69 resultados para lagging indicator
em Indian Institute of Science - Bangalore - Índia
Resumo:
A novel microprocessor-based temperature indicator has been developed and described. This indicator provides a linear performance over a wide dynamic temperature range of 0-100°C with an accuracy of ±0-l°C. The interfacing module reduces computing time required by the microprocessor for solving the thermistor equation. Test results are given to support the theory.
Resumo:
A novel thermistor-based temperature indicator using an RC oscillator and an up/down counter has been developed and described. The indicator provides linear performance over a wide dynamic temperature range of 0-100°C. This indicator is free from the error due to lead resistances of the thermistor and gives a maximum error of ±0 · 1°C in the range 0-100°C. Test results are given to support the theory.
Resumo:
The possibility of advanced indication of moisture stress in a crop by small prepared plots with compacted or partially sand-substituted soils is examined by an analytical simulation. A series of soils and three crops are considered for the simulation. The moisture characteristics of the soils are calculated with an available model. Using average potential evapotranspiration values and a simple actual evapotranspiration model, the onset of moisture stress in the natural and indicator plots is calculated for different degrees of sand substitution and compaction. Cases where sand substitution fails are determined. The effect of intervening rainfall and limited root depth on the beginning of moisture stress is investigated.
Resumo:
A novel microprocessor-based platinum resistance temperature indicator has been developed and described. This indicator provides a linear performance over a wide dynamic temperature range of - 183.0°C to +200°C with an accuracy of better than ±0.05°C. To sasily carry out the linearization of platinum thermometer through software, the modified Callendar-Van Dusen equation is used. Test results are given to support the theory.
Resumo:
Frequency-domain scheduling and rate adaptation have helped next generation orthogonal frequency division multiple access (OFDMA) based wireless cellular systems such as Long Term Evolution (LTE) achieve significantly higher spectral efficiencies. To overcome the severe uplink feedback bandwidth constraints, LTE uses several techniques to reduce the feedback required by a frequency-domain scheduler about the channel state information of all subcarriers of all users. In this paper, we analyze the throughput achieved by the User Selected Subband feedback scheme of LTE. In it, a user feeds back only the indices of the best M subbands and a single 4-bit estimate of the average rate achievable over all selected M subbands. In addition, we compare the performance with the subband-level feedback scheme of LTE, and highlight the role of the scheduler by comparing the performances of the unfair greedy scheduler and the proportional fair (PF) scheduler. Our analysis sheds several insights into the working of the feedback reduction techniques used in LTE.
Resumo:
Gottigere lake with a water spread area of about 14.98 ha is located in the Bellandur Lake catchment of the South Pennar River basin. In recent years, this lake catchment has been subjected to environmental stress mainly due to the rampant unplanned developmental activities in the catchment. The functional ability of the ecosystem is impaired due to structural changes in the ecosystem. This is evident from poor water quality, breeding of disease vectors, contamination of groundwater in the catchment, frequent flooding in the catchment due to topography alteration, decline in groundwater table, erosion in lake bed, etc. The development plans of the region (current as well as the proposed) ignore the integrated planning approaches considering all components of the ecosystem. Serious threats to the sustainability of the region due to lack of holistic approaches in aquatic resources management are land use changes (removal of vegetation cover, etc.), point and non-point sources of pollution impairing water quality, dumping of solid waste (building waste, etc.). Conservation of lake ecosystem is possible only when the physical and chemical integrity of its catchment is maintained. Alteration in the catchment either due to land use changes (leading to paved surface area from vegetation cover), alteration in topography, construction of roads in the immediate vicinity are detrimental to water yield in the catchment and hence, the sustenance of the lake. Open spaces in the form of lakes and parks aid as kidney and lung in an urban ecosystem, which maintain the health of the people residing in the locality. Identification of core buffer zones and conservation of buffer zones (500 to 1000 m from shore) is to be taken up on priority for conservation and sustainable management of Bangalore lakes. Bangalore is located over a ridge delineating four watersheds, viz. Hebbal, Koramangala, Challaghatta and Vrishabhavathi. Lakes and tanks are an integral part of natural drainage and help in retaining water during rainfall, which otherwise get drained off as flash floods. Each lake harvests rainwater from its catchment and surplus flows downstream spilling into the next lake in the chain. The topography of Bangalore has uniquely supported the creation of a large number of lakes. These lakes form chains, being a series of impoundments across streams. This emphasises the interconnectivity among Bangalore lakes, which has to be retained to prevent Bangalore from flooding or from water scarcity. The main source of replenishment of groundwater is the rainfall. The slope of the terrain allows most of the rainwater to flow as run-off. With the steep gradients available in the major valleys of Bangalore, the rainwater will flow out of the city within four to five hours. Only a small fraction of the rainwater infiltrates into the soil. The infiltration of water into the subsoil has declined with more and more buildings and paved road being constructed in the city. Thus the natural drainage of Bangalore is governed by flows from the central ridge to all lower contours and is connected with various tanks and ponds. There are no major rivers flowing in Bangalore and there is an urgent need to sustain these vital ecosystems through proper conservation and management measures. The proposed peripheral ring road connecting Hosur Road (NH 7) and Mysore Road (SH 17) at Gottigere lake falls within the buffer zone of the lake. This would alter the catchment integrity and hence water yield affecting flora, fauna and local people, and ultimately lead to the disappearance of Gottigere lake. Developmental activities in lake catchments, which has altered lake’s ecological integrity is in violation of the Indian Fisheries Act – 1857, the Indian Forest Act – 1927, Wildlife (Protection) Act – 1972, Water (Prevention and Control of Pollution) Act – 1974, Water (Prevention and Control of Pollution) Act – 1977, Forest (Conservation Act) – 1980, Environmental (Protection) Act – 1986, Wildlife (Protection) Amendment Act – 1991 and National Conservation Strategy and Policy Statement on Environment and Development – 1992. Considering 65% decline of waterbodies in Bangalore (during last three decades), decision makers should immediately take preventive measures to ensure that lake ecosystems are not affected. This report discusses the impacts due to the proposed infrastructure developmental activities in the vicinity of Gottigere tank.
