18 resultados para Arché

em Chinese Academy of Sciences Institutional Repositories Grid Portal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The snap-through and pull-in instabilities of the micromachined arch-shaped beams under an electrostatic loading are studied both theoretically and experimentally. The pull-in instability that results in a system collision with an electrode substrate may lead to a system failure and, thus, limits the system maximum displacement. The beam/plate structure with a flat initial configuration under an electrostatic loading can only experience the pull-in instability. With the different arch configurations, the structure may experience either only the pull-in instability or the snap-through and pull-in instabilities together. As shown in our computation and experiment, those arch-shaped beams with the snap-through instability have the larger maximum displacement compared with the arch-shaped beams with only the pull-in stability and those with the flat initial configuration. The snap-through occurs by exerting a fixed load, and the structure experiences a discontinuous displacement jump without consuming power. Furthermore, after the snap-through jump, the structures are demonstrated to have the capacity to withstand further electrostatic loading without pull-in. Those properties of consuming no power and increasing the structure deflection range without pull-in is very useful in microelectromechanical systems design, which can offer better sensitivity and tuning range.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper extends two-dimensional model of symmetric magnetostatic flux arches confined in stratified atmospheres (Zhang and Hu, 1992, 1993) to asymmetric models. Numerical results show that the flux structure is influenced greatly by the boundary condition of magnetic field, the force-free factor, the atmospheric pressure distribution and the position of footpoints (especially the width ratio of outlet to entrance, which differs from symmetric case).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An arch-shaped beam with different configurations under electrostatic loading experiences either the direct pull-in instability or the snap-through first and then the pull-in instability. When the pull-in instability occurs, the system collides with the electrode and adheres to it, which usually causes the system failure. When the snap-through instability occurs, the system experiences a discontinuous displacement to flip over without colliding with the electrode. The snap-through instability is an ideal actuation mechanism because of the following reasons: (1) after snap-through the system regains the stability and capability of withstanding further loading; (2) the system flips back when the loading is reduced, i.e. the system can be used repetitively; and (3) when approaching snap-through instability the system effective stiffness reduces toward zero, which leads to a fast flipping-over response. To differentiate these two types of instability responses for an arch-shaped beam is vital for the actuator design. For an arch-shaped beam under electrostatic loading, the nonlinear terms of the mid-plane stretching and the electrostatic loading make the analytical solution extremely difficult if not impossible and the related numerical solution is rather complex. Using the one mode expansion approximation and the truncation of the higher-order terms of the Taylor series, we present an analytical solution here. However, the one mode approximation and the truncation error of the Taylor series can cause serious error in the solution. Therefore, an error-compensating mechanism is also proposed. The analytical results are compared with both the experimental data and the numerical multi-mode analysis. The analytical method presented here offers a simple yet efficient solution approach by retaining good accuracy to analyze the instability of an arch-shaped beam under electrostatic loading.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this paper, a complete set of MHD equations have been solved by numerical calculations in an attempt to study the dynamical evolutionary processes of the initial equilibrium configuration and to discuss the energy storage mechanism of the solar atmosphere by shearing the magnetic field. The initial equilibrium configuration with an arch bipolar potential field obtained from the numerical solution is similar to the configuration in the vicinity of typical solar flare before its eruption. From the magnetic induction equation in the set of MHD equations and dealing with the non-linear coupling effects between the flow field and magnetic field, the quantitative relationship has been derived for their dynamical evolution. Results show that plasma shear motion at the bottom of the solar atmosphere causes the magnetic field to shear; meanwhile the magnetic field energy is stored in local regions. With the increase of time the local magnetic energy increases and it may reach an order of 4×10^25 J during a day. Thus the local storage of magnetic energy is large enough to trigger a big solar flare and can be considered as the energy source of solar flares. The energy storage mechanism by shearing the