57 resultados para Quincy Mine


Relevância:

10.00% 10.00%

Publicador:

Resumo:

End-column amperometric detection of 6-mercaptopurine by capillary zone electrophoresis was described with high resolution and speed. The detection conditions were optimized and the electrochemical behavior was observed. Under the optimal conditions: detection potential of 1.2 V ( vs. Ag/AgCl), operating voltage of 15 kV, sample injection of 3 s at 15 kV and 10 mmol/l Na2HPO4 buffer, the detection limit for 6-MP was as low as 1 x 10(-7) mol/L and the linear range was from 5 x 10(-4) to 5 x 10(-6) mol/L with the relative coefficient of 0.995. The RSD of reproducibility for peak current and migration time was 2.5% and 1.2%, respectively. This method was utilized in assay real sample of human mine and bovine serum albumin containing 6-mercaptopurine.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

为研究鄂霍次克海天然气水合物区沉积物古菌、甲烷厌氧氧化古菌和硫酸盐还原细菌的多样性分布,我们以PCR技术为基础构建mcrA、dsrAB和古菌16S rRNA 基因文库。对所获得的序列进行系统进化和统计学分析发现:鄂霍次克海古菌类群主要为Marine Benthic Group D (MBG-D)、Marine Benthic Group B (MBG-B)、Marine Crenarchaeotic Group I(MG- I),另外少量古菌16S rRNA基因序列为Anaerobic Methanotrophs 2c(ANME-2c),主要分布在LV39-25H岩心的表层沉积物中。LV39-40H岩心表层的古菌群落结构与其他六个层位古菌群落结构相比有着显著的差异。mcrA基因序列主要为催化甲烷厌氧氧化的古菌ANME-2(c和d簇),在所研究的各个层位的沉积物中均广泛分布。少量的ANME-1(a簇)发现于LV39-40H岩心表层以下的沉积物中。产甲烷古菌数目不多,集中分布在LV39-25H岩心200cm和LV39-40H岩心180cm的沉积物中。dsrAB基因文库分析表明硫酸盐还原细菌种类丰富,表层沉积物中硫酸盐还原细菌多样性最高。在两个岩心所有层位的沉积物中都有一定数量的克隆属于DSS簇,它们可能与ANME共生催化甲烷的厌氧氧化作用。总之,所有数据表明在鄂霍次克海天然气水合物区存在着较活跃的甲烷厌氧氧化作用,揭示了参与甲烷厌氧氧化作用的微生物群落结构和多样性。 为研究东海内陆架闽浙沿岸泥质区不同深度沉积物中古菌群落垂向分布特征,通过古菌16S rRNA 基因文库共得到473个有效克隆50个OTUs (Operational Taxonomic Units)。16S rRNA基因序列系统进化和统计分析发现古菌分别归属于泉古生菌(Crenarchaeota)和广古生菌(Euryarchaeota),其中以Miscellaneous Crenarchaeotic Group(MCG)为主,仅含少量的MBG-B、South African Gold Mine Euryarchaeotic Group(SAGMEG)、 ANME-3、MG- I和MBG-D。该泥质区沉积物可能存在由ANME-3催化的甲烷厌氧氧化作用,同源序列分析表明其古菌群落分布与周边环境有较大联系。UniFrac与沉积物环境因子分析表明该泥质区古菌群落垂向分布与沉积物有机质含量和粒度变化密切相关。 通过对比发现,鄂霍次克海天然气水合物区甲烷厌氧氧化古菌主要为ANME-2和少量的ANME-1,而东海内陆架泥质区甲烷厌氧氧化古菌仅为极少量的ANME-3;鄂霍次克海天然气水合物区广古生菌和泉古生菌数量各占一半,主要为MBG-D、MBG-B、MG-I。东海内陆架泥质区沉积物古菌序列主要为泉古生菌(MCG)。海域类型的不同以及有机碳含量等环境因子的差异可能是这两个海域古菌群落结构差异的主要原因.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The proposed plan for enrichment of the Sulu Sea, Philippines, a region of rich marine biodiversity, with thousands of tonnes of urea in order to stimulate algal blooms and sequester carbon is flawed for multiple reasons. Urea is preferentially used as a nitrogen source by some cyanobacteria and dinoflagellates, many of which are neutrally or positively buoyant. Biological pumps to the deep sea are classically leaky, and the inefficient burial of new biomass makes the estimation of a net loss of carbon from the atmosphere questionable at best. The potential for growth of toxic dinoflagellates is also high, as many grow well on urea and some even increase their toxicity when grown on urea. Many toxic dinoflagellates form cysts which can settle to the sediment and germinate in subsequent years, forming new blooms even without further fertilization. If large-scale blooms do occur, it is likely that they will contribute to hypoxia in the bottom waters upon decomposition. Lastly, urea production requires fossil fuel usage, further limiting the potential for net carbon sequestration. The environmental and economic impacts are potentially great and need to be rigorously assessed. (C) 2008 Elsevier Ltd. All rights reserved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

