16 resultados para power systems optimization

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In October 2002, under the auspices of Spanish Cooperation, a pilot electrification project put into operation two centralised PV-diesel hybrid systems in two different Moroccan villages. These systems currently provide a full-time energy service and supply electricity to more than a hundred of families, six community buildings, street lighting and one running water system. The appearance of the electricity service is very similar to an urban one: one phase AC supply (230V/50Hz) distributed up to each dwelling using a low-voltage mini-grid, which has been designed to be fully compatible with a future arrival of the utility grid. The management of this electricity service is based on a “fee-for-service” scheme agreed between a local NGO, partner of the project, and electricity associations created in each village, which are in charge of, among other tasks, recording the daily energy production of systems and the monthly energy consumption of each house. This register of data allows a systematic evaluation of both the system performance and the energy consumption of users. Now, after four years of operation, this paper presents the experience of this pilot electrification project and draws lessons that can be useful for designing, managing and sizing this type of small village PV-hybrid system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El sistema de energía eólica-diesel híbrido tiene un gran potencial en la prestación de suministro de energía a comunidades remotas. En comparación con los sistemas tradicionales de diesel, las plantas de energía híbridas ofrecen grandes ventajas tales como el suministro de capacidad de energía extra para "microgrids", reducción de los contaminantes y emisiones de gases de efecto invernadero, y la cobertura del riesgo de aumento inesperado del precio del combustible. El principal objetivo de la presente tesis es proporcionar nuevos conocimientos para la evaluación y optimización de los sistemas de energía híbrido eólico-diesel considerando las incertidumbres. Dado que la energía eólica es una variable estocástica, ésta no puede ser controlada ni predecirse con exactitud. La naturaleza incierta del viento como fuente de energía produce serios problemas tanto para la operación como para la evaluación del valor del sistema de energía eólica-diesel híbrido. Por un lado, la regulación de la potencia inyectada desde las turbinas de viento es una difícil tarea cuando opera el sistema híbrido. Por otro lado, el bene.cio económico de un sistema eólico-diesel híbrido se logra directamente a través de la energía entregada a la red de alimentación de la energía eólica. Consecuentemente, la incertidumbre de los recursos eólicos incrementa la dificultad de estimar los beneficios globales en la etapa de planificación. La principal preocupación del modelo tradicional determinista es no tener en cuenta la incertidumbre futura a la hora de tomar la decisión de operación. Con lo cual, no se prevé las acciones operativas flexibles en respuesta a los escenarios futuros. El análisis del rendimiento y simulación por ordenador en el Proyecto Eólico San Cristóbal demuestra que la incertidumbre sobre la energía eólica, las estrategias de control, almacenamiento de energía, y la curva de potencia de aerogeneradores tienen un impacto significativo sobre el rendimiento del sistema. En la presente tesis, se analiza la relación entre la teoría de valoración de opciones y el proceso de toma de decisiones. La opción real se desarrolla con un modelo y se presenta a través de ejemplos prácticos para evaluar el valor de los sistemas de energía eólica-diesel híbridos. Los resultados muestran que las opciones operacionales pueden aportar un valor adicional para el sistema de energía híbrida, cuando esta flexibilidad operativa se utiliza correctamente. Este marco se puede aplicar en la optimización de la operación a corto plazo teniendo en cuenta la naturaleza dependiente de la trayectoria de la política óptima de despacho, dadas las plausibles futuras realizaciones de la producción de energía eólica. En comparación con los métodos de valoración y optimización existentes, el resultado del caso de estudio numérico muestra que la política de operación resultante del modelo de optimización propuesto presenta una notable actuación en la reducción del con- sumo total de combustible del sistema eólico-diesel. Con el .n de tomar decisiones óptimas, los operadores de plantas de energía y los gestores de éstas no deben centrarse sólo en el resultado directo de cada acción operativa, tampoco deberían tomar decisiones deterministas. La forma correcta es gestionar dinámicamente el sistema de energía teniendo en cuenta el valor futuro condicionado en cada opción frente a la incertidumbre. ABSTRACT Hybrid wind-diesel power systems have a great potential in providing energy supply to remote communities. Compared with the traditional diesel systems, hybrid power plants are providing many advantages such as providing extra energy capacity to the micro-grid, reducing pollution and greenhouse-gas emissions, and hedging the risk of unexpected fuel price increases. This dissertation aims at providing novel insights for assessing and optimizing hybrid wind-diesel power systems considering the related uncertainties. Since wind power can neither be controlled nor accurately predicted, the energy harvested from a wind turbine may be considered a stochastic variable. This uncertain nature of wind energy source results in serious problems for both the operation and value assessment of the hybrid wind-diesel power system. On the one hand, regulating the uncertain power injected from wind turbines is a difficult task when operating the hybrid system. On the other hand, the economic profit of a hybrid wind-diesel system is achieved directly through the energy delivered to the power grid from the wind energy. Therefore, the uncertainty of wind resources has increased the difficulty in estimating the total benefits in the planning stage. The main concern of the traditional deterministic model is that it does not consider the future uncertainty when making the dispatch decision. Thus, it does not provide flexible operational actions in response to the uncertain future scenarios. Performance analysis and computer simulation on the San Cristobal Wind Project demonstrate that the wind power uncertainty, control strategies, energy storage, and the wind turbine power curve have a significant impact on the performance of the system. In this dissertation, the relationship between option pricing theory and decision making process is discussed. A real option model is developed and presented through practical examples for assessing the value of hybrid wind-diesel power systems. Results show that operational options can provide additional value to the hybrid power system when this operational flexibility is correctly utilized. This framework can be applied in optimizing short term dispatch decisions considering the path-dependent nature of the optimal dispatch policy, given the plausible future realizations of the wind power production. Comparing with the existing valuation and optimization methods, result from numerical example shows that the dispatch policy resulting from the proposed optimization model exhibits a remarkable performance in minimizing the total fuel consumption of the wind-diesel system. In order to make optimal decisions, power plant operators and managers should not just focus on the direct outcome of each operational action; neither should they make deterministic decisions. The correct way is to dynamically manage the power system by taking into consideration the conditional future value in each option in response to the uncertainty.