29 resultados para Nest excavation
em Chinese Academy of Sciences Institutional Repositories Grid Portal
Resumo:
采用面一面接触的三维离散元刚性块体模型,从实测节理面中取出其中的三组,按照其倾向、倾角和节理间距将三峡永久船闸未开挖的区域划分为10~5个离散单元,通过施加力边界条件,给出了与实测初始地应力场接近的数值模拟结果;然后,分4步模拟了永久船闸的开挖过程。计算结果表明:开挖过程会引起节理面出现张开趋势,个别岩体还会沿着节理面滑移。岩体位移的不对称现象较为自然地说明了由节理引起的岩体各向异性特征。
Resumo:
The critical excavation depth of a jointed rock slope is an important problem in rock engineering. This paper studies the critical excavation depth for two idealized jointed rock slopes by employing a face-to-face discrete element method (DEM). The DEM is based on the discontinuity analysis which can consider anisotropic and discontinuous deformations due to joints and their orientations. It uses four lump-points at each surface of rock blocks to describe their interactions. The relationship between the critical excavation depth D-s and the natural slope angle alpha, the joint inclination angle theta as well as the strength parameters of the joints c(r) ,phi(r) is analyzed, and the critical excavation depth obtained with this DEM and the limit equilibrium method (LEM) is compared. Furthermore, effects of joints on the failure modes are compared between DEM simulations and experimental observations. It is found that the DEM predicts a lower critical excavation depth than the LEM if the joint structures in the rock mass are not ignored.
Resumo:
From 5 May 2003 to early June 2005, nest site selection of Black-necked Cranes Grits nigricollis was studied at the Ruoergai Wetland Nature Reserve (RWNR), an important breeding area for the species in China. Results showed that the crane nests only in we
Resumo:
采用面-面接触的三维离散元刚性块体模型,从实测节理面中取出其中的三组,按照其倾向、倾角和节理间距将三峡永久船闸未开挖的区域划分为10~5个离散单元,通过施加力边界条件,给出了与实测初始地应力场接近的数值模拟结果;然后,分4步模拟了永久船闸的开挖过程。计算结果表明:开挖过程会引起节理面出现张开趋势,个别岩体还会沿着节理面滑移。岩体位移的不对称现象较为自然地说明了由节理引起的岩体各向异性特征。
Resumo:
对平唇原胡蜂营巢地和蜂巢的结构进行了观察,结果表明:(1)蜂巢中部较大的巢脾为主要繁殖区;(2)幼虫和工蜂所占比例最高,占全巢各虫态总数的70%左右;(3)巢中成熟个体中,除蜂后外其余全部为雌性工蜂;(4)由于当地气候适宜,越冬期的低温虽使其活动能力下降,但不会引起大量死亡,可以在原巢址内越冬.
Resumo:
分别从喂食三株原始产毒铜绿微囊藻Microcystis aeruginosa(AC、DS和PCC 7820)的金藻Poterioochromonassp.培养物中获得三株藻,以Nest PCR方法(引物对CC/CG和CH/CI)确定此三株藻均为微囊藻属藻株。HPLC测试结果显示这三株藻均不产生微囊藻毒素。显示Poterioochromonassp.具有将产毒微囊藻转化为无毒微囊藻的能力。比较产毒原始株与无毒变异株的生理特性发现,变异株的类胡萝卜素/叶绿素比值高于原始株;而光反应曲线结果表明,变异株的PSⅡ
Resumo:
After the excavation of Jinping underground cavern, a strong expansion appears along the unloading direction of the rock mass, mainly in the type of tensile rupture, accompanied by shear destruction, unloading resulted in significant deterioration of mechanical properties of rock. Based on the in-site investigation of rock mass structure, via analyzing the acoustic testing data, we identify the unloading range of the side walls and the division of rock types, and carry out with the solution of rock mechanical parameters about different unloading zone, providing geological foundation for the supporting design of the following design of the side walls, at the same time, providing reference for the selection of mechanical parameters of other underground excavation engineering with similar geological conditions.