本论文以新松公司和山东省科学院的《井下探测救援机器人的研究》项目为依托,展开井下探测救援机器人控制系统的研究。 我国的煤炭资源十分丰富,是世界上最大的煤炭生产国和消费国。我国煤矿大多数为矿工开采,不安全因素很多,矿井自然条件差,加上技术和管理等诸多方面不到位,使得我国煤矿矿井灾害事故频繁发生,人员伤亡十分惨重,煤矿安全形势已经十分严峻。 传统的救援方法只能通过提升绞车、移动式风车等设备清除垃圾,向井下通风,然后再搜救遇险矿工。这种方式危险性大,伤亡人数多,救援周期长,效率低。因此,迫切需要研发替代或部分替代救险队员进入矿井灾害现场进行环境探测和完成搜救任务的煤矿救援机器人,这对煤矿安全生产,建立特种危险环境下的工业救援体系具有十分重要的意义。 本文以沈阳新松公司的井下救援机器人为研究对象,对移动机器人控制体系结构进行了研究。主要工作如下: 从分析当前的体系结构入手,针对井下救援机器人的具体特点和设计要求,设计了一种以混合式体系结构为基础的移动机器人分布式体控制器。这种结构使用一种基于服务的概念,各个服务提供相当的功能,任意组合服务可以获得相应功能的机器人控制器。服务内部基于纵向的层次划分和横向的功能划分,并融合了特定的反应式行为。 本系统的特点是:自主与监控相结合,动作与感知相结合的行为,采用分布式程序的开发方法并且具有相当程度的开放性。在微软的机器人开发仿真平台上对该体系进行了实验仿真,并在新松公司井下救援机器人开发中实现了该系统。

Relevância:

10.00% 10.00%

Publicador:

Resumo:

通过优化知识表达系统中条件属性对决策属性的依赖度,深入研究了粗糙集并与多Agent系统相结合。利用离散粒子群算法,提出一种基于粒子群优化的粗糙集知识约简算法,该算法解决了启发式算法无法全局搜索进行约简的问题。最后通过在矿井中调度信息的应用验证了有效性。

Relevância:

10.00% 10.00%

Publicador:

Resumo:

针对原地雷引信压发测试台存在的问题,提出改进方法和措施;详细介绍了改进后测试台的系统构成以及工作原理。改进前后的对比结果表明,改进型测试台实现了漏检率为0,无链条卡死现象,能够适用4种引信,且外表美观。