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The location of ground faults in railway electric lines in 2 × 5 kV railway power supply systems is a difficult task. In both 1 × 25 kV and transmission power systems it is common practice to use distance protection relays to clear ground faults and localize their positions. However, in the particular case of this 2 × 25 kV system, due to the widespread use of autotransformers, the relation between the distance and the impedance seen by the distance protection relays is not linear and therefore the location is not accurate enough. This paper presents a simple and economical method to identify the subsection between autotransformers and the conductor (catenary or feeder) where the ground fault is happening. This method is based on the comparison of the angle between the current and the voltage of the positive terminal in each autotransformer. Consequently, after the identification of the subsection and the conductor with the ground defect, only the subsection where the ground fault is present will be quickly removed from service, with the minimum effect on rail traffic. This method has been validated through computer simulations and laboratory tests with positive results.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The run-of-river hydro power plant usually have low or nil water storage capacity, and therefore an adequate control strategy is required to keep the water level constant in pond. This paper presents a novel technique based on TSK fuzzy controller to maintain the pond head constant. The performance is investigated over a wide range of hill curve of hydro turbine. The results are compared with PI controller as discussed in [1].

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A three-phase transformer with flat conductor layers is proposed in this article. This arrangement is used for high current density transformers. Cost effectiveness in planar magnetic are related with the optimization in the number of layers in each winding. This fact takes more relevance for the medium and high power three-phase transformers where the number of parallels to achieve the required DCR is increased. The proposed method allows the use of off-the-shell core shapes that are used for single phase transformers. Cost impact is significant and design implications become more flexible. The proposed solution has been validated and compared using the conventional and the proposed methodologies to design a high power (20 kW) transformer.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Massive integration of renewable energy sources in electrical power systems of remote islands is a subject of current interest. The increasing cost of fossil fuels, transport costs to isolated sites and environmental concerns constitute a serious drawback to the use of conventional fossil fuel plants. In a weak electrical grid, as it is typical on an island, if a large amount of conventional generation is substituted by renewable energy sources, power system safety and stability can be compromised, in the case of large grid disturbances. In this work, a model for transient stability analysis of an isolated electrical grid exclusively fed from a combination of renewable energy sources has been studied. This new generation model will be installed in El Hierro Island, in Spain. Additionally, an operation strategy to coordinate the generation units (wind, hydro) is also established. Attention is given to the assessment of inertial energy and reactive current to guarantee power system stability against large disturbances. The effectiveness of the proposed strategy is shown by means of simulation results.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In order to achieve total selectivity at electrical distribution networks it is of great importance to analyze the defect currents at ungrounded power systems. This information will help to grant selectivity at electrical distribution networks ensuring that only the defect line or feeder is removed from service. In the present work a new selective and directional protection method for ungrounded power systems is evaluated. The new method measures only defect currents to detect earth faults and works with a directional criterion to determine the line under faulty conditions. The main contribution of this new technique is that it can detect earth faults in outgoing lines at any type of substation avoiding the possible mismatch of traditional directional earth fault relays. This detection technique is based on the comparison of the direction of a reference current to the direction of all earth fault capacitive currents at all the feeders connected to the same bus bars. This new method has been validated through computer simulations. The results for the different cases studied are remarkable, proving total validity and usefulness of the new method.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Renewable energy sources are believed to reduce drastically greenhouse gas emissions that would otherwise be generated from fossil fuels used to generate electricity. This implies that a unit of renewable energy will replace a unit of fossil-fuel, with its CO2 emissions, on an equivalent basis (with no other effects on the grid). But, the fuel economy and emissions in the existing power systems are not proportional with the electricity production of intermittent sources due to cycling of the fossil fuel plants that make up the balance of the grid (i.e. changing the power output makes thermal units to operate less efficiently). This study focuses in the interactions between wind generation and thermal plants cycling, by establishing the levels of extra fuel use caused by decreased efficiencies of fossil back-up for wind electricity in Spain. We analyze the production of all thermal plants in 2011, studying different scenarios where wind penetration causes major deviations in programming, while we define a procedure for quantifying the carbon reductions by using emission factors and efficiency curves from the existing installations. The objectives are to discuss the real contributions of renewable energies to the environmental targets as well as suggest alternatives that would improve the reliability of future power systems.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Nuevas aplicaciones tecnológicas y científicas mediante amarras electrodinámicas son analizadas para misiones planetarias. i) Primero, se considera un conjunto de amarras cilíndricas en paralelo (veleros electrosolares) para una misión interplanetaria. Los iones provenientes del viento solar son repelidos por el alto potencial de dichas amarras generando empuje sobre el velero. Para conocer el intercambio de momento que provocan los iones sobre las amarras se ha considerado un modelo de potencial estacionario. Se ha analizado la transferencia orbital de la Tierra a Júpiter siguiendo un método de optimización de trayectoria indirecto. ii) Una vez que el velero se encuentra cerca de Júpiter, se ha considerado el despliegue de una amarra para diferentes objetivos científicos. iia) Una amarra podría ser utilizada para diagnóstico de plasmas, al ser una fuente efectiva de ondas, y también como un generador de auroras artificiales. Una amarra conductora que orbite en la magnetosfera jovial es capaz de producir ondas. Se han analizado las diferentes ondas radiadas por un conductor por el que circula una corriente constante que sigue una órbita polar de alta excentricidad y bajo apoápside, como ocurre en la misión Juno de la NASA. iib) Además, se ha estudiado una misión tentativa que sigue una órbita ecuatorial (LJO) por debajo de los intensos cinturones de radiación. Ambas misiones requiren potencia eléctrica para los sistemas de comunicación e instrumentos científicos. Las amarras pueden generar potencia de manera más eficiente que otros sistemas que utlizan paneles solares o sistemas de potencia de radioisótopos (RPS). La impedancia de radiación es necesaria para determinar la corriente que circula por todo el circuito de la amarra. En un modelo de plasma frío, la radiación ocurre principalmente en los modos de Alfven y magnetosónica rápida, mostrando un elevado índice de refracción. Se ha estudiado la impedancia de radiación en amarras con recubrimiento aislante para los dos modos de radiación y cada una de las misiones. A diferencia del caso