Resumo:
genetics, such as: population size, reproduction, mating system, growth, development,genetic structure and systematics status; The main results are presented below: The seasonal variation of the operational sexual ratio of this animal was found in the field and the ration always bias the female in the breeding season. Aiming at this character and considering the distance of time and space of both sexual habitat in breeding season, we census female population first by toe-clipping mark-recapture method, then estimated the population size with the definitive sexual ratio. Up to now, this species was found only at the Beilun district of the Ningbo City. The population size of the Ruiyan Temple Forest Park approximates to 369. The status of this population is extremely endangered, so besides protecting this population at the original locality, we also suggested to breed the salamander in fenced locality and to hatch embryos artificially, and send metamorphosed juveniles back to nature. We can transfer some individuals to other similar habitats or breed them under artificial conditions for saving this species from extinction. The early developmental stage of the Chinhai salamander is the same as its relative species, E. andersoni. Their balanceres are poorly developed and disappear very early. Temperature and moisture significantly influence the embryonic development of the Chinhai salamander. The embryonic stage is approx. 29 days under room temperature. The hatchling grows in a logarithmic curve. The larvae stage in water is approx. 58- 88 days. Many factors influence the nomal development, including two aspects of internal and external. Due to these factors, the effective protected measures were presented in detail. The breeding migration of E. chinhaiensis takes place at late March~late April every year. This salamander's hatching rate is high, but the rate of hatchling migrating into water is low. The average effectiveness of all the nest sites is 36.7%. The maternal self-conservation was contrary to the reproductive success of the egg-laying strategy. In the strategy of egg-laying behavior, the first factor selected by the female was its self-conservation, the second is embryonic survival rate, and the last is rate of hatchling survival rate. The oviposition selection is significant for the survival of the larvae. Based on the analysis of the evolutionary process of reproductive behaviors nad egg-laying site selections of all genera of the family Salamandridae, we deduced that perhaps Echinotriton is a transitional type in the evolutionary process from water to land. Due to its location in the adaptive stage in the terrestrial evolution, Echinotriton chinhaiensis's terrestrial nest may be one of important reason that causes this species to be endangered. The genetic deversity analysis shows that although the population size of the Chinhai salamander is quite small compared to other Chinese salamandrid species, the genetic diversity of this population is not reduce remarkably. We explain this phenomena with the polygamy mating system of this species. The result of 4 families' parenthood determinations shows that the parenhood determination can be taken without any paternal information. The "children" of every female include rich genetic information from at least two "fathers". It implies that female Chinhai salamander mates more than once with different males in a breeding season. The molecular evidence, the behavioral observation evidences and the sperm evidence in the female cloaca proved that this species has a polygamy mating system. The kin recognition in the mating of adult salamander was first discussed. The taxonomic status and phylogenetic relationships of 12 species representing 6 genera in the family Salamandridae were studied using DNA fingerprinting. The results showed that the DNA fingerprinting. The results showed that the DNA fingerprinting patterns demonstrated rich genetic diversity and species diversity, and also revealed the taxonomic status and phylogenetic relationshipes of higher taxa to a certain extent. The results are highly consistent with those obtained from the studies based on the morphology, ecology, cytology and molecular biology. The compreshensive analysis indicate that Tylototrition hainanensis and T. wenxianensis should be valid species; Echinotriton should be a valid genus;Tylotortriton is a natural cluster; Tylotortriton asperrimus should be put in Tylototrition rather than in Echinotriton, Hypselotriton and Allomestriton are synonyms of Cynops and Paramesotriton, respectively. There are three main groups in Chinese salamandride: Cynops, Paramesotriton and Pachytrition from the first group, the species of the Tylototriton from the second, and E. chinhaiensis composes the third.
Resumo:
本研究是围绕昆虫的假死行为及建巢相关行为两个方面进行的。首先通过对昆虫假死行为的研究历史和现状的综述,作者提出了假死行为是一种特殊拟态的观点。对长壮蝎蝽Laccotrephes robustus Stål成虫在不同的活动空间下(水体内外)的假死行为以及控制假死行为的关键部位的研究结果表明:(1)水体外假死时长明显高于水体中;(2)蝎蝽在水体内外假死行为的差别是对不同捕食压力的适应,能够提高自身的适合度;(3) 头部不是蝎蝽假死发生所必需的,控制胸部各对足完成假死动作的神经节可能是不同的。胡蜂类昆虫的建巢行为直接关系到其蜂群的发展和存活。平唇原胡蜂Prevespa barthelemy (Buysson)隶属于胡蜂科,是一种社会性昆虫。为研究已建造蜂巢的相关生物学特征,对其越冬后蜂巢进行了解剖观察。结果表明:(1)蜂巢中部较大的巢脾为主要的繁殖区;(2)幼虫和工蜂所占比率最高,占全巢各虫态总数的70%左右;(3)巢中成熟个体,除蜂后外其余全部为雌性工蜂;(4)由于当地气候适宜,越冬期的低温虽使其活动能力下降,但不会引起大量死亡,该胡蜂可以在原巢址内越冬。胡蜂类昆虫雌蜂单母建群的过程可以视为是昆虫社群生活起源的短暂重现,对单母建群行为的研究有助于理解昆虫群居生活的发生和发展。通过对焰马蜂Polistis adustus Birgham单母建群过程的观察,结果表明:(1)第一批工蜂羽化前,雌蜂同时担任蜂王和工蜂的职责;(2)各虫态发育历期卵为5-7 d;幼虫13-15 d;蛹为24-28 d;(3) 单母建群时期是决定未来蜂群发展的重要阶段,也是对马蜂类天敌昆虫进行保护和利用的关键时期。
