23 resultados para Political project

em Universidade do Minho


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Tese de Doutoramento em Ciências da Educação - Especialidade de Desenvolvimento Curricular

Relevância:

30.00% 30.00%

Publicador:

Resumo:

\The idea that social processes develop in a cyclical manner is somewhat like a `Lorelei'. Researchers are lured to it because of its theoretical promise, only to become entangled in (if not wrecked by) messy problems of empirical inference. The reasoning leading to hypotheses of some kind of cycle is often elegant enough, yet the data from repeated observations rarely display the supposed cyclical pattern. (...) In addition, various `schools' seem to exist which frequently arrive at di erent conclusions on the basis of the same data." (van der Eijk and Weber 1987:271). Much of the empirical controversies around these issues arise because of three distinct problems: the coexistence of cycles of di erent periodicities, the possibility of transient cycles and the existence of cycles without xed periodicity. In some cases, there are no reasons to expect any of these phenomena to be relevant. Seasonality caused by Christmas is one such example (Wen 2002). In such cases, researchers mostly rely on spectral analysis and Auto-Regressive Moving-Average (ARMA) models to estimate the periodicity of cycles.1 However, and this is particularly true in social sciences, sometimes there are good theoretical reasons to expect irregular cycles. In such cases, \the identi cation of periodic movement in something like the vote is a daunting task all by itself. When a pendulum swings with an irregular beat (frequency), and the extent of the swing (amplitude) is not constant, mathematical functions like sine-waves are of no use."(Lebo and Norpoth 2007:73) In the past, this di culty has led to two di erent approaches. On the one hand, some researchers dismissed these methods altogether, relying on informal alternatives that do not meet rigorous standards of statistical inference. Goldstein (1985 and 1988), studying the severity of Great power wars is one such example. On the other hand, there are authors who transfer the assumptions of spectral analysis (and ARMA models) into fundamental assumptions about the nature of social phenomena. This type of argument was produced by Beck (1991) who, in a reply to Goldstein (1988), claimed that only \ xed period models are meaningful models of cyclic phenomena".We argue that wavelet analysis|a mathematical framework developed in the mid-1980s (Grossman and Morlet 1984; Goupillaud et al. 1984) | is a very viable alternative to study cycles in political time-series. It has the advantage of staying close to the frequency domain approach of spectral analysis while addressing its main limitations. Its principal contribution comes from estimating the spectral characteristics of a time-series as a function of time, thus revealing how its di erent periodic components may change over time. The rest of article proceeds as follows. In the section \Time-frequency Analysis", we study in some detail the continuous wavelet transform and compare its time-frequency properties with the more standard tool for that purpose, the windowed Fourier transform. In the section \The British Political Pendulum", we apply wavelet analysis to essentially the same data analyzed by Lebo and Norpoth (2007) and Merrill, Grofman and Brunell (2011) and try to provide a more nuanced answer to the same question discussed by these authors: do British electoral politics exhibit cycles? Finally, in the last section, we present a concise list of future directions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O objetivo deste trabalho é apresentar os resultados da análise das concepções de dois protagonistas de uma reforma curricular que está sendo implementada numa escola de engenharia. A principal característica do novo currículo é o uso de projetos e oficinas como atividades complementares a serem realizadas pelos estudantes. As atividades complementares acontecerão em paralelo ao trabalho realizado nas disciplinas sem que haja uma relação de interdisciplinaridade. O novo currículo está sendo implantado desde fevereiro de 2015. Segundo Pacheco (2005) há dois momentos, dentre outros, no processo de mudança curricular, o currículo “ideal”, determinado por dimensões epistemológica, política, econômica, ideológica, técnica, estética, e histórica e, que recebe influência direta daquele que idealiza e cria o novo currículo e, o currículo “formal” que se traduz na prática implementada na escola. São essas duas etapas estudadas nesta pesquisa. Para isso serão considerados como fontes de dados dois protagonistas, um mais ligado à concepção do currículo e outro da sua implementação, a partir dos quais se busca compreender as motivações, crenças e percepções que, por sua vez, determinam a reforma curricular. Entrevistas semiestruturadas foram utilizadas como técnica de pesquisa, com o propósito de se entender a gênese da proposta e as mudanças entre essas duas etapas. Os dados revelam que mudanças aconteceram desde a idealização até a formalização do currículo, motivadas por demandas do processo de implementação, revela ainda diferenças na visão de currículo e a motivação para romper com padrões na formação de engenheiros no Brasil.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In 2008, the XVII Portuguese Constitutional Government launched the ‘e.escolinha’ programme, within the Technological Plan for Education, which set out the distribution of a computer, called ‘Magalhães’, designed for chil-dren attending the 1st cycle of basic education. Suspended in 2011 by the XIX Government, this programme has allowed, however, almost 500 000 children to have access to a personal computer. It was expected that this political measure would “revolutionise” the national education system by bringing changes to the pedagogical practices of teachers and the learning processes of children and by achieving educational success, in general. Based on documental analysis and on a set of interviews with key decision-makers in conceiving, implementing and monitoring this governmental initiative, the fi rst part of this chapter presents and analyses the ‘e.escolinha’ initiative and the policies be-hind that governmental programme, seeking to disassemble those objectives and provide some insights into the relationship between discourses, rhetoric, and reality. After that, the chapter focuses on children’s uses and practices with the ‘Magalhães’ laptop, at school and at home. Based on the results of questionnaires fi lled in by approximately 1500 children from 32 First Cycle public schools of the municipality of Braga (north of Portugal) and also from questionnaires applied to their parents and teachers, this chapter intends to analyse the real impact of this initiative for children, family and school. It also seeks to discuss the contribution of this educational policy to children’s digital literacy and also to their own and their families’ social and digital inclusion. To understand if it represented an added value to teachers’ pedagogical practice is another of its aims. The fi ndings point out a major focus on technology and access rather than on uses and competences or even on social, educational and cultural change. In fact, a major conclusion is the existence of a strong gap between the policy and the practices, typical of a top-down policy design. This study is an integrant part of a research project titled “Navigating with ‘Magalhães’: Study on the Impact of Digital Media in Schoolchildren” conducted at the University of Minho, Portugal, financed by the Portuguese Foundation for Science and Technology [PTDC/CCI-COM/101381/2008] and co-funded by the European Regional Development Fund [COMPETE: FCOMP-01-0124-FEDER-009056].