ionosférico terrestre, la baja densidad y el intenso campo magnético que aparecen en el entorno de Júpiter consiguen que la girofrecuencia de los electrones sea mucho mayor que la frecuencia del plasma; esto hace que el espectro de potencia para cada modo se modifique substancialmente, aumentando la velocidad de Alfven. Se ha estimado también la impedancia de radiación para amarras sin aislante conductor. En la misión LJO, un vehículo espacial bajando lentamente la altitud de su órbita permitiría estudiar la estructura del campo magnético y composición atmosférica para entender la formación, evolución, y estructura de Júpiter. Adicionalmente, si el contactor (cátodo) se apaga, se dice que la amarra flota eléctricamente, permitiendo emisión de haz de electrones que generan auroras. El continuo apagado y encendido produce pulsos de corriente dando lugar a emisiones de señales, que pueden ser utilizadas para diagnóstico del plasma jovial. En Órbita Baja Jovial, los iones que impactan contra una amarra polarizada negativamente producen electrones secundarios, que, viajando helicoidalmente sobre las líneas de campo magnético de Júpiter, son capaces de alcanzar su atmósfera más alta, y, de esta manera, generar auroras. Se han identificado cuáles son las regiones donde la amarra sería más eficiente para producir auroras. iic) Otra aplicación científica sugerida para la misión LJO es la detección de granos cargados que orbitan cerca de Júpiter. Los electrones de alta energía en este ambiente pueden ser modelados por una distribucción no Maxwelliana conocida como distribución kappa. En escenarios con plasmas complejos, donde los campos eléctricos en Júpiter pueden acelerar las cargas hasta velocidades que superen la velocidad térmica, este tipo de distribuciones son muy útiles. En este caso las colas de las distribuciones de electrones siguen una ley de potencias. Se han estudiado las fluctuaciones de granos cargados para funciones de distribución kappa. iii) La tesis concluye con el análisis para deorbitar satélites con amarras electrodinámicas que siguen una Órbita Baja Terrestre (LEO). Una amarra debe presentar una baja probabilidad de corte por pequeño debris y además debe ser suficientemente ligero para que el cociente entre la masa de la amarra y el satélite sea muy pequeño. En este trabajo se estiman las medidas de la longitud, anchura y espesor que debe tener una amarra para minimizar el producto de la probabilidad de corte por el cociente entre las masas de la amarra y el satélite. Se presentan resultados preliminares del diseño de una amarra con forma de cinta para deorbitar satélites relativamente ligeros como Cryosat y pesados como Envisat. Las misiones espaciales a planetas exteriores y en el ámbito terrestre plantean importantes retos científico-tecnológicos que deben ser abordados y solucionados. Por ello, desde el inicio de la era espacial se han diseñando novedosos métodos propulsivos, sistemas de guiado, navegación y control más robustos, y nuevos materiales para mejorar el rendimiento de los vehículos espaciales (SC). En un gran número de misiones interplanetarias y en todas las misiones a planetas exteriores se han empleado sistemas de radioisótopos (RPS) para generar potencia eléctrica en los vehículos espaciales y en los rovers de exploración. Estos sistemas emplean como fuente de energía el escaso y costoso plutonio-238. La NASA, por medio de un informe de la National Academy of Science (5 de Mayo del 2009), expresó una profunda preocupación por la baja cantidad de plutonio almacenado, insuficiente para desarrollar todas las misiones de exploración planetaria planeadas en el futuro [81, 91]. Esta circustancia ha llevado a dicha Agencia tomar la decisión de limitar el uso de estos sistemas RPS en algunas misiones de especial interés científico y una recomendación de alta prioridad para que el Congreso de los EEUU apruebe el reestablecimiento de la producción de plutonio-238, -son necesarios cerca de 5 kg de este material radiactivo al año-, para salvaguardar las misiones que requieran dichos sistemas de potencia a partir del año 2018. Por otro lado, la Agencia estadounidense ha estado considerando el uso de fuentes de energía alternativa; como la fisión nuclear a través del ambicioso proyecto Prometheus, para llevar a cabo una misión de exploración en el sistema jovial (JIMO). Finalmente, dicha misión fue desestimada por su elevado coste. Recientemente se han estado desarrollando sistemas que consigan energía a través de los recursos naturales que nos aporta el Sol, mediante paneles solares -poco eficientes para misiones a planetas alejados de la luz solar-. En este contexto, la misión JUNO del programa Nuevas Fronteras de la NASA, cuyo lanzamiento fue realizado con éxito en Agosto de 2011, va a ser la primera misión equipada con paneles solares que sobrevolará Júpiter en el 2015 siguiendo una órbita polar. Anteriormente se habían empleado los antes mencionados RPS para las misiones Pioneer 10,11, Voyager 1,2, Ulysses, Cassini-Huygens y Galileo (todas sobrevuelos excepto Galileo). Dicha misión seguirá una órbita elíptica de alta excentricidad con un periápside muy cercano a Júpiter, y apoápside lejano, evitando que los intensos cinturones de radiación puedan dañar los instrumentos de navegación y científicos. Un tether o amarra electrodinámica es capaz de operar como sistema propulsivo o generador de potencia, pero también puede ser considerado como solución científicotecnológica en misiones espaciales tanto en LEO (Órbita Baja Terrestre) como en planetas exteriores. Siguiendo una perspectiva histórica, durante las misiones terrestres TSS-1 (1992) y TSS-1R (1996) se emplearon amarras estandard con recubrimiento aislante en toda su longitud, aplicando como terminal anódico pasivo un colector esférico para captar electrones. En una geometría alternativa, propuesta por J. R. Sanmartín et al. (1993) [93], se consideró dejar la amarra sin recubrimiento aislante (“bare tether”), y sin colector anódico esférico, de forma que recogiera electrones a lo largo del segmento que resulta polarizado positivo, como si se tratara de una sonda de Langmuir de gran longitud. A diferencia de la amarra estandard, el “bare tether” es capaz de recoger electrones a lo largo de una superficie grande ya que este segmento es de varios kilómetros de longitud. Como el radio de la amarra es del orden de la longitud de Debye y pequeño comparado con el radio de Larmor de los electrones, permite una recolección eficiente de electrones en el régimen OML (Orbital Motion Limited) de sondas de Langmuir. La corriente dada por la teoría OML varía en función del perímetro y la longitud. En el caso de una cinta delgada, el perímetro depende de la anchura, que debe ser suficientemente grande para evitar cortes producidos por debris y micrometeoritos, y suficientemente pequeño para que la amarra funcione en dicho régimen [95]. En el experimento espacial TSS-1R mencionado anteriormente, se identificó una recolección de corriente más elevada que la que predecía el modelo teórico de Parker- Murphy, debido posiblemente a que se utilizaba un colector esférico de radio bastante mayor que la longitud de Debye [79]. En el caso de una amarra “bare”, que recoge electrones a lo largo de gran parte de su longitud, se puede producir un fenómeno conocido como atrapamiento adiabático de electrones (adiabatic electron trapping) [25, 40, 60, 73, 74, 97]. En el caso terrestre (LEO) se da la condición mesotérmica en la que la amarra se mueve con una velocidad muy superior a la velocidad térmica de los iones del ambiente y muy inferior a la velocidad térmica de los electrones. J. Laframboise y L. Parker [57] mostraron que, para una función de distribución quasi-isotrópica, la densidad de electrones debe entonces ser necesariamente inferior a la densidad ambiente. Por otra parte, debido a su flujo hipersónico y a la alta polarización positiva de la amarra, la densidad de los iones es mayor que la densidad ambiente en una vasta región de la parte “ram” del flujo, violando la condición de cuasi-neutralidad,-en una región de dimensión mayor que