Design and Operation of A 5.5 MWe Biomass Integrated Gasification Combined Cycle Demonstration Plant
Resumo:
The design and operation of a 5.5 MWe biomass integrated gasification combined cycle (IGCC) demonstration plant, which is located in Xinghua, Jiangsu Province of China, are introduced. It is the largest complete biomass gasification power plant that uses rice husk and other agricultural wastes as fuel in Asia. It mainly consists of a 20 MWt atmospheric circulating fluidized-bed gasifier, a gas-purifying system, 10 sets of 450 kW(e) gas engines, a waste heat boiler, a 1.5 MWe steam turbine, a wastewater treatment system, etc. The demonstration plant has been operating since the end of 2005, and its overall efficiency reaches 26-28%. Its capital cost is less than 1200 USD/kW, and its running cost is about 0.079 USD/kWh based on the biomass price of 35.7 USD/ton. There is a 20% increment on capital cost and 35% decrease on the fuel consumption compared to that of a 1 MW system without a combined cycle. Because only part of the project has been performed, many of the tests still remain and, accordingly, must be reported at a later opportunity.
Resumo:
采用计算流体动力学(CFD)方法对太阳能烟囱发电装置进行数值模拟,得到装置内部的温度场、速度场、压力场等分布情况。对集热棚的各种几何和物理参数进行研究和分析。结果表明,集热棚直径、太阳辐照强度、覆盖材料的透明度等诸多参数对系统效率有直接而重要的影响。
Some influence factors on efficiency in solar chimney power plant are studied by using the Computational Fluid Dynamics (CFD) method in the paper. The temperature,velocity,pressure of the air are obtained. The study shows the diameter of chimney, solar radiation, transparency of the cover are the most important influence factors, The purpose is to deliver some advice for application and development of solar chimney generation system in future.
Resumo:
设计了一种用于空间对接缓冲试验台的新型高动态响应助推力模拟装置。介绍了助推装置的机构组成和原理,计算了助推气动系统的响应时间,并分析了助推运动过程。研究表明:该助推装置的响应速度快、精度高,助推力方向实时通过模拟飞行器的质心,满足设计要求。
Resumo:
Debris Landslide is one of the types of landslides with the widest distribution, largest quantity, and the closest relationship with engineering construction. It is also one of the most important types of landslides that can cause disaster. This kind of landslide often occurs in the loose slopes which are made up of loose congeries formed by earth filling, residual soil, slope wash, dilapidation, landslide or full weathered material of hard rock. Rainfall is always the chief inducing factor of debris Landslide. Therefore, to research stability of debris Landslide during rainfall not only has important theoretical significance for understanding developing law and deformation and failure mechanism of debris landslide, but also has important practical significance for investigating, appraising, forecasting, preventing and controlling debris landslides. This thesis systematically summarized the relationships between rainfall and landslide, the method to survey water table in the landslides, the deformation and failure mechanism of debris landslide, and the progress in the stability analysis of landslides based on the analyses of data collected widely at home and abroad. The problems in the study of the stability of debris landslide during rainfall was reviewed and discussed. Due to the complicated geological conditions and the random rainfall conditions, the research on the landslides' stability must be based on engineering geological qualitative analysis. Through the collection of the data about the Panxi region and the Three Gorges Reservoir region, the author systematically summarized the engineering geological conditions, hydro-geological condition, distribution characteristics of stress field in the slope, physical and mechanical properties and hydro-mechanical properties of debris. In the viewpoint of dynamics of soil water and hydromechanics, physical process of rainfall to supply groundwater of debris landslides can be divided into two phases, i.e. non-saturated steady infiltrating phase and saturated unsteady supplying phase. The former can be described by mathematical model of surface water infiltration while the latter can be described by equivalent continuous medium model of groundwater seepage. With regard to specific hydrological geology system, we can obtain the dynamic variation law of water content, water table, landslide stability of rock and soil mass, along with quantity and duration of rainfall after the boundary condition on hydrological geology has been ascertained. This is a new way to study the response law of groundwater in the landslides during rainfall. After wet face of rock and soil mass connects with ground water table, the raising of water table will occur due to the supply of rainfall. Then interaction between ground water and rock and soil mass will occur, such as the action of physics, water, chemistry and mechanics, which caused the decrease of shearing strength of sliding zone. According to the action of groundwater on rock and soil mass, a concise mechanical model of debris landslide’s deformation was established during rainfall. The static equilibrium condition of landslide mass system was achieved according to the concise mechanical model, and then the typical deformation and failure process and failure mode of debris landslide during rainfall were discussed. In this thesis, the former limiting equilibrium slice method was modified and improved based on shearing strength theory of , a stability analysis program of debris landslide was established and developed taking account of the saturated-unsaturated seepage, by introducing the shearing strength theory of unsaturated soil mass made by (1978). The program has reasonable data storage and simple interface and is easy to operate, and can be perfectly used to carry out sensitivity analysis of influencing factors of landslides' stability, integrated with the program of Office Excel. The design of drainage engineering are always bases on empirical methods and is short of effective quantitative