Resumo:
Frequency-domain scheduling and rate adaptation enable next-generation orthogonal frequency-division multiple access (OFDMA) cellular systems such as Long-Term Evolution (LTE) to achieve significantly higher spectral efficiencies. LTE uses a pragmatic combination of several techniques to reduce the channel-state feedback that is required by a frequency-domain scheduler. In the subband-level feedback and user-selected subband feedback schemes specified in LTE, the user reduces feedback by reporting only the channel quality that is averaged over groups of resource blocks called subbands. This approach leads to an occasional incorrect determination of rate by the scheduler for some resource blocks. In this paper, we develop closed-form expressions for the throughput achieved by the feedback schemes of LTE. The analysis quantifies the joint effects of three critical components on the overall system throughput-scheduler, multiple-antenna mode, and the feedback scheme-and brings out its dependence on system parameters such as the number of resource blocks per subband and the rate adaptation thresholds. The effect of the coarse subband-level frequency granularity of feedback is captured. The analysis provides an independent theoretical reference and a quick system parameter optimization tool to an LTE system designer and theoretically helps in understanding the behavior of OFDMA feedback reduction techniques when operated under practical system constraints.
Resumo:
Frequency-domain scheduling and rate adaptation enable next generation wireless cellular systems such as Long Term Evolution (LTE) to achieve significantly higher downlink throughput. LTE assigns subcarriers in chunks, called physical resource blocks (PRBs), to users to reduce control signaling overhead. To reduce the enormous feedback overhead, the channel quality indicator (CQI) report that is used to feed back channel state information is averaged over a subband, which, in turn, is a group of multiple PRBs. In this paper, we develop closed-form expressions for the throughput achieved by the subband-level CQI feedback mechanism of LTE. We show that the coarse frequency resolution of the CQI incurs a significant loss in throughput and limits the multi-user gains achievable by the system. We then show that the performance can be improved by means of an offset mechanism that effectively makes the users more conservative in reporting their CQI.
Resumo:
Sustainability has emerged as one of the important planning concepts from its beginnings in economics and ecological thinking, and has widely been applied to assessing urban development. Different methods, techniques and instruments for urban sustainability assessment that help determine how cities can become more sustainable have emerged over a period of time. Among these, indicator-based approaches contribute to building of sustainable self-regulated systems that integrate development and environment protection. Hence, these provide a solid foundation for decision-making at all levels and are being increasingly used. The present paper builds on the background of the available literature and suggests the need for benchmarking indicator-based approach in a given urban area and incorporating various local issues, thus enhancing the long-term sustainability of cities which can be developed by introducing sustainability indicators into the urban planning process. (C) 2013 International Energy Initiative. Published by Elsevier Inc. All rights reserved.
Resumo:
India needs to significantly increase its electricity consumption levels, in a sustainable manner, if it has to ensure rapid economic development, a goal that remains the most potent tool for delivering adaptation capacity to its poor who will suffer the worst consequences of climate change. Resource/supply constraints faced by conventional energy sources, techno-economic constraints faced by renewable energy sources, and the bounds imposed by climate change on fossil fuel use are likely to undermine India's quest for having a robust electricity system that can effectively contribute to achieving accelerated, sustainable and inclusive economic growth. One possible way out could be transitioning into a sustainable electricity system, which is a trade-off solution having taken into account the economic, social and environmental concerns. As a first step toward understanding this transition, we contribute an indicator based hierarchical multidimensional framework as an analytical tool for sustainability assessment of electricity systems, and validate it for India's national electricity system. We evaluate Indian electricity system using this framework by comparing it with a hypothetical benchmark sustainable electrical system, which was created using best indicator values realized across national electricity systems in the world. This framework, we believe, can be used to examine the social, economic and environmental implications of the current Indian electricity system as well as setting targets for future development. The analysis with the indicator framework provides a deeper understanding of the system, identify and quantify the prevailing sustainability gaps and generate specific targets for interventions. We use this framework to compute national electricity system sustainability index (NESSI) for India. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
A simple multiple pulsewidth modulated (MPWM) ac chopper using power transistors for 3-ý power control is discussed. 120ý chopping period is used for main transistors so that the circuit can accommodate resistive and lagging or leading power factor loads. Only 1-ý sensing is used for 3-ý control. An alternate economical power and control schemes for 3-ý MPWM ac choppers suitable only for resistive loads is also suggested. The experimental results for 12 choppings per cycle are given.