Resumo:
针对挖掘机工作装置的结构特点 ,建立了其系统 3维有限元模型 ,通过分析得出了系统的固有频率和振型 ,以及结构动态响应各时刻的变形和应力分布规律。比较了工作装置在开挖难度较小和较大 2种情况下 ,挖掘阻力对系统动力响应的影响
Resumo:
Dam is the key main works in the construction of water power. The success or failure of the construction of the dam mainly depends on the stability of the dam foundation. The double curvature arch dam-XiaoWan Dam is the highest one among the dams with the same type in the world, and the water thrust acted on it reaches ton, so the rock bearing capacity of dam foundation becomes more important. Because of the high and steep valley-side slope, the large scale of excavation and the complex body type of excavation, it is prominent that the problem of stress release of the rock mass in dam foundation. More great attentions should be paid for the stability and the degraded of rock properties of rock mass induced by the stress release. In this paper, the phenomena of stress release of rock mass in XiaoWan Dam foundation and its mechanisms were analyzed based on the collection of data, the detailed field engineering investigations, measurement of the rock mass and the 2D numerical calculations. The rock mass under the foundation is weak-weathered to intact, the quality of which is good. After excavation of the foundation, the rock mass near the slope surface occurred extend, stretch and stick-slip along original textures till the new fracture surface formed. Then platy structure of the rock mass takes on. The rock mass in the dam foundation occur resilience due to stress release towards free faces with the characteristics of time effect and localized deformation. In-situ measurements show that the rock mass near the surface are degraded. The stress release induced by excavation is a process of the interaction between engineering structures and geologic body. The stress release of rock mass in dam foundation is related to the changed degree of geometrical conditions. The rock near excavation surface failed nearly under uniaxial stresses. The bending-breaking mechanism of plate girder can interpret the failure model of the rock mass with platy structure in dam foundation slope. In essence, the stress release is the change of stress field including the change of directions and magnitudes of stress induced by excavation, which can induce the comedown of the safety margin. In this paper, the inducing conditions of stress release were calculated by numerical analyses. Moreover, from the point of view that the change of stress field, the coefficient of K, i.e. the variable load coefficient was proposed. Then the law of the change of it is interpreted. The distributional characteristics of fracture zone were expressed by the coefficient. The stress release of hard rock has the characteristic of localization. The measuring technique of sound wave can not reflect the small cracks in this kind of rock mass due to stress release. So, the spectral analysis method was proposed. At the same time, the application foreground in engineering of the Stockwell Time-Frequency- Spectrum method was discussed with a view to the limitation of it.
Resumo:
The anchorages are unparalleled structures only in a suspension bridge, and as main bearing facilities, play an important role in connecting the superstructures and the ground. The tunnel anchorage, as one alternative type of the anchorages, has more advantages over its counterpart, the gravity anchorage. With the tunnel anchorages adopted, not only can surface excavation be reduced to protect the environment, and natural condition of the rock be utilized and potential bearing capacity of surrounding rock be mobilized to save engineering cost, but also the technological predominance of auxiliary engineering measures, such as prestressed concrete, anchoring piles, rock anchors and collar beam between the two separated anchorages, can be easily cooperated to work together harmoniously under the circumstances of poor rock quality. There are plentiful high mountains and deep canyons in west part of China, and long-span bridge construction is inevitably encountered in order to realize leapfrogging development of the transportation infrastructure. Western mountainous areas usually possess the conditions for constructing tunnel anchorages, and therefore, the tunnel anchorages, which are conformed to the conception of resource conservative and sustainable society, extremely have application and popularization value in western underdeveloped region. The scientific and technological problem about the design, construction and operation of tunnel anchorages should be further investigated. Combining the engineering of western tunnel anchorages for the Balinghe Suspension Bridge, this paper probed into the survey method and in-situ test method for tunnel anchorages, scientific rock quality evaluation of surrounding rock to provide reasonable physical and mechanical parameters for design, construction and operation of tunnel anchorages, bearing capacity estimation for tunnel anchorage, deformation prediction of the anchorage-rockmass system, tunnel-anchorage slope stability analysis and the evaluation of excavation stability and degree of safety of the anchorage tunnel. The following outcomes were obtained: 1. Materials of tunnel anchorages of suspension bridge built (and in progress) at home and abroad were systematically sorted out, with the engineering geological condition and geomechanical property of surrounding rock around the anchorage tunnel, the design size of anchorages and the construction method of anchorage tunnel paid more emphasis on, to unveil the internal relationship between the engineering geological conditions of surrounding rock and the design size and axis angle of anchorages and provide references for future design, construction and study of tunnel anchorages. 