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The two major issues in mining industry are work safety and protection of ground environment when carrying on underground mining activities. Cut-and-fill mining method is increasingly applied in China owing to its advantages of controlling ground pressure and protecting the ground environment effectively. However, some cut-and-fill mines such as Jinchuan nickel mine which has big ore body, broken rock mass and high geostress have unique characteristics on the law of ground pressure and rock mass movement that distinguish from other mining methods. There are still many problems unknown and it is necessary for the further analysis. In this dissertation, vast field survey, geology trenching and relative data analysis are carried out. The distribution of ground fissures and the correlation of the fissures with the location of underground ore body is presented. Using of monitoring data by three-dimension fissure meter and GPS in Jinchuan Deposit Ⅱ, the rule of the surface deformation and the reason of ground fissures generation are analyzed. It is shown that the stress redistribution in surrounding rocks resulting from mining, the existence of the void space underground and the influence of on-going mining activities are three main reasons for the occurrence of ground fissures. Based on actual section planes of No.1 ore body, a large-scale 3D model is established. By this model, the complete process of excavation and filling is simulated and the law of rock mass movement and stability caused by Cut-and-fill Mining is studied. According to simulation results, it is concluded that the deformation of ground surface is still going on developing; the region of subsidence on the ground surface is similar with a circle; the area on the hanging wall side is larger than one on the lower wall side; the contour plots show the centre of subsidence lay on the hanging wall side and the position is near the ore body boundary of 1150m and 1250m where ore body is the thickest. Along strike-line of Jinchuan Deposit Ⅱ, the deformation at the middle of filling body is larger than that in the two sides. Because of the irregular ore body, stress concentrates at the boundary of ore body. With the process of excavation and filling, the high stress release and the stress focus disappear on the hanging wall side. The cut-and-fill mechanism is studied based on monitoring data and numerical simulation. The functions of filling body are discussed. In this dissertation, it is concluded that the stress of filling body is just 2MPa, but the stress of surrounding rock mass is 20MPa. We study the surface movement influenced by the elastic modulus of backfill. The minimal value of the elastic modulus of backfill which can guarantee the safety production of cut-and-fill mine is obtained. Finally, based on the real survey results of the horizontal ore layer and numerical simulation, it is indicated that the horizontal ore layer has destroyed. Key words: cut-and-filling mining, 3D numerical simulation, field monitoring, rock mass movement, cut-and-filling mechanism, the elastic modulus of backfill, the horizontal ore layer

