6 resultados para Enterprise Resources Planning ERP
em Universidade do Minho
Resumo:
Dissertação de mestrado em Engenharia de Sistemas
Resumo:
Tese de Doutoramento em Tecnologias e Sistemas de Informação
Resumo:
Due to water scarcity, it is important to organize and regulate water resources utilization to satisfy the conflicting water demands and needs. This paper aims to describe a comprehensive methodology for managing the water sector of a defined urbanized region, using the robust capabilities of a Geographic Information System (GIS). The proposed methodology is based on finding alternatives to cover the gap between recent supplies and future demands. Nablus which is a main governorate located in the north of West Bank, Palestine, was selected as case study because this area is classified as arid to semi-arid area. In fact, GIS integrates hardware, software, and data for capturing, managing, analyzing, and displaying all forms of geographic information. The resulted plan of Nablus represents an example of the proposed methodology implementation and a valid framework for the elaboration of a water master plan.
Resumo:
Tese de Doutoramento - Programa Doutoral em Engenharia Industrial e Sistemas (PDEIS)
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
Dissertação de mestrado integrado em Engenharia Civil