analysis and appraise, therefore, the conception of critical water table of debris landslide was put forward. For debris landslides with different kinds of slide face in the engineering practice, a program to search the critical water table of debris landslide was developed based on native groundwater table. And groundwater table in the slope should be declined below the critical water table in the drainage works, so the program can be directly used to guide drainage works in the debris landslide. Taking the slope deformation body in the back of former factory building of Muli Shawan hydroelectric power station as an example, a systematic and detailed research on debris landslides' stability during rainfall was researched systematically, the relationship among quantity of rainfall, water table and stability of slope was established, the debris landslides' stability in process of rainfall from dynamic viewpoint was analyzed and researched.
Resumo:
It is a basic work to ascertain the parameters of rock mass for evaluation about stability of the engineering. Anisotropism、inhomogeneity and discontinuity characters of the rock mass arise from the existing of the structural plane. Subjected to water、weathering effect、off-loading, mechanical characters of the rock mass are greatly different from rock itself, Determining mechanical parameters of the rock mass becomes so difficult because of structure effect、dimension effect、rheological character, ‘Can’t give a proper parameter’ becomes one of big problems for theoretic analysis and numerical simulation. With the increment of project scale, appraising the project rock mass and ascertaining the parameters of rock mass becomes more and more important and strict. Consequently, researching the parameters of rock mass has important theoretical significance and actual meaning. The Jin-ping hydroelectric station is the first highest hyperbolic arch dam in the world under construction, the height of the dam is about 305m, it is the biggest hydroelectric station at lower reaches of Yalong river. The length of underground factory building is 204.52m, the total height of it is 68.83m, the maximum of span clearance is 28.90m. Large-scale excavation in the underground factory of Jin-ping hydroelectric station has brought many kinds of destructive phenomenon, such as relaxation、spilling, providing a precious chance for study of unloading parameter about rock mass. As we all know, Southwest is the most important hydroelectric power base in China, the construction of the hydroelectric station mostly concentrate at high mountain and gorge area, basically and importantly, we must be familiar with the physical and mechanical character of the rock mass to guarantee to exploit safely、efficiently、quickly, in other words, we must understand the strength and deformation character of the rock mass. Based on enough fieldwork of geological investigation, we study the parameter of unloading rock mass on condition that we obtain abundant information, which is not only important for the construction of Jin-ping hydroelectric station, but also for the construction of other big hydroelectric station similar with Jin-ping. This paper adopt geological analysis、test data analysis、experience analysis、theory research and Artificial Neural Networks (ANN) brainpower analysis to evaluate the mechanical parameter, the major production is as follows: (1)Through the excavation of upper 5-layer of the underground powerhouse and the statistical classification of the main joints fractures exposed, We believe that there are three sets of joints, the first group is lay fracture, the second group and the fourth group are steep fracture. These provide a strong foundation for the following calculation of and analysis; (2)According to the in-situ measurement about sound wave velocity、displacement and anchor stress, we analyses the effects of rock unloading effect,the results show a obvious time-related character and localization features of rock deformation. We determine the depth of excavation unloading of underground factory wall based on this. Determining the rock mass parameters according to the measurement about sound wave velocity with characters of low- disturbing、dynamic on the spot, the result can really reflect the original state, this chapter approximately the mechanical parameters about rock mass at each unloading area; (3)Based on Hoek-Brown experienced formula with geological strength index GSI and RMR method to evaluate the mechanical parameters of different degree weathering and unloading rock mass about underground factory, Both of evaluation result are more satisfied; (4)From the perspective of far-field stress, based on the stress field distribution ideas of two-crack at any load conditions proposed by Fazil Erdogan (1962),using the strain energy density factor criterion (S criterion) proposed by Xue changming(1972),we establish the corresponding relationship between far-field stress and crack tip stress field, derive the integrated intensity criterion formula under the conditions of pure tensile stress among two line coplanar intermittent jointed rock,and establish the corresponding intensity criterion for the exploratory attempt; (5)With artificial neural network, the paper focuses on the mechanical parameters of rock mass that we concerned about and the whole process of prediction of deformation parameters, discusses the prospect of applying in assessment about the parameters of rock mass,and rely on the catalog information of underground powerhouse of Jinping I Hydropower Station, identifying the rock mechanics parameters intellectually,discusses the sample selection, network design, values of basic parameters and error analysis comprehensively. There is a certain significance for us to set up a set of parameters evaluation system,which is in construction of large-scale hydropower among a group of marble mass.
