5 resultados para Civic improvements

em Aquatic Commons


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Data have been collected on fisheries catch and effort trends since the latter half of the 1800s. With current trends in declining stocks and stricter management regimes, data need to be collected and analyzed over shorter periods and at finer spatial resolution than in the past. New methods of electronic reporting may reduce the lag time in data collection and provide more accurate spatial resolution. In this study I evaluated the differences between fish dealer and vessel reporting systems for federal fisheries in the US New England and Mid-Atlantic areas. Using data on landing date, report date, gear used, port landed, number of hauls, number of fish sampled and species quotas from available catch and effort records I compared dealer and vessel electronically collected data against paper collected dealer and vessel data to determine if electronically collected data are timelier and more accurate. To determine if vessel or dealer electronic reporting is more useful for management, I determined differences in timeliness and accuracy between vessel and dealer electronic reports. I also compared the cost and efficiency of these new methods with less technology intensive reporting methods using available cost data and surveys of seafood dealers for cost information. Using this information I identified potentially unnecessary duplication of effort and identified applications in ecosystem-based fisheries management. This information can be used to guide the decisions of fisheries managers in the United States and other countries that are attempting to identify appropriate fisheries reporting methods for the management regimes under consideration. (PDF contains 370 pages)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Catch and effort assessment surveys have been used to assess trends in fish landings in Kenyan waters of Lake Victoria since 1976. Landings reached a maximum of 200000 t annually in 1989-1991 as Nile perch, Lates niloticus (L.), catches increased due to an expansion in stock size and increased fishing effort. CPUE peaked at 180 kg boat day-1 in 1989 and decreased thereafter with increasing effort. By 1998 total Nile perch catches were half those at the beginning of the decade despite increased effort. Catches of Rastrineobola argentea (Pellegrin) have levelled off despite increased effort.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the Report on Proposed Improvements to Teignmouth Harbour from 15th March, 1971 prepared for the Teignmouth Harbour Commission. It reviews the Scheme III Breakwater along the lines recommended by the Hydraulics Research Station and the implications of deepening the berths at the Eastern Quay to a depth of thirteen feet below chart datum. The layout of the Hydraulics Research Scheme III Breakwater, as described in Para.16 of their Report No. EX489 dated April 1970, is shown on the accompanying Key Plan to a scale of 1:2500. It contains a subsoil survey and boreholes structure. It goes through the permissible draughts of ships and turning area, training wall, deepening of the eastern quay dredging and sewage dispersal.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.