magnetic field can well explain the slow changes in solar active regions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The magnetic flux tube concentrating strong magnetic field is the basic configuration of magneticfield in the solar atmosphere. In the present paper, the equilibrium of isolated magnetic flux tube inthe solar atmosphere is discussed. In the viewpoint of mathematics, the boundary condition is nonlinearand the position of boundary needs to be determined by the physical condition although the equation ofmagnetic potential is linear for the linear force-free field. Analytical solutions to the arches of bothuniform circular cross-section and non-uniform cross section have been obtained. The results show thatthe nonlinear problem may have or not have any solution according to different azimuthal components of the magnetic field; the number of solutions to the nonlinear problem is four at most, and two in some cases. In the present paper, the analytical solutions to the approximations of both fat and slender arches are given in detail, and the general features of magnetic arch structure are shown.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A new species of the subfamily Barbinae, Tor yingjiangensis, is recognized from Yunnan province, China. It can be distinguished from other Tor species by the following combination of characters: last simple dorsal-fin ray osseous and non-serrated; no forward directed predorsal procumbent spine; head length considerably longer than body depth; no tubercles on the snout or sides of the face; 18-20 gill rakers on the outside of first gill arch; 24-26 lateral line scales; median lobe of lower lip short, its posterior margin truncate, not extending to the vertical across the inner corners of the mouth; and the condition of the lower lip consistent in individuals of different sizes. The new species has been misidentified previously as Tor putitora (Hamilton, F. 1822. An account of the fishes found in the River Ganges and its Branches. Edinburgh & London. 405 pp), which occurs in the Ganges and Indus River basins. The new species can easily be distinguished from T. putitora by having 3-3.5 (vs. 2.5) scales from lateral line to pelvic-fin origin, shorter caudal peduncle length (13.0% vs. 17.2% of standard length), lesser body depth (26.4% vs. 24.0% of standard length) and longer caudal peduncle depth (12.0% vs. 10.9% of standard length), no longitudinal stripe present along side of body, and eyes visible in ventral view of head.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Through the comparative analysis of primary freshwater fishes in Chinese continent and the Taiwan Island, we summarize the three distinctions of distribution of freshwater fishes in these areas: (i) there exists a high similarity of freshwater fish fauna between Taiwan and the southeastern shore of the continent; (ii) some species of freshwater fish are found both in the Taiwan Island and East Himalayans; (iii) different freshwater fishes have different distributions in island arch of western Pacific where Taiwan is located, but the distribution pattern shows a similarity to that of adjacent continent. The characteristic distributions of the fishes are closely related to the change in paleogeography and geology in the area. The parsimony analysis of endemicity (PAE analysis) indicates that the three distribution patterns can be explained by the vicariance theory.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Seasonal variations in a population of the monogenean Ancyrocephalus mogurndae Gussev, 1955 were investigated on gills of cage-cultured mandarin fish, Siniperca chuatsi (Basilewsky), during the period from April 1994 to April 1995. The abundance of A. mogurndae peaked in late spring and summer. Prevalence was high (75-100 %) throughout the study period, and did not vary significantly between months. More than 50 % of all monogeneans were found on the first and second gill arches, except one occasion when the fourth gill arch had the majority in April 1995. The niche breadths were significantly correlated with the population abundance. A coexistent parasitic myxosporean, Henneguya weishanensis Hu, 1965, on the gills of the fish was found to have little influence on the gill-arch preference of the monogenean, although the monogenean abundance was higher in those fish infected with the myxosporean.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Based on the comprehensive interpretation and study of the Neogene fracture system and diapiric structure, it can be concluded that the diapiric structures, high-angle fractures and vertical fissure system are the main gas-bearing fluid influx sub-system for gas hydrate geological system in Shenhu Area, northern South China Sea. The Neogene fractures widely developed in the study area may be classed into two groups: NW (NNW)-trending and NE (NNE)-trending. The first group was active in the Late Miocene, while the second one was active since the Pliocene. The NE (NNE)-trending fractures were characterized by lower activity strength and larger scale, and cut through the sediment layers deposited since the Pliocene. Within the top sediment layers, the high-angle fracture and vertical fissure