la longitud de Debye-. La solución a esta paradoja podría basarse en el atrapamiento adiabático de electrones ambiente en órbitas acotadas entorno al tether. ABSTRACT New technological and scientific applications by electrodynamic tethers for planetary missions are analyzed: i) A set of cylindrical, parallel tethers (electric solar sail or e-sail) is considered for an interplanetary mission; ions from the solar wind are repelled by the high potential of the tether, providing momentum to the e-sail. An approximated model of a stationary potential for a high solar wind flow is considered. With the force provided by a negative biased tether, an indirect method for the optimization trajectory of an Earth-to-Jupiter orbit transfer is analyzed. ii) The deployment of a tether from the e-sail allows several scientific applications in Jupiter. iia) It might be used as a source of radiative waves for plasma diagnostics and artificial aurora generator. A conductive tether orbiting in the Jovian magnetosphere produces waves. Wave radiation by a conductor carrying a steady current in both a polar, highly eccentric, low perijove orbit, as in NASA’s Juno mission, and an equatorial low Jovian orbit (LJO) mission below the intense radiation belts, is considered. Both missions will need electric power generation for scientific instruments and communication systems. Tethers generate power more efficiently than solar panels or radioisotope power systems (RPS). The radiation impedance is required to determine the current in the overall tether circuit. In a cold plasma model, radiation occurs mainly in the Alfven and fast magnetosonic modes, exhibiting a large refraction index. The radiation impedance of insulated tethers is determined for both modes and either mission. Unlike the Earth ionospheric case, the low-density, highly magnetized Jovian plasma makes the electron gyrofrequency much larger than the plasma frequency; this substantially modifies the power spectrum for either mode by increasing the Alfven velocity. An estimation of the radiation impedance of bare tethers is also considered. iib) In LJO, a spacecraft orbiting in a slow downward spiral under the radiation belts would allow determining magnetic field structure and atmospheric composition for understanding the formation, evolution, and structure of Jupiter. Additionally, if the cathodic contactor is switched off, a tether floats electrically, allowing e-beam emission that generate auroras. On/off switching produces bias/current pulses and signal emission, which might be used for Jovian plasma diagnostics. In LJO, the ions impacting against the negative-biased tether do produce secondary electrons, which racing down Jupiter’s magnetic field lines, reach the upper atmosphere. The energetic electrons there generate auroral effects. Regions where the tether efficiently should produce secondary electrons are analyzed. iic) Other scientific application suggested in LJO is the in-situ detection of charged grains. Charged grains naturally orbit near Jupiter. High-energy electrons in the Jovian ambient may be modeled by the kappa distribution function. In complex plasma scenarios, where the Jovian high electric field may accelerate charges up superthermal velocities, the use of non-Maxwellian distributions should be considered. In these cases, the distribution tails fit well to a power-law dependence for electrons. Fluctuations of the charged grains for non-Mawellian distribution function are here studied. iii) The present thesis is concluded with the analysis for de-orbiting satellites at end of mission by electrodynamic tethers. A de-orbit tether system must present very small tether-to-satellite mass ratio and small probability of a tether cut by small debris too. The present work shows how to select tape dimensions so as to minimize the product of those two magnitudes. Preliminary results of tape-tether design are here discussed to minimize that function. Results for de-orbiting Cryosat and Envisat are also presented.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The price formation of the Iberian Energy Derivatives Market-the power futures market-starting in July 2006, is assessed until November 2011, through the evolution of the difference between forward and spot prices in the delivery period (“ex-post forward risk premium”) and the comparison with the forward generation costs from natural gas (“clean spark spread”). The premium tends to be positive in all existing mechanisms (futures, Over-the-Counter and auctions for catering part of the last resort supplies). Since year 2011, the values are smaller due to regulatorily recognized prices for coal power plants. The power futures are strongly correlated with European gas prices. The spreads built with prompt contracts tend also to be positive. The biggest ones are for the month contract, followed by the quarter contract and then by the year contract. Therefore, gas fired generation companies can maximize profits trading with contracts of shorter maturity.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The objective of this paper is to present a simplified method to analyze small-signal stability of a power system and provide performance metrics for stability assessment of a given power-system-architecture. The stability margins are stated utilizing a concept of maximum peak criteria (MPC), derived from the behavior of an impedance-based sensitivity function that provides a single number to state the robustness of the stability of a well-defined minor-loop gain. For each minor-loop gain, defined at every system interface, the robustness of the stability is provided as a maximum value of the corresponding sensitivity function. Typically power systems comprise of various interfaces and, therefore, in order to compare different architecture solutions in terms of stability, a single number providing an overall measure of the whole system stability is required. The selected figure of merit is geometric average of each maximum peak value within the system, combined with the worst case value of system interfaces.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A power generation scheme based on bare electrodynamic tethers (EDT), working in passive mode is investigated for the purpose of supplying power to scientific missions at Saturn. The system employs a spinning EDT on a lowaltitude polar orbit which permits to efficiently convert plasmasphere energy into useful power. After optimizing the tether design for power generation we compute the supplied power along the orbit and the impact of the Lorentz force on the orbital elements as function of the tether and orbit characteristics. Although uncertainties in the current ionosphere density modeling strongly affect the performance of the system the peak power density of the EDT appears be greater than conventional power systems.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Electrical power systems are changing their traditional structure, which was based on a little number of large generating power plants placed at great distances from loads by new models that tend to split the big production nodes in many smaller ones. The set of small groups which are located close to consumers and provide safe and quality energy is called distributed generation (DG). The proximity of the sources to the loads reduces losses associated with transportation and increases overall system efficiency. DG also favors the inclusion of renewable energy sources in isolated electrical systems or remote microgrids, because they can be installed where the natural resource is located. In both cases, as weak grids unable to get help from other nearby networks, it is essential to ensure appropriate behavior of DG sources to guarantee power system safety and stability. The grid codes sets out the technical requirements to be fulfilled for the sources connected in these electrical networks. In technical literature it is rather easy to find and compare grid codes for interconnected electrical systems. However, the existing literature is incomplete and sparse regarding isolated electrical systems and this happens due to the difficulties inherent in the pursuit of codes. Some countries have developed their own legislation only for their island territory (as Spain or France), others apply the same set of rules as in mainland, another group of island countries have elaborated a complete grid code for all generating sources and some others lack specific regulation. This paper aims to make a complete review of the state of the art in grid codes applicable to isolated systems, setting the comparison between them and defining the guidelines predictably followed by the upcoming regulations in these particular systems.