8 resultados para Aerial Views

em Helda - Digital Repository of University of Helsinki


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study analyses British military planning and actions during the Suez Crisis in 1956. It seeks to find military reasons for the change of concepts during the planning and compares these reasons with the tactical doctrines of the time. The thesis takes extensive advantage of military documents preserved in the National Archives, London. In order to expand the understanding of the exchange of views during the planning process, the private papers of high ranking military officials have also been consulted. French military documents preserved in the Service Historique de la Defence, Paris, have provided an important point of comparison. The Suez Crisis caught the British armed forces in the middle of a transition phase. The main objective of the armed forces was to establish a credible deterrence against the Soviet Union. However, due to overseas commitments the Middle East playing a paramount role because of its economic importance the armed forces were compelled to also prepare for Limited War and the Cold War. The armed forces were not fully prepared to meet this demand. The Middle Eastern garrison was being re-organised after the withdrawal from the Canal Base and the concept for a strategic reserve was unimplemented. The tactical doctrines of the time were based on experiences from the Second World War. As a result, the British view of amphibious operations and the subsequent campaigns emphasised careful planning, mastery of the sea and the air, sufficient superiority in numbers and firepower, centralised command and extensive administrative preparations. The British military had realized that Nasser could nationalise the Suez Canal and prepared an outline plan to meet this contingency. Although the plan was nothing more than a concept, it was accepted as a basis for further planning when the Canal was nationalised at the end of July. This plan was short-lived. The nominated Task Force Commanders shifted the landing site from Port Said to Alexandria because it enabled faster expansion of the bridgehead. In addition, further operations towards Cairo the hub of Nasser s power would be easier to conduct. The operational concept can be described as being traditional and was in accordance with the amphibious warfare doctrine. This plan was completely changed at the beginning of September. Apparently, General Charles Keightley, the Commander-in-Chief, and the Chairman of the Chiefs of Staff Committee developed the idea of prolonged aerial operations. The essence of the concept was to break the Egyptian will to resist by attacking the oil facilities, the transportation system and the armed forces. This victory through air concept would be supported by carefully planned psychological operations. This concept was in accordance with the Royal Air Force doctrine, which promoted a bomber offensive against selected target categories. General Keightley s plan was accepted despite suspicions at every planning level. The Joint Planning Staff and the Task Force Commanders opposed the concept from the beginning to the end because of its unpredictability. There was no information that suggested the bombing would persuade the Egyptians to submit. This problem was worsened by the fact that British intelligence was unable to provide reliable strategic information. The Task Force Commanders, who were responsible for the tactical plans, were not able to change Keightley s mind, but the concept was expanded to include a traditional amphibious assault on Port Said due to their resistance. The bombing campaign was never tested as the Royal Air Force was denied authorisation to destroy the transportation and oil targets. The Chiefs of Staff and General Keightley were too slow to realise that the execution of the plan depended on the determination of the Prime Minister. However, poor health, a lack of American and domestic support and the indecisiveness of the military had ruined Eden s resolve. In the end, a very traditional amphibious assault, which was bound to succeed at the tactical level but fail at the strategic level, was launched against Port Said.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Interstellar clouds are not featureless, but show quite complex internal structures of filaments and clumps when observed with high enough resolution. These structures have been generated by 1) turbulent motions driven mainly by supernovae, 2) magnetic fields working on the ions and, through neutral-ion collisions, on neutral gas as well, and 3) self-gravity pulling a dense clump together to form a new star. The study of the cloud structure gives us information on the relative importance of each of these mechanisms, and helps us to gain a better understanding of the details of the star formation process. Interstellar dust is often used as a tracer for the interstellar gas which forms the bulk of the interstellar matter. Some of the methods that are used to derive the column density are summarized in this thesis. A new method, which uses the scattered light to map the column density in large fields with high spatial resolution, is introduced. This thesis also takes a look at the grain alignment with respect to the magnetic fields. The aligned grains give rise to the polarization of starlight and dust emission, thus revealing the magnetic field. The alignment mechanisms have been debated for the last half century. The strongest candidate at present is the radiative torques mechanism. In the first four papers included in this thesis, the scattered light method of column density estimation is formulated, tested in simulations, and finally used to obtain a column density map from observations. They demonstrate that the scattered light method is a very useful and reliable tool in column density estimation, and is able to provide higher resolution than the near-infrared color excess method. These two methods are complementary. The derived column density maps are also used to gain information on the dust emissivity within the observed cloud. The two final papers present simulations of polarized thermal dust emission assuming that the alignment happens by the radiative torques mechanism. We show that the radiative torques can explain the observed decline of the polarization degree towards dense cores. Furthermore, the results indicate that the dense cores themselves might not contribute significantly to the polarized signal, and hence one needs to be careful when interpreting the observations and deriving the magnetic field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of the single building information model has existed for at least thirty years and various standards have been published leading up to the ten-year development of the Industry Foundation Classes. These have been initiatives from researchers, software developers and standards committees. Now large property owners are becoming aware of the benefits of moving IT tools from specific applications towards more comprehensive solutions. This study addresses the state of Building Information Models and the conditions necessary for them to become more widely used. It is a qualitative study based on information from a number of international experts and has asked a series of questions about the feasibility of BIMs, the conditions necessary for their success, and the role of standards with particular reference to the IFCs. Some key statements were distilled from the diverse answers received and indicate that BIM solutions appear too complex for many and may need to be applied in limited areas initially. Standards are generally supported but not applied rigorously and a range of these are relevant to BIM. Benefits will depend upon the building procurement methods used and there should be special roles within the project team to manage information. Case studies are starting to appear and these could be used for publicity. The IFCs are rather oversold and their complexities should be hidden within simple-to-use software. Inevitably major questions remain and property owners may be the key to answering some of these. A framework for presenting standards, backed up by case studies of successful projects, is the solution proposed to provide better information on where particular BIM standards and solutions should be applied in building projects.