Report on proposed improvements to Teignmouth Harbour


Autoria(s): Lewis & Duvivier
Data(s)

1971

Resumo

This is the Report on Proposed Improvements to Teignmouth Harbour from 15th March, 1971 prepared for the Teignmouth Harbour Commission. It reviews the Scheme III Breakwater along the lines recommended by the Hydraulics Research Station and the implications of deepening the berths at the Eastern Quay to a depth of thirteen feet below chart datum. The layout of the Hydraulics Research Scheme III Breakwater, as described in Para.16 of their Report No. EX489 dated April 1970, is shown on the accompanying Key Plan to a scale of 1:2500. It contains a subsoil survey and boreholes structure. It goes through the permissible draughts of ships and turning area, training wall, deepening of the eastern quay dredging and sewage dispersal.

Formato

application/pdf

Identificador

http://aquaticcommons.org/10896/1/D3.32E%2828%29_Report_on_proposed_improvements_to_Teignmouth_Harbour.pdf

Teignmouth Harbour Commission (1971) Report on proposed improvements to Teignmouth Harbour. London, UK, Lewis & Duvivier, 12pp.

Idioma(s)

en

Publicador

Lewis & Duvivier

Relação

http://aquaticcommons.org/10896/

Palavras-Chave #Limnology #Management #Planning
Tipo

Monograph or Serial Issue

NonPeerReviewed