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Jinchuan Nickel Mine is the largest underground mine with cut-and-fill mining in China. It is very difficult to be exploited for very low safety stability of rock mass caused by complex geological conditions, developed faults, cracked rock mass and high stress. In this paper, the laws of rock mass movement、mechanics of shaft deformation and destroy were analyzed based on the collection of date, the detailed field engineering investigations, ground movement monitoring by GPS, theoretical analysis and numerical simulation. According to the GPS monitoring result of ground surface movement, there are different ground movement characteristics among the three Mine area of Jinchuan Nickel Mine. In No. 2 Mine area, the ground movement funnel with apparent asymmetry is developing, the influence scope is larger in the up faulted block than in the down faulted block, and the centre of ground movement is moving along the up faulted block direction with increasing depth of mining. Moreover, the tunnels in the corresponding area with the centre of ground movement are damaged seriously. In Longshou Mine area, the ground movement funnel is also developing, but the moving path and the nonlinear characters are more sophisticated because of the long-term effects of open excavating and the effects of underground mining together. In No. 3 Mine area, the underground mining impact on surface is not serious for the time of mining activity is not for long, but the ground movement funnel is also forming now. The underground mining has caused widespread land subsidence in Jinchuan Nickel Mine area, but the phenomena of surface raise appeared in some partial areas of Longshou Mine area and No. 3 Mine area. Analysis proved that the reason for the open pit bottom raise is the slope deformation activation caused by the excavation from open pit into underground mine; and that the raise of surface in No.3 Mine area is caused by the effect of elastic foundation due to underground mining. Although the GPS Monitoring results show the amount of subsidence is increasing constantly, the subsidence rate has a descending tendency with fluctuation in Jinchuan No. 2 Mine area. The subsidence rate curve is a time function and exists an extreme point, the rate increasing before extreme point and decreasing after the extreme point ,but the scale of decreasing rate will be very small after the rate decreasing up to a certain degree, moreover, the characteristics is different among different areas, which have some relation with the distance to the mining section and the dip of the ore body. ArcView is GIS software, which we adopted as a development platform, and made secondary development by its development language “avenue”, through which we developed a ground movement analysis and forecast System for Jinchuan Nickel Mine, which contain three modules : management of ground movement information; analysis and evaluation of ground movement; and ground movement forecast. In the module of evaluation, using the technique of MATLAB6.5 program with VB6.0, the system can achieve the ANN prediction model for GPS monitoring data, data preparation results analysis and model integrated was realized by Avenue programming. Finally, the author analyzed the mechanical of deformation and destroy of the No. 14 shaft, and its repair and artificial-support effectiveness also given detailed demonstration in various aspect. The result showed that the reason for the destroy of No. 14 shaft is underground mining, and being the case, the destroy of the shaft also has its special features, which mainly contains forked stress contour for mining steep ore and fault effect caused by mining activities. The repair and artificial-support played some restrictions on the rock mass movement and deformation, but did not show a strong or marked effect. With the increasing of mining depth and large-scale, the closure rock of the shaft will still deformed, even be destroyed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To deal with the problems in multi-component converted seismic wave exploration in coal fields, the wave propagating features and imaging methods of multi-component converted waves in coal measure strata are researched in this thesis firstly. The relations between viscoelasticity and anisotropy in coal measure strata are analyzed to build KEL-TI model, and which seismic wave propagating and attenuating features are researched. The disadvantages of converted wave imaging methods based on common converted point gather are analyzed and constant velocity no NMO converted wave imaging method based on common scattering point gather is put forward, according to Huygens-Fresnel principle, which applicabilities in the elastic isotropic, elastic TI and KEL-TI situations are discussed. To different model simulation data, the common scattering point gathers’ and stacked profiles’ features are analyzed. The results show that the method can image compressional waves and converted waves with high precision. Secondly, the resolution enhancing theories and methods of converted wave are researched by Rayleigh wave suppressing, converted wave static correction and poststack inverse-Q filtering. 1) The polarization filter is designed by the instantaneous polarization information of seismic waves, and the Rayleigh wave suppressing method is researched. From the spectrum analysis before and after filtering, it can be derived that the amplitudes are kept relatively. 2) To constant velocity no NMO converted wave imaging method, the static correction method based on common equivalent offset point gather is put forward and tested to the actual converted waves. 