properly. Human resources are fundamental assets for any organization, and as any other asset, they have inherent vulnerabilities that need to be handled, i.e. managed and assessed. However, the nature that characterize the human behavior and the organizational environment where they develop their work turn these task extremely difficult, hard to accomplish and prone to errors. Assuming security as a cost, organizations are usually focused on the efficiency of the security mechanisms implemented that enable them to protect against external attacks, disregarding the insider risks, which are much more difficult to assess. All these demands an interdisciplinary approach in order to combine technical solutions with psychology approaches in order to understand the organizational staff and detect any changes in their behaviors and characteristics. This paper intends to discuss some methodological challenges to evaluate the insider threats and its impacts, and integrate them in a security risk framework, that was defined according to the security standard ISO/IEC_JTC1, to support the security risk management process.
Resumo:
Tese de Doutoramento - Programa Doutoral em Engenharia Industrial e Sistemas (PDEIS)
Resumo:
This paper presents part of a study aimed at finding a suitable, yet cost-effective, surface finish for a steel structure subject to the car washing environment and corrosive chemicals. The initial, life cycle and average equivalent annual (AEAC) costs for surface finishing methods were calculated for a steel structure using the LCCC algorithm developed by American Galvanizers Association (AGA). The cost study consisted of 45 common surface finish systems including: hot-dip galvanization (HDG), metallization, acrylic, alkyd and epoxy as well as duplex coatings such as epoxy zinc and inorganic zinc (IOZ). The results show that initial, life cycle and AEAC costs for hot dip galvanization are the lowest among all the other methods, followed by coal tar epoxy painting. The annual average cost of HDG for this structure was estimated about €0.22/m2, while the other cost-effective alternatives were: IOZ, polyurea, epoxy waterborne and IOZ/epoxy duplex coating.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação