6 resultados para Integrated Planning Framework
em Chinese Academy of Sciences Institutional Repositories Grid Portal
Resumo:
开放式实时环境中的多类型实时任务并存的情况给实时调度机制带来了新的需求和挑战 提出了一种适用于开放式实时环境的 3层集成调度框架 ,它基于服务器方式的实时调度理论 ,把 5种既有相关性又有功能互补特征的服务器有机的集成到统一的调度机制中 可支持多种类型的实时任务及非实时任务共存于同一系统的混合调度 ,并且根据它们的属性自动选择最合适的服务器与之搭配 相对于现有方法 ,该调度框架可支持的调度对象类型更广泛 ,易于进行服务质量控制 ,并且有良好的可扩展性 因此 ,更适合于开放式实时环境
Resumo:
为解决供应链生产计划协调问题,通过市场价格和中间库存因素使供应链上下游企业结合成一个整体,建立一种供应链上下游一体化计划模型,从整体考虑供应链合作计划问题.为获取问题的可行解,采用拉格朗日松弛技术进行优化,为供应链上下游企业在信息共享条件下实现"多赢"目标,提供了理论依据.仿真结果验证了模型和算法的有效性。
Resumo:
The aim of this study is to increase the precision of groundwater modeling. The way is use the distributed model calculate the mountain basin groundwater lateral discharge and the river runoff. With appropriate technique help, the groundwater model can couple the distributed model results. This paper’s study object is makeing the distributed hydrological model HEC-HMS coupled to the popular groundwater model Visual MODFLOW. The application example is Jiyuan basin which is a typical basin of North China. HEC-HMS can calculate the surface runoff and subsurface runoff at mountain-pass. The subsurface runoff can turn to recharge well straightly. The water level - runoff course and Trial method is used to back analyze the parameters of surface runoff to Visual MODFLOW. So the distributed hydrological model can coupled to the groundwater model. The research proved that base on couple the distributed surface water model the groundwater model’s results are notability improved. The example is Jiyuan basin where use the distributed model coupled to the groundwater model. On the base of the coupled model applied to Jiyuan basin groundwater modeling. The paper estimates the groundwater change in the study area. Then, by use the water resources integrated planning results, the article calculate the basin groundwater can be development and utilization quantity and potential.
Resumo:
This paper presents a novel robot named "TUT03-A" with expert systems, speech interaction, vision systems etc. based on remote-brained approach. The robot is designed to have the brain and body separated. There is a cerebellum in the body. The brain with the expert systems is in charge of decision and the cerebellum control motion of the body. The brain-body. interface has many kinds of structure. It enables a brain to control one or more cerebellums. The brain controls all modules in the system and coordinates their work. The framework of the robot allows us to carry out different kinds of robotics research in an environment that can be shared and inherited over generations. Then we discuss the path planning method for the robot based on ant colony algorithm. The mathematical model is established and the algorithm is achieved with the Starlogo simulating environment. The simulation result shows that it has strong robustness and eligible pathfinding efficiency.
Resumo:
Expansion of economic activities, urbanisation, increased resource use and population growth are continuously increasing the vulnerability of the coastal zone. This vulnerability is now further raised by the threat of climate change and accelerated sea level rise. The potentially severe impacts force policy-makers to also consider long-term planning for climate change and sea level rise. For reasons of efficiency and effectiveness this long-term planning should be integrated with existing short-term plans, thus creating an Integrated Coastal Zone Management programme. As a starting point for coastal zone management, the assessment of a country's or region's vulnerability to accelerated sea level rise is of utmost importance. The Intergovernmental Panel on Climate Change has developed a common methodology for this purpose. Studies carried out according to this Common Methodology have been compared and combined, from which general conclusions on local, regional and global vulnerability have been drawn, the latter in the form of a Global Vulnerability Assessment. In order to address the challenge of coping with climate change and accelerated sea level rise, it is essential to foresee the possible impacts, and to take precautionary action. Because of the long lead times needed for creating the required technical and institutional infrastructures, such action should be taken in the short term. Furthermore, it should be part of a broader coastal zone management and planning context. This will require a holistic view, shared by the different institutional levels that exist, along which different needs and interests should be balanced.
Resumo:
The need for building human and institutional capacity has been identified in Agenda 21 of the UNCED conference as well as by a number of international environmental institutions as essential for integrated coastal management (ICM) and sustainable development in developing coastal states. There is a growing need for coastal management practitioners and organizations with expertise in planning and implementation for ICM. The application of strategies for institutional development and building human capacity in coastal management and other fields shows that short-term intensive training efforts and long-term institutional strengthening programs are appropriate to address the issues and needs of ICM. An overview of the experience of the URI/USAID International Coastal Resources Management Program in Sri Lanka, Thailand and Ecuador presents lessons learned for strengthening ICM efforts in developing countries.