system was developed. The diapiric structures display various types such as a turtle-back-like arch, weak piercing, gas chimney, and fracture (or crack, fissure). On the seismic profile, some diapiric structures show the vertical chimney pathway whose top is narrow and the bottom is wide, where some ones extend horizontally into pocket or flower-shaped structures and formed the seismic reflection chaotic zones. Within the overlying sediment layers of the diapiric structure, the tree branch, flower-shaped high-angle fractures and vertical fissures were developed and became the pathway and migration system of the gas-bearing fluid influx. In the study area, the diapiric structures indicate a high temperature/over pressure system ever developed. Closely associated and abundant bright-spots show the methane-bearing fluid influx migrated vertically or horizontally through the diapiric structures, high-angle fractures and vertical fissures. In the place where the temperature and pressure conditions were favor for the formation of gas hydrate, the hydrate reservoir deposition sub-system was developed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dam is the key main works in the construction of water power. The success or failure of the construction of the dam mainly depends on the stability of the dam foundation. The double curvature arch dam-XiaoWan Dam is the highest one among the dams with the same type in the world, and the water thrust acted on it reaches ton, so the rock bearing capacity of dam foundation becomes more important. Because of the high and steep valley-side slope, the large scale of excavation and the complex body type of excavation, it is prominent that the problem of stress release of the rock mass in dam foundation. More great attentions should be paid for the stability and the degraded of rock properties of rock mass induced by the stress release. In this paper, the phenomena of stress release of rock mass in XiaoWan Dam foundation and its mechanisms were analyzed based on the collection of data, the detailed field engineering investigations, measurement of the rock mass and the 2D numerical calculations. The rock mass under the foundation is weak-weathered to intact, the quality of which is good. After excavation of the foundation, the rock mass near the slope surface occurred extend, stretch and stick-slip along original textures till the new fracture surface formed. Then platy structure of the rock mass takes on. The rock mass in the dam foundation occur resilience due to stress release towards free faces with the characteristics of time effect and localized deformation. In-situ measurements show that the rock mass near the surface are degraded. The stress release induced by excavation is a process of the interaction between engineering structures and geologic body. The stress release of rock mass in dam foundation is related to the changed degree of geometrical conditions. The rock near excavation surface failed nearly under uniaxial stresses. The bending-breaking mechanism of plate girder can interpret the failure model of the rock mass with platy structure in dam foundation slope. In essence, the stress release is the change of stress field including the change of directions and magnitudes of stress induced by excavation, which can induce the comedown of the safety margin. In this paper, the inducing conditions of stress release were calculated by numerical analyses. Moreover, from the point of view that the change of stress field, the coefficient of K, i.e. the variable load coefficient was proposed. Then the law of the change of it is interpreted. The distributional characteristics of fracture zone were expressed by the coefficient. The stress release of hard rock has the characteristic of localization. The measuring technique of sound wave can not reflect the small cracks in this kind of rock mass due to stress release. So, the spectral analysis method was proposed. At the same time, the application foreground in engineering of the Stockwell Time-Frequency- Spectrum method was discussed with a view to the limitation of it.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Xiao-wan Power Station is the second highest arch dam in the world under construction. The height of the dam is about 292m. Large-scale excavation in the dam foundation of Xiao-wan Power Station has brought intensive unloading phenomenon. We collected a large number of firsthand data on unloaded rock mass in dam foundation, which supplies a natural testing ground for researching unloaded rock mass after excavation. Detailed study was carried out on the parameters of unloaded rock mass in the dam foundation of Xiao-wan Power Station. The study is not only importance for the Xiao-wan Power Station, but also has important instruction significance to similar projects in the Southwest of China. In order to study the mechanical parameters of unloaded rock mass, large field and laboratory tests were carried out. The test results showed the size effect of the sample is obvious. The change of deformation modulus of rock is not obvious. However, the Poisson's ratio of rock is increased under unloaded condition, its value is even more than 0.5. The theoretical forecasted results is accordance to the field tests including sound wave data and deformation monitoring data, which shows the forecasted results were reasonable. The soften yield criterion was adopted in the thesis to study the characteristics of the brittle rock mass in order to simulate their brittle failures. Based on the study results above, the transform of the structural plane network model to the numerical one was carried out, which made it feasible to consider the influence of large amount joints on the mechanical characteristic of rock mass in the numerical analyses. Using a factor, the degree of the damage or strengthen of rock mass can be determined rapidly, which proposed a rapid and feasible method for the determination of the parameters of rock mass.