556 resultados para Aquatic resources


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although other research studies on areas such as the physical-chemical, nutrients and phytoplankton status of Lake Kyoga systems have been given a lot of attention (e.g. Mungoma 1988 and NaFIRRI 2006), efforts to determine the pollution status of this system, especially by heavy metals as one of the worldwide emerging environmental problems, is still limited. Many trace metals are regarded as serious pollutants of aquatic ecosystems because of their persistence, toxicity and ability to be incorporated into food chains (Mwamburi J., and Nathan O.F., 1997). Given the rapid human population growth and the associated economic activities both within the rural and urban areas in Uganda, such fish production systems are becoming very prone to various kinds of pollution including that by heavy metals. Anthropogenic factors such deforestation, use of chemicals and dumping of metallic products, spillages of fuels from outboard engines and many others and or natural processes involving atmospheric deposition by wind or rain, surface run-offs and streams flows from the catchment introduces heavy metals into the lake environment,.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The mobile water hyacinth, which was produced in growth zones, especially Murchison Bay, was mainly exported to three sheltered storage bays (Thruston, Hannington and Waiya). Between 1996 and May 1998, the mobile form of water hyacinth occupied about 800 ha in Thruston Bay, 750 ha in Hannington Bay and 140 ha in Waiya Bay). Biological control weevils and other factors, including localised nutrient depletion, weakened the weed that was confined to the bays and it sunk around October 1998. The settling to the bottom of such huge quantities of organic matter its subsequent decomposition and the debris from this mass was likely to have environmental impacts on biotic communities (e.g. fish and invertebrate), physico-chemical conditions (water quality), and on socio-economic activities (e.g. at fish landings, water abstraction, and hydro-power generation points). Sunken water. hyacinth debris could also affect nutrient levels in the water column and lead to reduction in the content of dissolved oxygen. The changes in nutrient dynamics and oxygen levels could affect algal productivity, invertebrate composition and fish communities. Socio-economic impacts of dead sunken weed were expected from debris deposited along the shoreline especially at fish landings, water abstraction and hydropower generation points. Therefore, environmental impact assessment studies were carried out between 1998 and 2002 in selected representative zones of Lake Victoria to identify the effects of the sunken water hyacinth biomass

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents data and findings from focus group discussions in study communities selected by the CGIAR Research Program on Aquatic Agricultural Systems (AAS) in the Western Province of Zambia. The discussions focused on cultivated crops and vegetables collected from open fields and consumed as food. Participatory tools for agricultural biodiversity (agrobiodiversity) assessment were used to capture community perspectives on plant species and varietal diversity; factors influencing the availability and use of plants for food; unique, common and rare crop species cultivated in a community, identified through a four-cell analysis methodology; and core problems, root causes, effects and necessary actions to tackle them, using problem tree or situation analysis methods.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Victoria and Kyoga lake basins form the major aquatic system of this study (Fig. I). The two lake basins share a common evolutionary history and have similar native fish faunas (Graham 1929, Worthington 1929). The two main lakes have also had similar impacts by introduction of Nile perch Lates niloticus and therefore these two lakes can be considered to be similar for ichiogeographical purposes. These lake basins have many satellite lakes isolated from one another and from the main lakes Victoria and Kyoga by swamps and other barriers. Some of these satellite lakes still possess stocks of endemic fish species which are almost extinct from the main water bodies. It was therefore considered that understanding of these lakes would contribute to the knowledge base required to solve some of the problems experienced in Lake Victoria and Kyoga especially the loss in trophic diversity arising. The study was carried out in these two main water bodies (Kyoga and Victoria) and on other satellite lakes e.g Wamala, Kachera, Mburo, Kayanja and Kayugi in the Victoria lake basin and lakes Nawampasa, Nyaguo, Agu, Gigate, Lemwa and Kawi in the Kyoga lake basin (Figs. 2, 3, 4, 5 & 6).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The physical-chemical characteristics of any aquatic ecosystem include pH, conductivity, and temperature, water transparency, nutrient and the chlorophyll-a levels. Physical and chemical factors of any ecosystem determine the type and quality of flora present in it and these forms the basis on which the system operates. The elements required in largest amounts for plant productions are carbon, phosphorus, nitrogen, and silicon, which is important for diatoms as a major component of the cell wall. Nutrients may limit algal productivity in the tropics despite the high temperature there allowing rapid nutrient recycling. Nutrients most likely to be limiting African lakes are nitrogen (Talling & Talling 1965; Moss 1969; Lehman & Branstrator 1993, 1994) and phosphorus (Melack.et al l982; Kalff 1983) while silicon may limit diatom growth (Hecky & Kilham 1988). The objective of the study is to investigate the impact of physical-chemical characteristics on the distribution and abundance of organisms in the major aquatic ecosystems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A great part of Uganda is endowed with water bodies in the forms of rivers and open water lakes. These bodies are never alone. They are either flanked or associated with plants, which are adapted to the wet conditions. They are so characteristic that they are part and parcel of the aquatic ecosystems. They occupy various positions depending on the amount of water in the relevant habitats.