4 resultados para Logistica layout

em Aquatic Commons


Relevância:

20.00% 20.00%

Publicador:

Resumo:

(4pp.)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Report on Proposed Improvements to Teignmouth Harbour from 15th March, 1971 prepared for the Teignmouth Harbour Commission. It reviews the Scheme III Breakwater along the lines recommended by the Hydraulics Research Station and the implications of deepening the berths at the Eastern Quay to a depth of thirteen feet below chart datum. The layout of the Hydraulics Research Scheme III Breakwater, as described in Para.16 of their Report No. EX489 dated April 1970, is shown on the accompanying Key Plan to a scale of 1:2500. It contains a subsoil survey and boreholes structure. It goes through the permissible draughts of ships and turning area, training wall, deepening of the eastern quay dredging and sewage dispersal.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This communication deals with the design aspect and functions of individual pieces of equipment of a pilot plant of fifty kg capacity for the production of fish protein concentrate (FPC) per day. Design is based on a solvent extraction process of wet pressed cake with an azeotropic mixture of hexane and ethyl alcohol. A flow sheet for the process and equipment layout has been indicated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This communication describes the design aspect and functions of individual pieces of equipment of a pilot plant for the production of fish ensilage based on lactic acid fermentation process. Details about the equipment, process flow sheet and equipment layout of the pilot plant have been given. An attempt has been made to prepare an estimate of the cost of production of liquid ensilage and solid feed mix.