A 5.5MWe biomass demonstration power plant via gasification integrated combined cycle


Autoria(s): Chuangzhi Wu; Xiuli Yin; Ping Chen; Longlong Ma
Data(s)

06/08/2010

Identificador

http://ir.giec.ac.cn/handle/344007/3009

http://www.irgrid.ac.cn/handle/1471x/68621

Fonte

Chuangzhi Wu;Xiuli Yin;Ping Chen;Longlong Ma.A 5.5MWe biomass demonstration power plant via gasification integrated combined cycle.见:.,,,p188-196

Tipo

会议论文