Resumo:
This paper aims to describe the Sequential Excavation Method, used for excava-tion in underground works, as well as the related risks and preventive measures. This method has characteristics that differentiate it from other tunnelling techniques: it uses a larger number of workers and equipment; it has a high concurrency of tasks with various workers and equip-ment quite exposed to hazards; and it uses many potentially aggressive chemicals. Firstly, it is given a broad overview of this issue. Afterwards, it will be presented the results of a survey to a sample of experienced technicians, aimed at gauging the relevance of a set of guidelines relat-ing to the design and work phases, applicable to the domestic market and prepared following technical visits to works abroad.
Resumo:
Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs and duration of earthworks in infrastructure construction, the optimal usage of every resource in these tasks is paramount. Considering the characteristics of an earthwork construction, it can be looked at as a production line based on resources (mechanical equipment) and dependency relations between sequential tasks, hence being susceptible to optimization. Up to the present, the steady development of Information Technology areas, such as databases, artificial intelligence and operations research, has resulted in the emergence of several technologies with potential application bearing that purpose in mind. Among these, modern optimization methods (also known as metaheuristics), such as evolutionary computation, have the potential to find high quality optimal solutions with a reasonable use of computational resources. In this context, this work describes an optimization algorithm for earthworks equipment allocation based on a modern optimization approach, which takes advantage of the concept that an earthwork construction can be regarded as a production line.
Resumo:
The evolution of the construction caused a need to use more effective equipments, capable of meeting the increasingly demanding deadlines for the completion of works. In this context, the safety and efficiency of equipment have become key aspects in order to optimize the execution time of the works, as well as reducing labor costs and loss of materials. With the evolution of construction and construction processes, cranes have come to represent a signal of the construction of buildings, revealing to be, in most of the cases, the main equipment of construction sites. Currently, some engineers revels some apprehension regarding the use and handling of cranes which is natural and acceptable, since an equipment failure can lead to serious or fatal accidents. The factors affecting safety management of the cranes in construction sites were investigated, identified, classified and evaluated according to their degree of importance, through interviews with representatives of the general contractors of a set of selected construction sites.
Resumo:
Relatório de projeto de mestrado em Ensino de Informática
Resumo:
The assessment of concrete mechanical properties during construction of concrete structures is of paramount importance for many intrinsic operations. However many of the available non-destructive methods for mechanical properties have limitations for use in construction sites. One of such methodologies is EMM-ARM, which is a variant of classic resonant frequency methods. This paper aims to demonstrate the efforts towards in-situ applicability of EMMARM, as to provide real-time information about concrete mechanical properties such as E-modulus and compressive strength. To achieve the aforementioned objective, a set of adaptations to the method have been successfully implemented and tested: (i) the reduction of the beam span; (ii) the use of a different mould material and (iii) a new support system for the beams. Based on these adaptations, a reusable mould was designed to enable easier systematic use of EMMARM. A pilot test was successfully performed under in-situ conditions during a bridge construction.
Resumo:
The construction industry is responsible for high energy and raw materials consumption. Thus, it is important to minimize the high energy consumption by taking advantage of renewable energy sources and reusing industrial waste, decreasing the extraction of natural materials. The mortars with incorporation of phase change materials (PCM) have the ability to regulate the temperature inside buildings, contributing to the thermal comfort and reduction of the use of heating and cooling equipment, using only the energy supplied by the sun. The simultaneous incorporation of PCM and fly ash (FA) can reduce the energy consumption and the amount of materials landfilled. However, the addition of these materials in mortars modifies its characteristics. The main purpose of this study was the production and characterization in the fresh and hardened state of mortars with incorporation of different contents of PCM and FA. The binders studied were aerial lime, hydraulic lime, gypsum and cement. The proportion of PCM studied was 0%, 20%, 40% and 60% of the mass of the sand. The content of fly ash added to the mortars was 0%, 20%, 40% and 60% of the mass of the binder. It was possible to observe that the incorporation of PCM and fly ash in mortars caused differences in properties such as workability, microstructure, water absorption, compressive strength, flexural strength and adhesion.
Resumo:
This paper aims to present the main features of the roman theatre of Bracara Augusta identified in 1999. Although it is still under study, a significant set of evidence made it possible to present its characteristics, to value the socioeconomic issues related with its construction and to discuss the aspects related to the development of the NW Iberian Peninsula cities, where traditionally this type of equipment was believed to be absent, and to understand the diffusion of roman public architecture models in peripheral regions within the Western Empire.
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.