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Based on geophysical and geological data in Jiyang depression, the paper has identified main unconformity surfaces (main movement surfaces) and tectonic sequences and established tectonic and strata framework for correlation between different sags. Based on different sorts of structural styles and characteristics of typical structures, the paper summarized characteristics and distribution of deep structures, discussed evolution sequence of structure, analyzed the relation between tectonic evolution and generation of petroleum. The major developments are as following: Six tectonic sequences could be divided from bottom to top in the deep zone of Jiyang depression. These tectonic sequences are Cambrian to Ordovician, Carboniferous to Permian, lower to middle Jurassic, upper Jurassic to lower Cretaceous, upper Cretaceous and Kongdian formation to the fourth member of Shahejie formation. The center of sedimentation and subsidence of tectonic sequences distinguished from each other in seismic profiles is controlled by tectonic movements. Six tectonic evolution stages could be summarized in the deep zone in Jiyang depression. Among these stages, Paleozoic stage is croton sedimentation basin; Indosinian stage, open folds of EW direction are controlled by compression of nearly SN direction in early Indosinian (early to middle Triassic) while fold thrust fault of EW – NWW direction and arch protruding to NNE direction are controlled by strong compression in late Indosinian (latter Triassic); early Yanshanian stage (early to middle Jurassic), in relatively weak movement after Indosinian compressional orogeny, fluviolacustrine is deposited in intermontane basins in the beginning of early Yanshanian and then extensively denudated in the main orogenic phase; middle Yanshanian (late Jurassic to early Cretaceous), strike-slipping basins are wide distribution with extension (negative reversion) of NW – SE direction; latter Yanshanian (late Cretaceous), fold and thrust of NE – NNE direction and positive reversion structure of late Jurassic to early Cretaceous strike-slipping basin are formed by strong compression of NW–SE direction; sedimentation stage of Kongdian formation to the fourth member of Shahejie formation of Cenozoic, half graben basins are formed by extension of SN direction early while uplift is resulted from compression of nearly EW direction latterly. Compression system, extension system and strike-slip system are formed in deep zone of Jiyang depression. According to identifying flower structure of seismic profiles and analysis of leveling layer slice of 3D seismic data and tectonic map of deep tectonic interface, strike-slip structures of deep zone in Jiyang depression are distinguished. In the middle of the Jiyang depression, strike-slip structures extend as SN direction, NNW direction in Huimin sag, but NNE in Zhandong area. Based on map of relict strata thickness, main faults activity and regional tectonic setting, dynamic mechanisms of deep structure are preliminary determination. The main reason is the difference of direction and character of the plate’s movement. Development and rework of multi-stage tectonic effects are benefit for favorable reservoir and structural trap. Based on tectonic development, accumulation conditions of deep sub-sags and exploration achievements in recent years, potential zones of oil-gas reservoir are put forward, such as Dongying sag and Bonan sag.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This thesis bases on horizontal research project “The research about the fine structure and mechanical parameters of abutment jointed rock mass of high arch dam on Jinping Ⅰ Hydropower Station, Yalong River” and “The research about the fine structure and mechanical parameters of the columnar basalt rock mass on Baihetan Hydropower Station, Jinsha River”. A rounded system about the fine structure description and rock mass classification is established. This research mainly contains six aspects as follow: (1) Methods about fine structure description of the window rock mass; (2) The window rock mass classification about the fine structure; (3) Model test study of intermittent joints; (4) Window rock mass strength theory; (5) Numerical experimentations about window rock mass; (6) The multi-source fusion of mechanical parameters based on Bayes principle. Variation of intact rock strength and joint conditions with the weathering and relaxation