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La electrónica digital moderna presenta un desafío a los diseñadores de sistemas de potencia. El creciente alto rendimiento de microprocesadores, FPGAs y ASICs necesitan sistemas de alimentación que cumplan con requirimientos dinámicos y estáticos muy estrictos. Específicamente, estas alimentaciones son convertidores DC-DC de baja tensión y alta corriente que necesitan ser diseñados para tener un pequeño rizado de tensión y una pequeña desviación de tensión de salida bajo transitorios de carga de una alta pendiente. Además, dependiendo de la aplicación, se necesita cumplir con otros requerimientos tal y como proveer a la carga con ”Escalado dinámico de tensión”, donde el convertidor necesitar cambiar su tensión de salida tan rápidamente posible sin sobreoscilaciones, o ”Posicionado Adaptativo de la Tensión” donde la tensión de salida se reduce ligeramente cuanto más grande sea la potencia de salida. Por supuesto, desde el punto de vista de la industria, las figuras de mérito de estos convertidores son el coste, la eficiencia y el tamaño/peso. Idealmente, la industria necesita un convertidor que es más barato, más eficiente, más pequeño y que aún así cumpla con los requerimienos dinámicos de la aplicación. En este contexto, varios enfoques para mejorar la figuras de mérito de estos convertidores se han seguido por la industria y la academia tales como mejorar la topología del convertidor, mejorar la tecnología de semiconducores y mejorar el control. En efecto, el control es una parte fundamental en estas aplicaciones ya que un control muy rápido hace que sea más fácil que una determinada topología cumpla con los estrictos requerimientos dinámicos y, consecuentemente, le da al diseñador un margen de libertar más amplio para mejorar el coste, la eficiencia y/o el tamaño del sistema de potencia. En esta tesis, se investiga cómo diseñar e implementar controles muy rápidos para el convertidor tipo Buck. En esta tesis se demuestra que medir la tensión de salida es todo lo que se necesita para lograr una respuesta casi óptima y se propone una guía de diseño unificada para controles que sólo miden la tensión de salida Luego, para asegurar robustez en controles muy rápidos, se proponen un modelado y un análisis de estabilidad muy precisos de convertidores DC-DC que tienen en cuenta circuitería para sensado y elementos parásitos críticos. También, usando este modelado, se propone una algoritmo de optimización que tiene en cuenta las tolerancias de los componentes y sensados distorsionados. Us ando este algoritmo, se comparan controles muy rápidos del estado del arte y su capacidad para lograr una rápida respuesta dinámica se posiciona según el condensador de salida utilizado. Además, se propone una técnica para mejorar la respuesta dinámica de los controladores. Todas las propuestas se han corroborado por extensas simulaciones y prototipos experimentales. Con todo, esta tesis sirve como una metodología para ingenieros para diseñar e implementar controles rápidos y robustos de convertidores tipo Buck. ABSTRACT Modern digital electronics present a challenge to designers of power systems. The increasingly high-performance of microprocessors, FPGAs (Field Programmable Gate Array) and ASICs (Application-Specific Integrated Circuit) require power supplies to comply with very demanding static and dynamic requirements. Specifically, these power supplies are low-voltage/high-current DC-DC converters that need to be designed to exhibit low voltage ripple and low voltage deviation under high slew-rate load transients. Additionally, depending on the application, other requirements need to be met such as to provide to the load ”Dynamic Voltage Scaling” (DVS), where the converter needs to change the output voltage as fast as possible without underdamping, or ”Adaptive Voltage Positioning” (AVP) where the output voltage is slightly reduced the greater the output power. Of course, from the point of view of the industry, the figures of merit of these converters are the cost, efficiency and size/weight. Ideally, the industry needs a converter that is cheaper, more efficient, smaller and that can still meet the dynamic requirements of the application. In this context, several approaches to improve the figures of merit of these power supplies are followed in the industry and academia such as improving the topology of the converter, improving the semiconductor technology and improving the control. Indeed, the control is a fundamental part in these applications as a very fast control makes it easier for the topology to comply with the strict dynamic requirements and, consequently, gives the designer a larger margin of freedom to improve the cost, efficiency and/or size of the power supply. In this thesis, how to design and implement very fast controls for the Buck converter is investigated. This thesis proves that sensing the output voltage is all that is needed to achieve an almost time-optimal response and a unified design guideline for controls that only sense the output voltage is proposed. Then, in order to assure robustness in very fast controls, a very accurate modeling and stability analysis of DC-DC converters is proposed that takes into account sensing networks and critical parasitic elements. Also, using this modeling approach, an optimization algorithm that takes into account tolerances of components and distorted measurements is proposed. With the use of the algorithm, very fast analog controls of the state-of-the-art are compared and their capabilities to achieve a fast dynamic response are positioned de pending on the output capacitor. Additionally, a technique to improve the dynamic response of controllers is also proposed. All the proposals are corroborated by extensive simulations and experimental prototypes. Overall, this thesis serves as a methodology for engineers to design and implement fast and robust controls for Buck-type converters.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

I. GENERALIDADES 1.1. Introducción Entre los diversos tipos de perturbaciones eléctricas, los huecos de tensión son considerados el problema de calidad de suministro más frecuente en los sistemas eléctricos. Este fenómeno es originado por un aumento extremo de la corriente en el sistema, causado principalmente por cortocircuitos o maniobras inadecuadas en la red. Este tipo de perturbación eléctrica está caracterizado básicamente por dos parámetros: tensión residual y duración. Típicamente, se considera que el hueco se produce cuando la tensión residual alcanza en alguna de las fases un valor entre 0.01 a 0.9 pu y tiene una duración de hasta 60 segundos. Para un usuario final, el efecto más relevante de un hueco de tensión es la interrupción o alteración de la operación de sus equipos, siendo los dispositivos de naturaleza electrónica los principalmente afectados (p. ej. ordenador, variador de velocidad, autómata programable, relé, etc.). Debido al auge tecnológico de las últimas décadas y a la búsqueda constante de automatización de los procesos productivos, el uso de componentes electrónicos resulta indispensable en la actualidad. Este hecho, lleva a que los efectos de los huecos de tensión sean más evidentes para el usuario final, provocando que su nivel de exigencia de la calidad de energía suministrada sea cada vez mayor. De forma general, el estudio de los huecos de tensión suele ser abordado bajo dos enfoques: en la carga o en la red. Desde el punto de vista de la carga, se requiere conocer las características de sensibilidad de los equipos para modelar su respuesta ante variaciones súbitas de la tensión del suministro eléctrico. Desde la perspectiva de la red, se busca estimar u obtener información adecuada que permita caracterizar su comportamiento en términos de huecos de tensión. En esta tesis, el trabajo presentado se encuadra en el segundo aspecto, es decir, en el modelado y estimación de la respuesta de un sistema eléctrico de potencia ante los huecos de tensión. 