3) The relation between equivalent quality factor of converted wave, compressional wave quality factor and the ratio of compressional to shear wave velocity is derived. The compressional wave quality inversion method by first arrivals of none-offset VSP is researched, and which is then transformed to the equivalent quality factor to perform inverse-Q filtering of actual converted waves. The result has shown that the method can recover the high frequency energy of converted waves. At last, the theories and methods researched in this thesis are practiced to the 3D3C seismic exploration in Guqiao coal mine in Huainan and achieve good results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conventional 3D seismic exploration cannot meet the demand of high yield and high efficiency safe production in coal mine any more. Now it is urgent to improve the discovery degree of coal mine geological structures for coal production in China. Based on 3D3C seismic exploration data, multi-component seismic information is fully excavated. First systematic research on 3D3C seismic data interpretation of coal measure strata is carried out. Firstly, by analyzing the coal measure strata, the seismic-geologic model of coal measure strata is built. Shear wave logging is built by using regression analysis. Horizon calibration methods of PP-wave and PS-wave are studied and the multi-wave data are used together to interpret small faults. Using main amplitude analysis technology, small faults which cannot be found from PP-wave sections can be interpreted from the low frequency PS-wave sections. Thus, the purpose to applying PS-wave data to fine structure assistant interpretation is achieved. Secondly, PP- and PS-wave post-stack well constrained inversion methods of coal measure strata are studied. Joint PP- and PS-wave post-stack inversion flow is established. More attribute parameters, which are applied in fine lithology interpretation of coal measure strata, are obtained from combinations of the inversion results. Exploring the relation between rock with negative Poisson’s ratio and anisotropy, fracture development in coal seam are predicted. Petrophysical features of coal measure strata are studied, and the relations between elastic parameters and lithology, fluid and physical properties are established. Inversions of the physical parameters such as porosity, permeability and water saturation, which reflect lithology and fluid property, are obtained. Finally, the approaches of shear wave splitting and Thomsen parameters inversion, which provide new ideas for seismic anisotropy interpretation of coal measure strata, are studied to predict fracture development. The results of practical application indicate that the methods in this paper have good feasibility and applicability. They have positive significance for high yield and high efficiency safe production in coal mine.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There are two major problems that have been concerned all the times, which are the mechanics characters of joint rock mass and the criterion for stability of engineering rock. Aim at the two problems, several works were conducted as follow: (1) Firstly, the mechanics characters of rock mass was studied by means of the Distinct Element Code. Subsequently, it was studied that the sensibility of joint surface roughness, strength of joint wall, joint stiffness ( i.e. tangential and normal stiffness) on the rock mass strength. (2) Based on the experimental rock mass classification methods of RMR and GSI, the program of “Parameters Calculation of the Rock Mass ” was developed. It has realized the rapid choice of rock mass parameters. (3) The concept of Representive Element Volume was induced based on the study of dimensional effect of rock mass. The Representive Element Volume of the horizontal and vertical pillar (ab. Two Pillars ) in the 2nd zone of Jinchuan mine were gained by the Geology Statistic Method and the Distinct Element Code. And then, the strength and deformatiom parameters of rock mass of the Two Pillars were obtained through numerical experiment. (4) From the confining depressure after thriaxial compression test of rock sample, it was concluded that the failure of rock is caused mainly by the lateral deformation and energy release happened during the confining depressure processure. The criterion of plastic energy catastrophe of rock engineering failure was proposed and validated. Subsquently, the stability of the horizontal pillar and Qianjiangping landslide in Three Gorges was judged by means of above-mentioned method. (5) Based on the fact there is a phenomenon of increasing energy concentration while the rock mass was compressed, rock information entropy (i.e. energy distribution entropy) was proposed. And it was revealed that there was change of energy distribution entropy while the rock mass was compressed to failure.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Xinli mine area of Sanshandao mine is adjacent to the Bohai Sea and its main exploitable ore deposit occurs in the undersea rock mass. The mine is the biggest undersea gold mine of China after production. The mine area faces a latent danger of water bursting, even sudden seawater inrush. There is no mature experience in undersea mining in China so far. The vein ore deposit is located in the lower wall of a fault; its possible groundwater sources mainly include bittern, Quaternary pore water and modern seawater. To ensure the safety of undersea mining, to survey the flooding conditions of the ore deposit using proper measures and study the potential seawater inrush pattern are the key technical problems. With the Xinli mine area as a case study, the engineering geological conditions of the Xinli mine area are surveyed in situ, the regional structural pattern and rock mass framework characteristics are found out, the distribution of the structural planes are modeled by a Monte Carlo method and the connectivity coefficients of rock mass structural planes are calculated. The regional hydro-geological conditions are analyzed and the in-situ hydro-geological investigation and sampling are performed in detail, the hydrochemistry and isotopes testing and groundwater dynamic monitoring are conducted, the recharge, runoff, discharge conditions are specified and the sources of flooding are distinguished. Some indices are selected from the testing results to calculate the proportion of each source in some water