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Biodiversity values provide objective data and advice from which policy makes could assess the conservation options and determine optimal policies that would balance the needs of conservation with the socia-economic needs of the people in the area.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No. 10 undertaken between 23 rd and 29th April 2012 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, nine monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011and the present one, in April 2012. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants biology and ecology of fishes and food webs fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness) During this survey, baseline assessment of the above mentioned studies was conducted in the reservoir behind the dam, including studies on algae, zooplankton and benthic macroinvertebrates which had been restrained since April 2008. The findings of baseline assessment of the reservoir are also contained in this report and are compared with those obtained from Transect 1(Upstream) and Transect 2 (Downstream).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This monitoring survey No. 11 undertaken between 4th and 9th September 2012 is the second one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The results reported on were from a monitoring survey No.7 undertaken between 4 th and 7th September 2010 during construction period of the Bujagali Hydropower Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far, during construction phase of the project, six monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009, October 2009, April 2010 and the present one, in September 2010. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: I. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aquatic ecosystem of the Upper Victoria Nile is part of a wider complex of water bodies (lakes and rivers) in Uganda that is of immense socioeconomic importance, especially the fisheries. A source of food, income, energy, irrigation and drinking water, the protection, sustainable use and management of the Upper Victoria Nile water resources are vital to Uganda's economy. The Upper Victoria Nile,due to its abundance of socio-economic benefits,provides a significant contribution to Uganda's economy. The fisheries contribute to the sector as a major source of the export earnings, second to coffee (NEMA,1996), sustain small fishing villages,provide income and generally improve nutrition. Apart from the socio-economic significance of the fisheries,the riverine features of the Upper Victoria Nile, especially its hydropower potential,distinguish this river from the rest of the aquatic ecosystems in the country.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this present study therefore is to provide and update the AES Nile Power EIA baseline information on the ecology of the river ecosystem prior to the construction of the dam. The study is intended to provide a basis for evaluating the impact of the project on the river environment, the biological resources associated with it and fisheries socia-economics and the vector/sanitation status. This report presents the findings of the first sampling regime which was conducted between the dates of 6th-13th April 2006 and compared with the AESNP Environmental Impact Assessment findings of the second quarter carried out during 5th-14th April 2000.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bujagali hydropower dam construction is now completed and a reservoir behind the dam has been created, extending all the way up to Kalange-Makwanzi, an upstream transects. During the 10th monitoring survey-April 2012, a third transect was established in the mid of the reservoir where it runs up to 30 m deep and sampled similarly as at the two original sampling transects, Kalange-Makwanzi and Buyala-Kikubamutwe for comparative purposes. This monitoring survey No. 12 undertaken between 25th and 30th April 2013 is the third one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: water quality determinants, biology and ecology of fishes and food webs, fish stock and fish catch including economic aspects of catch and sanitation/vector studies (bilharzias and river blindness). In the post-construction monitoring surveys, the assessments of algae, zooplankton and benthic macro-invertebrates which had been restrained since April 2008 were also included.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The survey covered by this report was undertaken between 3rd and 7th April 2009 as a follow-up on the during construction surveys. Two pre-construction baseline surveys were undertaken in April 2000 and April 2006. During the construction phase which started in 2007, three surveys including the current one have been undertaken i.e. in September 2007, April 2008 and the present one, in April 2009. Unlike in all previous surveys in which monitoring was conducted at one transect upstream and three downstream transects, in the current survey, two transects, one upstream and the other,downstream of the BHPP were sampled with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)