1.2. Planteamiento del problema A pesar de que los huecos de tensión son el problema de calidad de suministro más frecuente en las redes, hasta la actualidad resulta complejo poder analizar de forma adecuada este tipo de perturbación para muchas compañías del sector eléctrico. Entre las razones más comunes se tienen: - El tiempo de monitorización puede llegar a ser de varios años para conseguir una muestra de registros de huecos estadísticamente válida. - La limitación de recursos económicos para la adquisición e instalación de equipos de monitorización de huecos. - El elevado coste operativo que implica el análisis de los datos de los medidores de huecos de tensión instalados. - La restricción que tienen los datos de calidad de energía de las compañías eléctricas. Es decir, ante la carencia de datos que permitan analizar con mayor detalle los huecos de tensión, es de interés de las compañías eléctricas y la academia poder crear métodos fiables que permitan profundizar en el estudio, estimación y supervisión de este fenómeno electromagnético. Los huecos de tensión, al ser principalmente originados por eventos fortuitos como los cortocircuitos, son el resultado de diversas variables exógenas como: (i) la ubicación de la falta, (ii) la impedancia del material de contacto, (iii) el tipo de fallo, (iv) la localización del fallo en la red, (v) la duración del evento, etc. Es decir, para plantear de forma adecuada cualquier modelo teórico sobre los huecos de tensión, se requeriría representar esta incertidumbre combinada de las variables para proveer métodos realistas y, por ende, fiables para los usuarios. 1.3. Objetivo La presente tesis ha tenido como objetivo el desarrollo diversos métodos estocásticos para el estudio, estimación y supervisión de los huecos de tensión en los sistemas eléctricos de potencia. De forma específica, se ha profundizado en los siguientes ámbitos: - En el modelado realista de las variables que influyen en la caracterización de los huecos. Esto es, en esta Tesis se ha propuesto un método que permite representar de forma verosímil su cuantificación y aleatoriedad en el tiempo empleando distribuciones de probabilidad paramétricas. A partir de ello, se ha creado una herramienta informática que permite estimar la severidad de los huecos de tensión en un sistema eléctrico genérico. - Se ha analizado la influencia la influencia de las variables de entrada en la estimación de los huecos de tensión. En este caso, el estudio se ha enfocado en las variables de mayor divergencia en su caracterización de las propuestas existentes. - Se ha desarrollado un método que permite estima el número de huecos de tensión de una zona sin monitorización a través de la información de un conjunto limitado de medidas de un sistema eléctrico. Para ello, se aplican los principios de la estadística Bayesiana, estimando el número de huecos de tensión más probable de un emplazamiento basándose en los registros de huecos de otros nudos de la red. - Plantear una estrategia para optimizar la monitorización de los huecos de tensión en un sistema eléctrico. Es decir, garantizar una supervisión del sistema a través de un número de medidores menor que el número de nudos de la red. II. ESTRUCTURA DE LA TESIS Para plantear las propuestas anteriormente indicadas, la presente Tesis se ha estructurado en seis capítulos. A continuación, se describen brevemente los mismos. A manera de capítulo introductorio, en el capítulo 1, se realiza una descripción del planteamiento y estructura de la presente tesis. Esto es, se da una visión amplia de la problemática a tratar, además de describir el alcance de cada capítulo de la misma. En el capítulo 2, se presenta una breve descripción de los fundamentos y conceptos generales de los huecos de tensión. Los mismos, buscan brindar al lector de una mejor comprensión de los términos e indicadores más empleados en el análisis de severidad de los huecos de tensión en las redes eléctricas. Asimismo, a manera de antecedente, se presenta un resumen de las principales características de las técnicas o métodos existentes aplicados en la predicción y monitorización óptima de los huecos de tensión. En el capítulo 3, se busca fundamentalmente conocer la importancia de las variables que determinen la frecuencia o severidad de los huecos de tensión. Para ello, se ha implementado una herramienta de estimación de huecos de tensión que, a través de un conjunto predeterminado de experimentos mediante la técnica denominada Diseño de experimentos, analiza la importancia de la parametrización de las variables de entrada del modelo. Su análisis, es realizado mediante la técnica de análisis de la varianza (ANOVA), la cual permite establecer con rigor matemático si la caracterización de una determinada variable afecta o no la respuesta del sistema en términos de los huecos de tensión. En el capítulo 4, se propone una metodología que permite predecir la severidad de los huecos de tensión de todo el sistema a partir de los registros de huecos de un conjunto reducido de nudos de dicha red. Para ello, se emplea el teorema de probabilidad condicional de Bayes, el cual calcula las medidas más probables de todo el sistema a partir de la información proporcionada por los medidores de huecos instalados. Asimismo, en este capítulo se revela una importante propiedad de los huecos de tensión, como es la correlación del número de eventos de huecos de tensión en diversas zonas de las redes eléctricas. En el capítulo 5, se desarrollan dos métodos de localización óptima de medidores de huecos de tensión. El primero, que es una evolución metodológica del criterio de observabilidad; aportando en el realismo de la pseudo-monitorización de los huecos de tensión con la que se calcula el conjunto óptimo de medidores y, por ende, en la fiabilidad del método. Como una propuesta alternativa, se emplea la propiedad de correlación de los eventos de huecos de tensión de una red para plantear un método que permita establecer la severidad de los huecos de todo el sistema a partir de una monitorización parcial de dicha red. Finalmente, en el capítulo 6, se realiza una breve descripción de las principales aportaciones de los estudios realizados en esta tesis. Adicionalmente, se describen diversos temas a desarrollar en futuros trabajos. III. RESULTADOS En base a las pruebas realizadas en las tres redes planteadas; dos redes de prueba IEEE de 24 y 118 nudos (IEEE-24 e IEEE-118), además del sistema eléctrico de la República del Ecuador de 357 nudos (EC-357), se describen los siguientes puntos como las observaciones más relevantes: A. Estimación de huecos de tensión en ausencia de medidas: Se implementa un método estocástico de estimación de huecos de tensión denominado PEHT, el cual representa con mayor realismo la simulación de los eventos de huecos de un sistema a largo plazo. Esta primera propuesta de la tesis, es considerada como un paso clave para el desarrollo de futuros métodos del presente trabajo, ya que permite emular de forma fiable los registros de huecos de tensión a largo plazo en una red genérica. Entre las novedades más relevantes del mencionado Programa de Estimación de Huecos de Tensión (PEHT) se tienen: - Considerar el efecto combinado de cinco variables aleatorias de entrada para simular los eventos de huecos de tensión en una pseudo-monitorización a largo plazo. Las variables de entrada modeladas en la caracterización de los huecos de tensión en el PEHT son: (i) coeficiente de fallo, (ii) impedancia de fallo, (iii) tipo de fallo, (iv) localización del fallo y (v) duración. - El