Resumo:
Despite improvements over the years, accidents continue to be a scourge in the construction sector, leading to an increase in the number of journal articles addressing the issue, in an attempt to help construction industry to increase safety performance [1]. This paper aims to, helping construction industry and particulary tunneling community, describe the Portuguese approach to most typical health and safety problems in underground excavations performed with the Sequential Excavation Method (SEM). The article will address various topics, from safety management and organizational practices, to collective and personal protection equipment, to emergency planning. nt problems in safety and health matters are similar to several other countries, the paper will expose a compilation of Portuguese best practices used to solve that problems. This enunciation of best practices describes experience from most important and recognized Project Owners and Contractors in Portugal. In a second phase it will be analysed Portuguese weaknesses, identifying preventive measures, and their comparative importance, that should be adopted in Portugal in order to reduce accidents and health diseases.
Resumo:
Earthworks tasks aim at levelling the ground surface at a target construction area and precede any kind of structural construction (e.g., road and railway construction). It is comprised of sequential tasks, such as excavation, transportation, spreading and compaction, and it is strongly based on heavy mechanical equipment and repetitive processes. Under this context, it is essential to optimize the usage of all available resources under two key criteria: the costs and duration of earthwork projects. In this paper, we present an integrated system that uses two artificial intelligence based techniques: data mining and evolutionary multi-objective optimization. The former is used to build data-driven models capable of providing realistic estimates of resource productivity, while the latter is used to optimize resource allocation considering the two main earthwork objectives (duration and cost). Experiments held using real-world data, from a construction site, have shown that the proposed system is competitive when compared with current manual earthwork design.
Resumo:
In highway construction, earthworks refer to the tasks of excavation, transportation, spreading and compaction of geomaterial (e.g. soil, rockfill and soil-rockfill mixture). Whereas relying heavily on machinery and repetitive processes, these tasks are highly susceptible to optimization. In this context Artificial Intelligent techniques, such as Data Mining and modern optimization can be applied for earthworks. A survey of these applications shows that they focus on the optimization of specific objectives and/or construction phases being possible to identify the capabilities and limitations of the analyzed techniques. Thus, according to the pinpointed drawbacks of these techniques, this paper describes a novel intelligent earthwork optimization system, capable of integrating DM, modern optimization and GIS technologies in order to optimize the earthwork processes throughout all phases of design and construction work. This integration system allows significant savings in time, cost and gas emissions contributing for a more sustainable construction.
Resumo:
Tese de Doutoramento em Ciências da Educação (área de especialização em Tecnologia Educativa)
Resumo:
This paper analyzes the safety, environmental and occupational health of workers in the small construction industry in Brazil. In this sector there are still many unsafe practices, which are very common in small work sites. We used a qualitative approach to understand these problems by long interviews with people who work directly in small construction sites, including occupational physicians, civil engineers, safety engineers, safety technicians, general foremen, construction workers, labor unionists and auditors. This paper aims to demonstrate that the "invisibility" of the small sites workers makes them less safe and therefore more prone to accidents, also weakening their health. The results show that small constructions workers are less visible to society and supervision because of their short periods of work. Therefore, they are also uncovered to the rigorous applicability of principles of safety and accident prevention. Thus, it has been seen in this field of work a precarious application of NR - 18, which was specifically made for the construction sites and it needs simplification to meet normative characteristics of small construction sites. In the State of Rio de Janeiro, some laws on small sites were recently created and implemented. This study concludes that the rules to work are not being taken as seriously as the legislation determinates, remaining practically unknown by many professionals, from the plot command, supervisors, engineers, architects and technicians who work on construction sites. This ignorance creates space for the lack of safety and consequently to accidents, leading to by weakness in the workers health. Therefore, the work process needs to be modified, the safety regulation must be disseminated through safer practices, promoting employee health and ensure that the work of small sites can be visible, especially ensuring the construction workers health and safety.
Resumo:
Through the analysis of the exceptional accounting documents of 1517 related to the construction of the Monastery of Jerónimos (Lisbon), this paper discusses the main characteristics of a new model of construction site organization. In the later Middle Ages we can find, among others, two main models of constructing site organization. One, older and more widespread, consisted in a centralized and pyramidal management model. The other, apparently more recent, was based in the existence of several autonomous teams working simultaneously, each one responsible for building a specific part or section of the building. This paper describes and discusses this new organizational model as it was adopted and implemented by João de Castilho (1470–1552) for the construction of the Monastery of Jerónimos in 1517, probably for the first time in Portugal, but with some parallels in other places in Europe.