discharge points and in the whole water discharge of the Xinli mine area. The temporal and spatial variations of each water source of the whole ore deposit flooding are analyzed. According to the special project conditions in the Xinli mine area, the permeability coefficient tensors of the rock mass in Xinli mine area are calculated based on a fracture geometry measurement method, in terms of the connectivity and a few hydraulic testing results, a modified synthetic permeability coefficient are calculated. The hydro-geological conceptual and mathematical model are established,the water yield of mine is predicted using Visual Modflow code. The spreading law of surrounding rock mass deformation and secondary stress are studied by numerical analysis; the intrinsic mechanism of the faults slip caused by the excavation of ore deposit is analyzed. The results show that the development of surrounding rock mass deformation and secondary stress of vein ore deposit in the lower wall of a fault, is different from that in a thick-big ore deposit. The secondary stress caused by the excavation of vein ore deposit in the lower wall of a fault, is mainly distributed in the upper wall of the fault, one surface subsidence center will occur. The influences of fault on the rock mass movement, secondary stress and hydro-geological structures are analyzed; the secondary stress is blocked by the fault and the tensile stress concentration occurs in the rock mass near the fault, the original water blocking structure is destructed and the permeable structure is reconstructed, the primary structural planes begin to expand and newborn fissures occur, so the permeability of the original permeable structure is greatly enhanced, so the water bursting will probably occur. Based on this knowledge, the possible water inrush pattern and position of the Xinli mine area are predicted. Some computer programs are developed using object-oriented design method under the development platform Visual Studio.Net. These programs include a Monte Carlo simulation procedure, a joint diagrammatizing procedure, a structural planes connectivity coefficient calculating procedure, a permeability tensor calculating procedure, a water chemical formula edit and water source fixture conditions calculating procedure. A new computer mapping algorithm of joint iso-density diagram is raised. Based on the powerful spatial data management and icon functions of Geographic Information System, the pit water discharge dynamic monitoring data management information systems are established with ArcView.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A large number of catastrophic accidents were aroused by the instability and destruction of anti-dip rock masses in the worldwide engineering projects, such as hydropower station, mine, railways and so on. Problems in relation to deformation and failure about anti-dip rock slopes are significant for engineering geology research. This dissertation takes the Longpan slope in the Jinsha River as a case to study the deformation mechanism of large-scale anti-dip rock masses and the slope stability analysis method. The primary conclusions are as follows. The Dale Reach of Jinsha River, from Longpan to the debouchment of Chongjiang tributary, is located in the southeastern margin of the Qinghai-Tibet Plateau. Longpan slope is the right embankment of Dale dam, it is only 26 km to the Shigu and 18 km to Tiger Leaping Gorge. The areal geology tectonic structures here area are complicated and blurry. Base on the information of geophysical exploration (CSAMT and seismology) and engineering geological investigation, the perdue tectonic pattern of Dale Reach is put forward for the first time in this paper. Due to the reverse slip of Longpan fault and normal left-rotation of Baihanchang fault, the old faulted valley came into being. The thick riverbed sediments have layered characters of different components and corresponding causes, which attribute to the sedimentary environments according with the new tectonic movements such as periodic mountain uplifting in middle Pleistocene. Longpan slope consists of anti-dip alternate sandstone and slate stratums, and the deformable volume is 6.5×107m3 approximately. It was taken for an ancient landslide or toppling failure in the past so that Dale dam became a vexed question. Through the latest field surveying, displacement monitoring and rock masses deforming characters analyses, the geological mechanism is actually a deep-seated gravitational bending deformation. And then the discrete element method is used to simulate the deforming evolution process, the conclusion accords very well with the geo-mechanical patterns analyses. In addition strength reduction method based on DEM is introduced to evaluate the factor of safety of anti-dip rock slope, and in accordance with the expansion way of the shear yielding zones, the progressive shear failure mechanism of large-scale anti-dip rock masses is proposed for the first time. As an embankment or a close reservoir bank to the lower dam, the stability of Longpan slope especially whether or not resulting in sliding with high velocity and activating water waves is a key question for engineering design. In fact it is difficult to decide the unified slip surface of anti-dip rock slope for traditional methods. The author takes the shear yielding zones acquired form the discrete element strength reduction calculation as the potential sliding surface and then evaluates the change of excess pore pressure and factor of stability of the slope generated by rapid drawdown of ponded water. At the same time the dynamic response of the slope under seismic loading is simulated through DEM numerical modeling, the following results are obtained. Firstly the effective effect of seismic inertia force is resulting in accumulation of shear stresses. Secondly the discontinuous structures are crucial to wave transmission. Thirdly the ultimate dynamic response of slope system takes place at the initial period of seismic loading. Lastly but essentially the effect of earthquake