modelado estocástico de las variables de entrada impedancia de fallo y duración en la caracterización de los eventos de huecos de tensión. Para la parametrización de las variables mencionadas, se realizó un estudio detallado del comportamiento real de las mismas en los sistemas eléctricos. Asimismo, se define la función estadística que mejor representa la naturaleza aleatoria de cada variable. - Considerar como variables de salida del PEHT a indicadores de severidad de huecos de uso común en las normativas, como es el caso de los índices: SARFI-X, SARFI-Curve, etc. B. Análisis de sensibilidad de los huecos de tensión: Se presenta un estudio causa-efecto (análisis de sensibilidad) de las variables de entrada de mayor divergencia en su parametrización entre las referencias relacionadas a la estimación de los huecos de tensión en redes eléctricas. De forma específica, se profundiza en el estudio de la influencia de la parametrización de las variables coeficiente de fallo e impedancia de fallo en la predicción de los huecos de tensión. A continuación un resumen de las conclusiones más destacables: - La precisión de la variable de entrada coeficiente de fallo se muestra como un parámetro no influyente en la estimación del número de huecos de tensión (SARFI-90 y SARFI-70) a largo plazo. Es decir, no se requiere de una alta precisión del dato tasa de fallo de los elementos del sistema para obtener una adecuada estimación de los huecos de tensión. - La parametrización de la variable impedancia de fallo se muestra como un factor muy sensible en la estimación de la severidad de los huecos de tensión. Por ejemplo, al aumentar el valor medio de esta variable aleatoria, se disminuye considerablemente la severidad reportada de los huecos en la red. Por otra parte, al evaluar el parámetro desviación típica de la impedancia de fallo, se observa una relación directamente proporcional de este parámetro con la severidad de los huecos de tensión de la red. Esto es, al aumentar la desviación típica de la impedancia de fallo, se evidencia un aumento de la media y de la variación interanual de los eventos SARFI-90 y SARFI-70. - En base al análisis de sensibilidad desarrollado en la variable impedancia de fallo, se considera muy cuestionable la fiabilidad de los métodos de estimación de huecos de tensión que omiten su efecto en el modelo planteado. C. Estimación de huecos de tensión en base a la información de una monitorización parcial de la red: Se desarrolla un método que emplea los registros de una red parcialmente monitorizada para determinar la severidad de los huecos de todo el sistema eléctrico. A partir de los casos de estudio realizados, se observa que el método implementado (PEHT+MP) posee las siguientes características: - La metodología propuesta en el PEHT+MP combina la teoría clásica de cortocircuitos con diversas técnicas estadísticas para estimar, a partir de los datos de los medidores de huecos instalados, las medidas de huecos de los nudos sin monitorización de una red genérica. - El proceso de estimación de los huecos de tensión de la zona no monitorizada de la red se fundamenta en la aplicación del teorema de probabilidad condicional de Bayes. Es decir, en base a los datos observados (los registros de los nudos monitorizados), el PEHT+MP calcula de forma probabilística la severidad de los huecos de los nudos sin monitorización del sistema. Entre las partes claves del procedimiento propuesto se tienen los siguientes puntos: (i) la creación de una base de datos realista de huecos de tensión a través del Programa de Estimación de Huecos de Tensión (PEHT) propuesto en el capítulo anterior; y, (ii) el criterio de máxima verosimilitud empleado para estimar las medidas de huecos de los nudos sin monitorización de la red evaluada. - Las predicciones de medidas de huecos de tensión del PEHT+MP se ven potenciadas por la propiedad de correlación de los huecos de tensión en diversas zonas de un sistema eléctrico. Esta característica intrínseca de las redes eléctricas limita de forma significativa la respuesta de las zonas fuertemente correlacionadas del sistema ante un eventual hueco de tensión. Como el PEHT+MP está basado en principios probabilísticos, la reducción del rango de las posibles medidas de huecos se ve reflejado en una mejor predicción de las medidas de huecos de la zona no monitorizada. - Con los datos de un conjunto de medidores relativamente pequeño del sistema, es posible obtener estimaciones precisas (error nulo) de la severidad de los huecos de la zona sin monitorizar en las tres redes estudiadas. - El PEHT+MP se puede aplicar a diversos tipos de indicadores de severidad de los huecos de tensión, como es el caso de los índices: SARFI-X, SARFI-Curve, SEI, etc. D. Localización óptima de medidores de huecos de tensión: Se plantean dos métodos para ubicar de forma estratégica al sistema de monitorización de huecos en una red genérica. La primera propuesta, que es una evolución metodológica de la localización óptima de medidores de huecos basada en el criterio de observabilidad (LOM+OBS); y, como segunda propuesta, un método que determina la localización de los medidores de huecos según el criterio del área de correlación (LOM+COR). Cada método de localización óptima de medidores propuesto tiene un objetivo concreto. En el caso del LOM+OBS, la finalidad del método es determinar el conjunto óptimo de medidores que permita registrar todos los fallos que originen huecos de tensión en la red. Por otro lado, en el método LOM+COR se persigue definir un sistema óptimo de medidores que, mediante la aplicación del PEHT+MP (implementado en el capítulo anterior), sea posible estimar de forma precisa las medidas de huecos de tensión de todo el sistema evaluado. A partir del desarrollo de los casos de estudio de los citados métodos de localización óptima de medidores en las tres redes planteadas, se describen a continuación las observaciones más relevantes: - Como la generación de pseudo-medidas de huecos de tensión de los métodos de localización óptima de medidores (LOM+OBS y LOM+COR) se obtienen mediante la aplicación del algoritmo PEHT, la formulación del criterio de optimización se realiza en base a una pseudo-monitorización realista, la cual considera la naturaleza aleatoria de los huecos de tensión a través de las cinco variables estocásticas modeladas en el PEHT. Esta característica de la base de datos de pseudo-medidas de huecos de los métodos LOM+OBS y LOM+COR brinda una mayor fiabilidad del conjunto óptimo de medidores calculado respecto a otros métodos similares en la bibliografía. - El conjunto óptimo de medidores se determina según la necesidad del operador de la red. Esto es, si el objetivo es registrar todos los fallos que originen huecos de tensión en el sistema, se emplea el criterio de observabilidad en la localización óptima de medidores de huecos. Por otra parte, si se plantea definir un sistema de monitorización que permita establecer la severidad de los huecos de tensión de todo el sistema en base a los datos de un conjunto reducido de medidores de huecos, el criterio de correlación resultaría el adecuado. De forma específica, en el caso del método LOM+OBS, basado en el criterio de observabilidad, se evidenciaron las siguientes propiedades en los casos de estudio realizados: - Al aumentar el tamaño de la red, se observa la tendencia de disminuir el porcentaje de nudos monitorizados de dicho sistema. Por ejemplo, para monitorizar los fallos que originan huecos en la red IEEE-24, se requiere monitorizar el 100\% de los nudos del sistema. En el caso de las redes IEEE-118 y EC-357, el método LOM+OBS determina que con la monitorización de un 89.5% y 65.3% del sistema, respectivamente, se cumpliría con el criterio de observabilidad del método. - El método LOM+OBS permite calcular la probabilidad de utilización del conjunto óptimo de medidores a largo plazo, estableciendo así un criterio de la relevancia que tiene cada medidor considerado como óptimo en la red. Con ello, se puede determinar el nivel de precisión u observabilidad (100%, 95%, etc.) con el cual se detectarían los fallos que