Resumo:
Rock mass is widely recognized as a kind of geologic body which consists of rock blocks and discontinuities. The deformation and failure of rock mass is not only determined by rock block,but also by discontinuity which is virtually more important. Mutual cutting and combination of discontinuities controlled mechanical property of rock mass. The complex cutting of discontinuities determine the intense anisotropy on mechanical property of rock mass,especially under the effect of ground stress. Engineering practice has show that the brittle failure of hard rock always occurs when its working stress is far lower than the yield strength and compressive strength,the failure always directly related to the fracture propagation of discontinuities. Fracture propagation of discontinuities is the virtue of hard rock’s failure. We can research the rock mass discontinuous mechanical properties precisely by the methods of statistical analysis of discontinuities and Fracture Mechanics. According to Superposition Principle in Fracture Mechanics,A Problem or C Problem could be chosen to research. Problem A mainly calculates the crack-tip stress field and displacement field on internal discontinuities by numerical method. Problem C calculate the crack-tip stress field and displacement field under the assumption of that the mainly rock mass stress field has been known. So the Problem C avoid the complex mutual interference of stress fields of discontinuities,which is called crack system problem in Fracture Mechanics. To solve Problem C, field test on stress field in the rock mass is needed. The linear Superposition of discontinuities strain energies are Scientific and Rational. The difference of Fracture Mechanics between rock mass and other materials can mostly expression as:other materials Fracture Mechanics mostly face the problem A,and can’t avoid multi-crack puzzle, while the Rock mass Fracture Mechanics answer to the Problem C. Problem C can avoid multi-discontinuities mutual interference puzzle via the ground stress test. On the basis of Problem C, Fracture Mechanics could be used conveniently in rock mass. The rock mass statistics fracture constitutive relations, which introduced in this article, are based on the Problem C and the Discontinuity Strain Energy linear superposition. This constitutive relation has several merits: first, it is physical constitutive relation rather than empirical; second, it is very fit to describe the rock mass anisotropy properties; third, it elaborates the exogenous factors such as ground stress. The rock mass statistics fracture constitutive relation is the available approach to answer to the physical, anisotropic and ground stress impacted rock mass problems. This article stand on the foundation of predecessor’s statistics fractures constitutive relation, and improved the discontinuity distributive function. This article had derived the limitation of negative exponential distribution in the course of regression analysis, and advocated to using the two parameter negative exponential distribution for instead. In order to solve the problems of two-dimension stability on engineering key cross-sectional view in rock mass, this article derived the rock mass planar flexibility tensor, and established rock mass two-dimension penetrate statistics fracture constitutive relation on the basis of penetrate fracture mechanics. Based on the crack tip plasticity research production of penetrate fracture, for example the Irwin plasticity equifinality crack, this article established the way to deal with the discontinuity stress singularity and plastic yielding problem at discontinuity tip. The research on deformation parameters is always the high light region of rock mass mechanics field. After the dam foundation excavation of XiaoWan hydroelectric power station, dam foundation rock mass upgrowthed a great deal of unload cracks, rock mass mechanical property gotten intricacy and strong anisotropy. The dam foundation rock mass mostly upgrowthed three group discontinuities: the decantation discontinuity, the steep pitch discontinuity, and the schistosity plane. Most of the discontinuities have got partial unload looseness. In