load to bringing on deformation and failure of rock slope is the coupling effect of shear stresses and excess pore water pressure accumulation. In view of limitations in searching the critical slip surface of rock slope of the existing domestic and international software for limit equilibrium slope stability analyses, this article proposes a new method named GA-Sarma Algorithm for rock slope stability analyses. Just as its name implies, GA-Sarma Algorithm bases on Genetic Algorithm and Sarma method. GA-Sarma Algorithm assumes the morphology of slip surface to be a broken line with traceability to extend along the discontinuous surface structures, and the slice boundaries is consistent with rock mass discontinuities such as rock layers, faults, cracks, and so on. GA-Sarma Algorithm is revolutionary method that is suitable for global optimization of the critical slip surface for rock slopes. The topics and contents including in this dissertation are closely related to the difficulties in practice, the main conclusions have been authorized by the engineering design institute. The research work is very meaningful and useful for the engineering construction of Longpan hydropower station.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bayan Obo REE-Nb-Fe ore deposit is the largest REE deposit in the world. Owing to its unique type and tremendous economic value, this deposit has widely attracted interests from geological researchers and vast amount of scientific data have been accumulated. However, its genesis, especially ore-forming age and REE sources, have been under dispute for a long time. On the basis of previous research works, this paper mainly conducts studies on the Early Paleozoic ore-forming event in the Bayan Obo deposit. The following results and conclusions can be suggested: Sm-Nd isotopic analytical results of bastnaesite, beloeilite, albite and fluorite samples from a coarse-crystalline ore lode present an isochron age of 436±35Ma. Besides, Rb-Sr isotope dating of the coarse-crystalline biotite lode that intruded into banded ores gives an isochron age of 459±39Ma. The two ages verify the exist of Early Paleozoic ore-forming event at Bayan Obo, which characterized by extensive netted mineralization of REE fluorocarbonates, aeschynite and monazite, accompanied by widely fluorite-riebeckite-aegirine-apatite alteration. Sr-Nd isotope composition of vein minerals is located between EMI and ancient lower crust component in the ISr(t)-εNd(t) correlation diagram, indicating that there is a crustal contamination during veined mineralization. A large area late Paleozoic granitoids are distributed in the southeast region of east open pit of the mine. The granitoids intruded directly into the ore-bearing dolomite, and produced intense skarnization. Moreover, at 650-660m of the drill core on 22 line and 1598m level flat in the south of East Open Pit, we firstly found skarnization rocks. Single grain and low background Rb-Sr isochrone dating on phlogopite in skarn gives 309±12Ma. Considering the intruded contacting relationship, the late Paleozoic granitoids, already extended to the under part of REE ore bodies, must be posterior to the latest intense REE mineralization, and is only a destructive tectonic and magmatic activity. Fluid inclusion types of fluorite in the Bayan Obo deposit consist of multiphase daughter mineral-bearing inclusion, two or three phase CO2-bearing inclusion and two phase aqueous inclusion. Petrography, laser Raman analysis and microthermometry study indicate that the fluids involving in REE-Nb-Fe mineralization at Bayan Obo might be mainly of H2O-CO2-NaCl-(F-REE) system. The presence of REE-carbonate as a daughter mineral in fluid inclusions shows that the original ore-forming fluids are rich in REE elements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Rockmass movement due to mining steep metallic ore body is a considerable question in the surface movement and deformation issue caused by underground mining. Research on coal mining induced rockmass movement and its prediction problem have been performed for a long-term, and have achieved great progress at home and abroad. However, the rockmass movement caused by mining steep metal mine is distinctivly different from coal seam mining.. Existing surface movement laws and deformation prediction methods are not applicable to the rockmass movement caused by mining steep metal mine. So far the home and abroad research to this theory is presently at an early stage, and there isn’t mature theory or practical prediction method, which made a great impact on production. In this paper, the research object—Jinchuan nickel mine, which is typical steep metal mine, characterized by complex geological conditions, developed faults, cracked rockmass, high geostress, and prominent engineering stability problems. In addition, backfill mining method is used in the mine, the features of rockmass movement caused by this mining method are also different from other mining methods. In this paper, the laws of rock mass movement, deformation and destroy mechanism, and its prediction were analyzed based on the collection of data, detailed in-sit engineering geology survey, ground movement monitoring by GPS, theoretical analysis and numerical simulation. According to the GPS monitoring of ground surface movement, ground subsidence basin with apparent asymmetry is developing, the influence scope is larger in the upper faulted block than in the lower faulted block, and the center of ground movement is moving along the upper faulted block direction with increasing depth of mining. During the past half and seven years, the largest settlement has amounted to 1287.5mm, and corresponding horizontal displacement has amounted to 664.6mm. On the ground surface, two fissure belts show a fast-growing trend of closure. To sum up, mining steep metal mine with backfill method also exist the same serious problem of rockmass movement hazards. Fault, as a low intensity zone in rockmass, when it located within the region of mining influence, the change of potential