2. Physical and mechanical parameters were recommended based on three domestic and foreign methods of rock quality evaluation. 3. In-situ tests, adopting the back-thrust method, of two kinds of reduced scale model, 1/30 and 1/20, for the tunnel anchorages were conducted in the declining exploration drift with rock mass at the test depth being the same as surrounding rock around real anchorages, and reliable field rockmass displacement data were acquired. Attenuation relation between the increment of distance from the anchorage and the decrement of rockmass displacement under maximum test load, and influential scope suffered by anchorage load were obtained. 4. Using similarity theory, the magnitude of real anchorage and rockmass displacement under design load and degree of safety of the anchorage system were deduced. Furthermore, inversion analysis to deformation modulus of slightly weathered dolomite rock, the surrounding rock of anchorage tunnel, was performed by the means of numerical simulation. 5. The influential law of the geometrical size to the limit bearing capacity of tunnel anchorage was studied. 6. Based on engineering geological survey data, accounting for the combination of strata layer and adverse discontinuities, the failure patterns of tunnel anchorage slope were divided into three modes: sliding of splay saddle pier slope, superficial-layer slippage, and deep-layer slippage. Using virtual work principle and taking anchorage load in account, the stability of the three kinds of failure patterns were analyzed in detail. 7. The step-by-step excavation of anchorage tunnel, the numerical overload and the staged decrement of rock strength parameters were numerically simulated to evaluate the excavation stability of surrounding rock around anchorage tunnel, the overload performance of tunnel anchorage, and the safety margin of strength parameters of the surrounding rock.
Resumo:
The two major issues in mining industry are work safety and protection of ground environment when carrying on underground mining activities. Cut-and-fill mining method is increasingly applied in China owing to its advantages of controlling ground pressure and protecting the ground environment effectively. However, some cut-and-fill mines such as Jinchuan nickel mine which has big ore body, broken rock mass and high geostress have unique characteristics on the law of ground pressure and rock mass movement that distinguish from other mining methods. There are still many problems unknown and it is necessary for the further analysis. In this dissertation, vast field survey, geology trenching and relative data analysis are carried out. The distribution of ground fissures and the correlation of the fissures with the location of underground ore body is presented. Using of monitoring data by three-dimension fissure meter and GPS in Jinchuan Deposit Ⅱ, the rule of the surface deformation and the reason of ground fissures generation are analyzed. It is shown that the stress redistribution in surrounding rocks resulting from mining, the existence of the void space underground and the influence of on-going mining activities are three main reasons for the occurrence of ground fissures. Based on actual section planes of No.1 ore body, a large-scale 3D model is established. By this model, the complete process of excavation and filling is simulated and the law of rock mass movement and stability caused by Cut-and-fill Mining is studied. According to simulation results, it is concluded that the deformation of ground surface is still going on developing; the region of subsidence on the ground surface is similar with a circle; the area on the hanging wall side is larger than one on the lower wall side; the contour plots show the centre of subsidence lay on the hanging wall side and the position is near the ore body boundary of 1150m and 1250m where ore body is the thickest. Along strike-line of Jinchuan Deposit Ⅱ, the deformation at the middle of filling body is larger than that in the two sides. Because of the irregular ore body, stress concentrates at the boundary of ore body. With the process of excavation and filling, the high stress release and the stress focus disappear on the hanging wall side. The cut-and-fill mechanism is studied based on monitoring data and numerical simulation. The functions of filling body are discussed. In this dissertation, it is concluded that the stress of filling body is just 2MPa, but the stress of surrounding rock mass is 20MPa. We study the surface movement influenced by the elastic modulus of backfill. The minimal value of the elastic modulus of backfill which can guarantee the safety production of cut-and-fill mine is obtained. Finally, based on the real survey results of the horizontal ore layer and numerical simulation, it is indicated that the horizontal ore layer has destroyed. Key words: cut-and-filling mining, 3D numerical simulation, field monitoring, rock mass movement, cut-and-filling mechanism, the elastic modulus of backfill, the horizontal ore layer