This thesis presents the results of an experimental investigation of the initiation of brittle fracture and the nature of discontinuous yielding in small plastic enclaves in an annealed mild steel. Upper and lower yield stress data have been obtained from unnotched specimens and nominal fracture stress data have been obtained from specimens of two scale factors and two grain sizes over a range of nominal stress rates from 10^2 to 10^7 lb/in.^2 sec at -111°F and -200°F. The size and shape of plastic enclaves near the notches were revealed by an etch technique.

A stress analysis utilizing slip-line field theory in the plastic region has been developed for the notched specimen geometry employed in this investigation. The yield stress of the material in the plastic enclaves near the notch root has been correlated with the lower yield stress measured on unnotched specimens through a consideration of the plastic boundary velocity under dynamic loading. A maximum tensile stress of about 122,000 lb/in.^2 at the instant of fracture initiation was calculated with the aid of the stress analysis for the large scale specimens of ASTM grain size 8 1/4.

The plastic strain state adjacent to a plastic-elastic interface has been shown to cause the maximum shear stress to have a larger value on the elastic than the plastic side of the interface. This characteristic of dis continuous yielding is instrumental in causing the plastic boundaries to be nearly parallel to the slip-line field where the plastic strain is of the order of the Lüder's strain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The fibrous and cleavage tensile fracture of an annealed mild steel was investigated. Round tensile specimens of two geometries, one straight and one with a circumferential notch, were pulled at temperatures between room temperature and liquid nitrogen temperature. Tensile fractures occurred at average strains from 0.02 to 0.87. The mechanism of fibrous fracture at room temperature was investigated metallographically. The stress-strain values at which fibrous and cleavage fractures are initiated were determined.

Many fine microcracks, which are associated with pearlite colonies and inclusion stringers, develop prior to fibrous fracture. The macrofracture, which leads to final separation of the tensile specimen, is initiated by the propagation of a microcrack beyond the microstructural feature with which it is associated. Thus, the fibrous fracture of mild steel does not develop by the gradual growth and coalescence of voids that are large enough to be visible in the optical microscope. When the microcracks begin to open and propagate, final fracture quickly follows. Axial cracks are a prominent feature of the macrofracture that forms in the interior of the specimen immediately before final fracture.

The Bridgman distribution of stresses is not valid in a notched tensile specimen. Fibrous and cleavage fractures occur at approximately the same value of maximum tensile stress. When the maximum tensile stress that is necessary for cleavage fracture is plotted against the corresponding maximum tensile strain, the result is an unique locus.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Politically the Colorado river is an interstate as well as an international stream. Physically the basin divides itself distinctly into three sections. The upper section from head waters to the mouth of San Juan comprises about 40 percent of the total of the basin and affords about 87 percent of the total runoff, or an average of about 15 000 000 acre feet per annum. High mountains and cold weather are found in this section. The middle section from the mouth of San Juan to the mouth of the Williams comprises about 35 percent of the total area of the basin and supplies about 7 percent of the annual runoff. Narrow canyons and mild weather prevail in this section. The lower third of the basin is composed of mainly hot arid plains of low altitude. It comprises some 25 percent of the total area of the basin and furnishes about 6 percent of the average annual runoff.

The proposed Diamond Creek reservoir is located in the middle section and is wholly within the boundary of Arizona. The site is at the mouth of Diamond Creek and is only 16 m. from Beach Spring, a station on the Santa Fe railroad. It is solely a power project with a limited storage capacity. The dam which creats the reservoir is of the gravity type to be constructed across the river. The walls and foundation are of granite. For a dam of 290 feet in height, the back water will be about 25 m. up the river.

The power house will be placed right below the dam perpendicular to the axis of the river. It is entirely a concrete structure. The power installation would consist of eighteen 37 500 H.P. vertical, variable head turbines, directly connected to 28 000 kwa. 110 000 v. 3 phase, 60 cycle generators with necessary switching and auxiliary apparatus. Each unit is to be fed by a separate penstock wholly embedded into the masonry.

Concerning the power market, the main electric transmission lines would extend to Prescott, Phoenix, Mesa, Florence etc. The mining regions of the mountains of Arizona would be the most adequate market. The demand of power in the above named places might not be large at present. It will, from the observation of the writer, rapidly increase with the wonderful advancement of all kinds of industrial development.

All these things being comparatively feasible, there is one difficult problem: that is the silt. At the Diamond Creek dam site the average annual silt discharge is about 82 650 acre feet. The geographical conditions, however, will not permit silt deposites right in the reservoir. So this design will be made under the assumption given in Section 4.

The silt condition and the change of lower course of the Colorado are much like those of the Yellow River in China. But one thing is different. On the Colorado most of the canyon walls are of granite, while those on the Yellow are of alluvial loess: so it is very hard, if not impossible, to get a favorable dam site on the lower part. As a visitor to this country, I should like to see the full development of the Colorado: but how about THE YELLOW!