accordance with ground stress field data, the dam foundation stress field greatly non-uniform, which felled under the great impaction of tectonic stress field, self-weight stress field, excavation geometric boundary condition, and excavation, unload. The discontinuity complexity and stress field heterogeneity, created the rock mass mechanical property of dam foundation intricacy and levity. The research on the rock mass mechanics, if not take every respected influencing factor into consideration as best as we can, major errors likely to be created. This article calculated the rock mass elastic modulus that after Xiao Wan hydroelectric power station dam foundation gutter excavation finished. The calculation region covered possession monolith of Xiao Wan concrete double-curvature arch dam. Different monolith were adopted the penetrate fracture statistics constitutive relation or bury fracture statistics constitutive relation selectively. Statistics fracture constitutive relation is fit for the intensity anisotropy and heterogeneity rock mass of Xiao Wan hydroelectric power station dam foundation. This article had contrastive analysis the statistics fracture constitutive relation result with the inclined plane load test actual measurement elastic modulus and RMR method estimated elastic modulus, and find that the three methods elastic modulus have got greatly comparability. So, the statistics fracture constitutive relations are qualified for trust. Generally speaking,this article had finished following works based on predecessors job: “Argumentation the C Problems of superposition principle in Fracture Mechanics, establish two-dimension penetrate statistics fracture constitutive relation of rock mass, argue the negative exponential distribution limitation and improve it, improve of the three-dimension berry statistics fracture constitutive relation of rock mass, discontinuity-tip plastic zone isoeffect calculation, calculate the rock mass elastic modulus on two-dimension cross-sectional view”. The whole research clue of this article inherited from the “statistics rock mass mechanics” of Wu Faquan(1992).
Resumo:
Distributions of elements especially hazard trace elements in coals and their wastes from a coal fired power plant have been studied in detail using knowledge of Geology, Mineralogy, Geochemistry and Environmental chemistry. The key work is on the small particle sizes of fly ashes which escaped from electric precipitator and discharged into atmosphere. By means of X-ray powder diffraction (XRD) and scanning electron microscopy with energy-dispersive spectrometer (SEM-EDS), the characteristics of minerals and morphologies were studied. Different types of fly ash were formed in different stages and processes. More than 50% of small fly ashes belonged to inhalable particles (PM10). The very fine fly ashes preferred to attach on surface of bigger fly ash or conglutinate with each other and this decreased the environmental impact of tiny fly ashes. The trace elements in coal, fly ashes, slags and small particle sizes of fly ashes had been analysed by means of Neutron Activation Analysis (INAA), inductively coupled plasma mass spectrometry (ICP-MS), inductively coupled plasma atomic emission spectrometry (ICP-AES). As particle sizes decreasing, distributions of most elements increased, but in contrary to most studies, this increasing trend was not very obviously because of the tendency of attachment of tiny fly ashes. The occurrence of 30 elements including hazard trace elements of Cd, Cr, Ni, Co, Pb, Zn, As, Se, Cu, V was studied by means of sequential chemical extract. The annual discharge of hazard trace elements of slag, fly ash, small fly ash (PM10), tiny fly ash (PM2.5) and air was calculated by mass balance. S, V, Cu, Pb, Se, Mo, Cd from power plant had potential impacts on environment. Hazard trace elements from the power plant had little effect on soil and aerosol comparing to those from other industrial sources and the effects were mostly on downwind direction. Both the high performance electric precipitator and high chimney made the hazard trace elements from power plant being transported far away but little environmental impacts.
