33 resultados para Dredging spoil


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Report on Proposed Improvements to Teignmouth Harbour from 15th March, 1971 prepared for the Teignmouth Harbour Commission. It reviews the Scheme III Breakwater along the lines recommended by the Hydraulics Research Station and the implications of deepening the berths at the Eastern Quay to a depth of thirteen feet below chart datum. The layout of the Hydraulics Research Scheme III Breakwater, as described in Para.16 of their Report No. EX489 dated April 1970, is shown on the accompanying Key Plan to a scale of 1:2500. It contains a subsoil survey and boreholes structure. It goes through the permissible draughts of ships and turning area, training wall, deepening of the eastern quay dredging and sewage dispersal.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The last major pearl fishery in the Gulf of Mannar was held in February-March, 1958, when about 4.5 million oysters were collected from the south-west Cheval Paar by dredging. (Sivalingam 1961). Subsequently, two smaller fisheries, one in 1960 and another in 1961 took place. In these two fisheries one million oysters and four hundred thousand oysters respectively were collected from the Cheval paar by dredging. (De Fonselm 1953). Inspections of the Banks were carried out in 1962, 1963, 1964 and 1965. (Balasuriya 1964 and Silva 1965 and 66). Since then inspections were not possible due to one of two reasons or both the non-availability of operational dredges and a suitable vessel for this type of work.The "Pesalai" a 235-ton stern trawler was made available by the Ceylon Fisheries Corporation management for the 1970 inspection. Two new 6-foot dredges turned out by the Government Factory were also available for this work. However, the survey was limited to 3 days-the period for which the vessel had been released. It was further limited to those areas of the banks over 6 fathoms in depth because of the risk in operating a large vessel in shallower depths.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The study was conducted to get an idea about the water quality of the Ashulia beel, and its temporal change over wet and dry seasons due to change of the physicochemical parameters. The water body has become a dumping ground of all kinds of solid, liquid and chemical wastes of bank side population and industries. Encroachment and illegal dredging has become a serious threat for the sound environment of the beel. The water parameters of pH 7.1-7.8 and alkalinity 30-63 mg/l in wet, and pH 7.1-8.4 and alkalinity 90-115 mg/l in dry season, respectively, which were within the standard range of DoE investigation. During wet season, EC 130-310 mg/l, TDS 80-132 mg/l, DO 1.1-2.1 mg/l and BOD -4.4-1.6 mg/l were measured. In dry season, EC 341-442 mg/l, TDS 207-276 mg/l, DO 0.5-2.0 mg/l and BOD 1.0-3.0 mg/l were measured. The comparative analysis showed that most of the water quality parameters of the Ashulia beel were suitable for aquatic organisms including fishes while the DO contents were much lower than the desirable level which may not be suitable for fishes.