degree is studied through the description of window rock mass. And four principal parameters: intact rock point load strength, integration degree of window rock mass, joint conditions, and groundwater condition is selected to assess the window rock mass. Window rock mass is classified into three types using the results of window rock mass fine structure description combined with joints develop model. Scores about intact rock strength, integrality condition, divisional plane condition and groundwater conditions are given based on window rock mass fine structure description. Then quality evaluation about two different types of rock mass: general joint structure and columnar jointing structure are carried out to use this window rock mass classification system. Application results show that the window rock mass classification system is effective and applicable. Aimed at structural features of window structure of “the rock mass damaged by recessive fracture”, model tests and numerical models are designed about intermittent joints. By conducting model tests we get shear strength under different normal stress in integrated samples, through samples and intermittent joints samples. Also, the changing trends of shear strength in various connectivity rates are analyzed. We numerically simulate the entire process of direct shear tests by using PFC2D. In order to tally the stress-strain curve of numerical simulation with experimental tests about both integrated samples and through samples, we adjust mechanical factors between particles. Through adopting the same particle geometric parameter, the numerical sample of intermittent joints in different connective condition is re-built. At the same time, we endow the rock bridges and joints in testing samples with the fixed particle contacting parameters, and conduct a series of direct shear tests. Then the destructive process and mechanical parameters in both micro-prospective and macro-prospective are obtained. By synthesizing the results of numerical and sample tests and analyzing the evolutionary changes of stress and strain on intermittent joints plane, we conclude that the centralization of compressive stress on rock bridges increase the shear strength of it. We discuss the destructive mechanics of intermittent joints rock under direct shear condition, meanwhile, divide the whole shear process into five phases, which are elasticity phase, fracture initiation phase, peak value phase, after-peak phase and residual phase. In development of strength theory, the shear strength mechanisms of joint and rock bridge are analyzed respectively. In order to apply the deducted formulation conveniently in the real projects, a relationship between these formulations and Mohr-Coulomb hypothesis is built up. Some sets of numerical simulation methods, i.e. the distinct element method (UDEC) based on in-situ geology mapping are developed and introduced. The working methods about determining mechanical parameters of intact rock and joints in numerical model are studied. The operation process and analysis results are demonstrated detailed from the research on parameters of rock mass based on numerical test in the Jinping Ⅰ Hydropower Station and Baihetan Hydropower Station. By comparison,the advantages and disadvantages are discussed. Results about numerical simulation study show that we can get the shear strength mechanical parameters by changing the load conditions. The multi-source rock mass mechanical parameters can be fused by the Bayes theory, which are test value, empirical value and theoretical value. Then the value range and its confidence probability of different rock mass grade are induced and these data supports the reliability design.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

It is a basic work to ascertain the parameters of rock mass for evaluation about stability of the engineering. Anisotropism、inhomogeneity and discontinuity characters of the rock mass arise from the existing of the structural plane. Subjected to water、weathering effect、off-loading, mechanical characters of the rock mass are greatly different from rock itself, Determining mechanical parameters of the rock mass becomes so difficult because of structure effect、dimension effect、rheological character, ‘Can’t give a proper parameter’ becomes one of big problems for theoretic analysis and numerical simulation. With the increment of project scale, appraising the project rock mass and ascertaining the parameters of rock mass becomes more and more important and strict. Consequently, researching the parameters of rock mass has important theoretical significance and actual meaning. The Jin-ping hydroelectric station is the first highest hyperbolic arch dam in the world under construction, the height of the dam is about 305m, it is the biggest hydroelectric station at lower reaches of Yalong river. The length of underground factory building is 204.52m, the total height of it is 68.83m, the maximum of span clearance is 28.90m. Large-scale excavation in the underground factory of Jin-ping hydroelectric station has brought many kinds of destructive phenomenon, such as relaxation、spilling, providing a precious chance for study of unloading parameter about rock mass. As we