Resumo:
As the foundation of other human resource practices, job analysis plays an essential role in HR management. Exploring sources of variance in job analysis ratings given by incumbents from the same job is of much significance to HRM practices. It can also shed lights on employee motivation in organizations. But previous studies in job analysis field have usually been conducted at individual level and take variance in job analysis ratings given by incumbents of the same job as error or bias. This dissertation takes the position that the variance may be meaningful based on role theory and other relevant theories. It first reviewed pervious studies on factors which may influence job analysis ratings provided by incumbents of the same job, and then investigated individual, interpersonal and organizational level variables which may exert impacts on these job analysis ratings, using multilevel data from 8 jobs of 1124 incumbents. The major findings are as follows: 1) Level of job performance and job attitudes affect incumbents’ job analysis ratings by incumbents of the same job at individual level. Specifically, incumbents with high level of job performance rated their job require higher levels of technical skills (power plant designers), and regarded information processing activities as more important to their job (book editors). Regarding the effects of job attitudes, incumbents of the four jobs with high level of job satisfaction gave higher importance and level ratings on organizational and cognitive skills, as well as higher level ratings on technical skills. Further, incumbents with higher affective commitment provided higher importance and level ratings of cognitive skills. Lastly, more involved job incumbents perceived organizational skills and cognitive skills as more important, and required at higher levels, for their job. 2) Leader-Member Exchange and goal structure also have effects on job analysis ratings by incumbents of the same job at interpersonal level. In good quality LMX relationship, news reporters rated decision-making activities and interpersonal activities as more important to their job. On the other side, when book editors structured their goals as cooperative with others’, they provided higher importance ratings on reasoning and interpersonal skills, and related personality requirements, as well as higher level ratings on reasoning abilities. 3) Worker requirements for the identical job are distinct from one organization to another. Specifically, there were between-organization differences in achievement orientation and conscientiousness related personality requirements. In addition, two dimensions of organizational culture, achievement-oriented culture and integrity-oriented culture in particular, were significantly associated with importance ratings of achievement orientation and conscientiousness related personality requirements respectively. Furthermore, achievement-oriented culture both directly and indirect (through job involvement) influenced achievement orientation related personality requirements. The results indicate that variation in job analysis ratings provided by incumbents of the same job may be meaningful. Future job analysis studies and practices should consider the impacts of these individual, interpersonal and organizational level factors on job analysis information. The results also have important implications for employee motivation concerning how organizational demands can be transformed into specific job and worker requirements.
Resumo:
In this study, we analyzed the operational characteristics of a 1.2-MW rice husk gasification and power generation plant located in Changxing, Zhejiang province, China. The influences of gasification temperature, equivalence ratio (ER), feeding rate and rice husk water content on the gasification characteristics in a fluidized bed gasifier were investigated. The axial temperature profile in the dense phase of the gasifier showed that inadequate fluidization occurred inside the bed, and that the temperature was closely related to changes in ER and feeding rate. The bed temperature increased linearly with increasing ER when the feeding rate was kept constant, while a higher feeding rate corresponded to a lower bed temperature at fixed ER. The gas heating value decreased with increasing temperature, while the feeding rate had little effect. When the gasification temperature was 700-800C, the gas heating value ranged from 5450-6400kJ/Nm3. The water content of the rice husk had an obvious influence on the operation of the gasifier: increases in water content up to 15% resulted in increasing ER and gas yield, while water contents above 15% caused aberrant temperature fluctuations. The problems in this plant are discussed in the light of operational experience of MW-scale biomass gasification and power generation plants.
Resumo:
A DFT/MD mutual iterative method was employed to give insights into the mechanism of voltage generation based on water-fitted single-walled carbon nanotubes (SWCNTs). Our calculations showed that a constant voltage difference of several mV would generate between the two ends of a carbon nanotube, due to interactions between the water dipole chains and charge carriers in the tube. Our work validates this structure of a water-fitted SWCNT as a promising candidate for a synthetic nanoscale power cell, as well as a practical nanopower harvesting device at the atomic level.
Resumo:
The distribution of vascular plant species richness along an altitudinal gradient and their relationships with environmental variables, including slope, aspect, bank (flooding) height, and river width of the Xiangxi River, Hubei Province, were examined. Total vascular plant species richness changed with elevation: it increased at lower elevations, reached a maximum in the midreaches and decreased thereafter. In particular, tree and herbaceous species richness were related to altitude. Correlation analysis (Kendall's tau) between species richness and environmental variables indicated that the change in species richness in the riparian zone was determined by riparian environmental factors and characteristics of regional vegetation distribution along the altitudinal gradient. The low species richness at lower elevations resulted from seasonal flooding and human activities - agriculture and fuel collection - and the higher. Species richness ill (he midreaches reflected transitional zones ill natural vegetation types that had had little disturbance. These results oil species distribution in the riparian community could he utilized as a reference for restoration efforts to improve water quality of the emerging reservoir resulting from the Three Gorges Hydroelectric Dam project.