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since concrete is the most widely utilized construction material, several solutions are currently being developed and investigated for enhancing the sustainability of cementitious materials. One of these solutions is based on producing Recycled Concrete Aggregates (RCA) from existing concrete members resulting by either industrial processes or demolitions of existing structures as a whole. Moreover, waste resulting from industrial processes other than the building construction (i.e., tire recycling, production of steel, powders resulting from other depuration processes) are also being considered as possible low-impact constituents for producing structural concrete and Fiber-Reinforced Cementitious Composites (FRCC). Furthermore, the use of natural fibers is another option for producing environmentally-friendly and cost-effective materials, depending on the local availability of raw materials. To promote the use of concretes partially composed of recycled constituents, their influence on the mechanical and durability performance of these concretes have to be deeply investigated and correlated. This was the main goal of the EnCoRe Project (www.encore-fp7.unisa.it), a EU-funded initiative, whose activities and main findings are summarized in this paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de Doutoramento em Estudos da Criança (área de especialização em Educação Musical)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The International Energy Agency established an Implementing Agreement within the Energy in Buildings and Communities Program to undertake research and provide an international focus on Cost Effective Energy and Carbon Emissions Optimization in Building Renovation (EBC Annex 56). The project aims at developing a new methodology to enable cost effective renovation of existing buildings while optimizing energy consumption and carbon emissions reduction. Gathering of case studies is one of the activities undertaken to reach the overall project. Of the case studies a selection of â Shining Examplesâ is made to encourage decision makers to promote efficient and cost effective renovations. This paper presents the results of the analyses made on the Shining Examples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tese de Doutoramento em Estudos da Criança (área de especialização em Educação Musical).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Increasing the maturity in Project Management (PM) has become a goal for many organizations, leading them to adopt maturity models to assess the current state of its PM practices and compare them with the best practices in the industry where the organization is inserted. One of the main PM maturity models is the Organizational Project Management Maturity Model (OPM3®), developed by the Project Management Institute. This paper presents the Information Systems and Technologies organizations outcome analysis, of the assesses made by the OPM3® Portugal Project, identifying the PM processes that are “best” implemented in this particular industry and those in which it is urgent to improve. Additionally, a comparison between the different organizations’ size analyzed is presented.