all know, Southwest is the most important hydroelectric power base in China, the construction of the hydroelectric station mostly concentrate at high mountain and gorge area, basically and importantly, we must be familiar with the physical and mechanical character of the rock mass to guarantee to exploit safely、efficiently、quickly, in other words, we must understand the strength and deformation character of the rock mass. Based on enough fieldwork of geological investigation, we study the parameter of unloading rock mass on condition that we obtain abundant information, which is not only important for the construction of Jin-ping hydroelectric station, but also for the construction of other big hydroelectric station similar with Jin-ping. This paper adopt geological analysis、test data analysis、experience analysis、theory research and Artificial Neural Networks (ANN) brainpower analysis to evaluate the mechanical parameter, the major production is as follows: (1)Through the excavation of upper 5-layer of the underground powerhouse and the statistical classification of the main joints fractures exposed, We believe that there are three sets of joints, the first group is lay fracture, the second group and the fourth group are steep fracture. These provide a strong foundation for the following calculation of and analysis; (2)According to the in-situ measurement about sound wave velocity、displacement and anchor stress, we analyses the effects of rock unloading effect,the results show a obvious time-related character and localization features of rock deformation. We determine the depth of excavation unloading of underground factory wall based on this. Determining the rock mass parameters according to the measurement about sound wave velocity with characters of low- disturbing、dynamic on the spot, the result can really reflect the original state, this chapter approximately the mechanical parameters about rock mass at each unloading area; (3)Based on Hoek-Brown experienced formula with geological strength index GSI and RMR method to evaluate the mechanical parameters of different degree weathering and unloading rock mass about underground factory, Both of evaluation result are more satisfied; (4)From the perspective of far-field stress, based on the stress field distribution ideas of two-crack at any load conditions proposed by Fazil Erdogan (1962),using the strain energy density factor criterion (S criterion) proposed by Xue changming(1972),we establish the corresponding relationship between far-field stress and crack tip stress field, derive the integrated intensity criterion formula under the conditions of pure tensile stress among two line coplanar intermittent jointed rock,and establish the corresponding intensity criterion for the exploratory attempt; (5)With artificial neural network, the paper focuses on the mechanical parameters of rock mass that we concerned about and the whole process of prediction of deformation parameters, discusses the prospect of applying in assessment about the parameters of rock mass,and rely on the catalog information of underground powerhouse of Jinping I Hydropower Station, identifying the rock mechanics parameters intellectually,discusses the sample selection, network design, values of basic parameters and error analysis comprehensively. There is a certain significance for us to set up a set of parameters evaluation system,which is in construction of large-scale hydropower among a group of marble mass.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Block theory is an effective method on stability analysis of fractured rigid rock mass. There are a lot of discontinuous planes developed in rock mass of Jinping II hydropower station conveyor tunnel, so the stability of conveyor tunnel is related with whether there are unstable blocks on excavation planes. This paper deals with the stability of conveyor tunnel with stereo-analytical method for block theory on the basis of detailed investigation of rock mass data, and makes judgements on the movable blocks sliding types which are induced by all rock discontinuous planes and every excavation plane of conveyor tunnel. A conclusion is obtained that the sliding type of blocks is mainly single sliding, and a relatively few sliding types of double-sided sliding and vertical block falling; Also, the obvious statistical distribution result on movable blocks in conveyor tunnel indicates that there are a bit more instability blocks in left wall, left and right arches than right wall. In this paper, the stochastic probability model is drawn into block theory to study the sliding probability of key block on the basis of detailed investigation of its rock mass data and the development of the discontinuous planes in rock mass of Jinping II hydropower station conveyor tunnel. And some following conclusions are obtained. The relationship between trace length and the probability of instability of key block is inverse ratio. The probability of 1-3m primary joints are relatively higher. Key block containing joints J2 is relatively stable and the reinforcement of the arch would be crucial in the conveyor tunnel. They are all useful to offer effective reinforcement design and have important engineering values.