energy mainly consumed in fault deformation associated with rockmass structure surface friction, which is the essence of displacement and stress barrier effects characterized by fault rupture zone. when steep fault located in the tensile deformation region incurred by underground excavation, no matter excavation in hangingwall or in footwall of the fault, there will be additional tensile stress on the vertical fault plane and decrease in the shear strength, and always showing characteristics of normal fault slip, which is the main reason of fault escarpment appeared on the ground surface. The No.14 shaft deformation and failure is triggered by fault activation, which showed with sidewall move, rupture, and break down features as the main form of a concentrated expression of fault effects. The size and orientation of principal stress in surrounding rock changed regularly with mining; therefore, roadway deformation and damage at different stages have different characteristics and distribution models. During the process of mining, low-intensity weak structures surface always showed the most obvious reaction, accompany with surface normal stress decrease and shear strength bring down, to some extent, occurred with relative slide and deformation. Meanwhile, the impact of mining is a relatively long process, making the structure surface effect of roadway deformation and damage more prominent than others under the influence of mining. Roadway surrounding rockmass deformation caused by the change of strain energy density field after excavation mainly belongs to elastic deformation, and the correspondented damage mainly belongs to brittle rupture, in this circumstance, surrounding rockmass will not appear large deformation. The large deformation of surrounding rockmass can only be the deformation associated with structure surface friction or the plastic deformation of itself, which mainly caused by the permanent self-weigh volume force,and long-term effect of mining led to the durability of this deformation Good pitting fill effect and supporting effect of backfill, as well as the friction of rockmass structure surface lead to obvious macro-rockmass movement with long-lag characteristics. In addition, the loss of original intensity and new structure surface arisen increased flexibility in rockmass and fill deformation in structure surface, which made the time required for rockmass potential energy translate into deformation work associated with plastic deformation and structure surface friction consumed much, and to a large extent, eliminated the time needed to do those plastic work during repeated mining, all of which are the fundamental reason of rockmass movement aftereffect more significant than before. Mining steep deposits in high tectonic stress area and in gravity stress area have different movement laws and deformation mechanism. The steep deposit, when the vertical size of the mining areas is smaller than the horizontal size of the orebody, no matter mining in gravity stress area or in high tectonic stress area, they have similar features of ground movement with mining horizontal orebody; contrarily, there will appear double settlement centers on the ground surface under the condition of mining in high tectonic stress area, while there will always be a single center under the other condition. Meanwhile the ground movement lever, scale of mining influence area and macro features of ground movement, deformation and fracture are also different from mining in gravity stress area, and the fundamental reason lies in the impact of orientation of the maximum principal stress on rock movement features in in-site rock stress field. When mining thick and steep deposit, the ground surface movement and deformation characteristic curves are significantly different from excavating the horizontal ore bed and thin steep deposit. According to the features of rockmass movement rate, the development process of mining-induced rockmass movement is divided into three stages: raising stage, steadily stage and gradually decay stage. Considering the actual exploitation situation, GPS monitoring results and macro-characteristics of surface movement, the current subsidence pattern of Jinchuan No.2 mine is in the early stage of development. Based on analysis of surface movement rate, surface subsidence rate increase rapidly when mining in double lever at the same time, and reach its peak until the exploitation model ended. When double lever mining translate into single, production decreased, surface subsidence rate suddenly start to reduce and maintain a relatively low value, and the largest subsidence center will slowly move along with the hangingwall ore body direction with increasing depth of mining, at the same time, the scope and extent of subsidence in footwall ore body will begin magnify, and a sub-settlement center will appear on ground surface, accompanied with the development and closure trend of ground fissure, the surrounding rockmass of shaft and roadway will be confronted to more frequent and severe deformation and failure, and which will have a negative impact on the overall stability of No.2 mine mining. On the premise of continuity of rockmass movement, gray system model can be used in ground rockmass movement prediction for good results. Under the condition of backfill mining step by step, the loose effect of compact status of the hard, broken rockmass led to lower energy release rate, although surrounding rockmass has high elastic energy, loose and damage occurred in the horizontal ore body, which made the mining process safety without any large geological hazards. During the period of mining the horizontal ore body to end, in view of its special “residual support role”, there will be no large scale rockmass movement hazards. Since ground surface movement mainly related to the intensity of mining speed and backfill effect, on the premise of constant mining speed, during the period of mining the horizontal ore body to end, the rate of ground surface rockmass movement and deformation won’t have sudden change.