generan huecos en la red estudiada. Esto es, al aumentar el nivel de precisión de detección de los fallos que originan huecos, se espera que aumente el número de medidores requeridos en el conjunto óptimo de medidores calculado. - El método LOM+OBS se evidencia como una técnica aplicable a todo tipo de sistema eléctrico (radial o mallado), el cual garantiza la detección de los fallos que originan huecos de tensión en un sistema según el nivel de observabilidad planteado. En el caso del método de localización óptima de medidores basado en el criterio del área de correlación (LOM+COR), las diversas pruebas realizadas evidenciaron las siguientes conclusiones: - El procedimiento del método LOM+COR combina los métodos de estimación de huecos de tensión de capítulos anteriores (PEHT y PEHT+MP) con técnicas de optimización lineal para definir la localización óptima de los medidores de huecos de tensión de una red. Esto es, se emplea el PEHT para generar los pseudo-registros de huecos de tensión, y, en base al criterio planteado de optimización (área de correlación), el LOM+COR formula y calcula analíticamente el conjunto óptimo de medidores de la red a largo plazo. A partir de la información registrada por este conjunto óptimo de medidores de huecos, se garantizaría una predicción precisa de la severidad de los huecos de tensión de todos los nudos del sistema con el PEHT+MP. - El método LOM+COR requiere un porcentaje relativamente reducido de nudos del sistema para cumplir con las condiciones de optimización establecidas en el criterio del área de correlación. Por ejemplo, en el caso del número total de huecos (SARFI-90) de las redes IEEE-24, IEEE-118 y EC-357, se calculó un conjunto óptimo de 9, 12 y 17 medidores de huecos, respectivamente. Es decir, solamente se requeriría monitorizar el 38\%, 10\% y 5\% de los sistemas indicados para supervisar los eventos SARFI-90 en toda la red. - El método LOM+COR se muestra como un procedimiento de optimización versátil, el cual permite reducir la dimensión del sistema de monitorización de huecos de redes eléctricas tanto radiales como malladas. Por sus características, este método de localización óptima permite emular una monitorización integral del sistema a través de los registros de un conjunto pequeño de monitores. Por ello, este nuevo método de optimización de medidores sería aplicable a operadores de redes que busquen disminuir los costes de instalación y operación del sistema de monitorización de los huecos de tensión. ABSTRACT I. GENERALITIES 1.1. Introduction Among the various types of electrical disturbances, voltage sags are considered the most common quality problem in power systems. This phenomenon is caused by an extreme increase of the current in the network, primarily caused by short-circuits or inadequate maneuvers in the system. This type of electrical disturbance is basically characterized by two parameters: residual voltage and duration. Typically, voltage sags occur when the residual voltage, in some phases, reaches a value between 0.01 to 0.9 pu and lasts up to 60 seconds. To an end user, the most important effect of a voltage sags is the interruption or alteration of their equipment operation, with electronic devices the most affected (e.g. computer, drive controller, PLC, relay, etc.). Due to the technology boom of recent decades and the constant search for automating production processes, the use of electronic components is essential today. This fact makes the effects of voltage sags more noticeable to the end user, causing the level of demand for a quality energy supply to be increased. In general, the study of voltage sags is usually approached from one of two aspects: the load or the network. From the point of view of the load, it is necessary to know the sensitivity characteristics of the equipment to model their response to sudden changes in power supply voltage. From the perspective of the network, the goal is to estimate or obtain adequate information to characterize the network behavior in terms of voltage sags. In this thesis, the work presented fits into the second aspect; that is, in the modeling and estimation of the response of a power system to voltage sag events. 1.2. Problem Statement Although voltage sags are the most frequent quality supply problem in electrical networks, thistype of disturbance remains complex and challenging to analyze properly. Among the most common reasons for this difficulty are: - The sag monitoring time, because it can take up to several years to get a statistically valid sample. - The limitation of funds for the acquisition and installation of sag monitoring equipment. - The high operating costs involved in the analysis of the voltage sag data from the installed monitors. - The restrictions that electrical companies have with the registered power quality data. That is, given the lack of data to further voltage sag analysis, it is of interest to electrical utilities and researchers to create reliable methods to deepen the study, estimation and monitoring of this electromagnetic phenomenon. Voltage sags, being mainly caused by random events such as short-circuits, are the result of various exogenous variables such as: (i) the number of faults of a system element, (ii) the impedance of the contact material, (iii) the fault type, (iv) the fault location, (v) the duration of the event, etc. That is, to properly raise any theoretical model of voltage sags, it is necessary to represent the combined uncertainty of variables to provide realistic methods that are reliable for users. 1.3. Objective This Thesis has been aimed at developing various stochastic methods for the study, estimation and monitoring of voltage sags in electrical power systems. Specifically, it has deepened the research in the following areas: - This research furthers knowledge in the realistic modeling of the variables that influence sag characterization. This thesis proposes a method to credibly represent the quantification and randomness of the sags in time by using parametric probability distributions. From this, a software tool was created to estimate the severity of voltage sags in a generic power system. - This research also analyzes the influence of the input variables in the estimation of voltage sags. In this case, the study has focused on the variables of greatest divergence in their characterization of the existing proposals. - A method was developed to estimate the number of voltage sags of an area without monitoring through the information of a limited set of sag monitors in an electrical system. To this end, the principles of Bayesian statistics are applied, estimating the number of sags most likely to happen in a system busbar based in records of other sag network busbars. - A strategy was developed to optimize the monitorization of voltage sags on a power system. Its purpose is to ensure the monitoring of the system through a number of monitors lower than the number of busbars of the network assessed. II. THESIS STRUCTURE To describe in detail the aforementioned proposals, this Thesis has been structured into six chapters. Below is are brief descriptions of them: As an introductory chapter, Chapter 1, provides a description of the approach and structure of this thesis. It presents a wide view of the problem to be treated, in addition to the description of the scope of each chapter. In Chapter 2, a brief description of the fundamental and general concepts of voltage sags is presented to provide to the reader a better understanding of the terms and indicators used in the severity analysis of voltage sags in power networks. Also, by way of background, a summary of the main features of existing techniques or methods used in the prediction and optimal monitoring of voltage sags is also presented. Chapter 3 essentially seeks to know the importance of the variables that determine the frequency or severity of voltage sags. To do this, a tool to estimate voltage sags is implemented that, through a predetermined set of experiments using the technique called Design of Experiments, discusses the importance of the parameters of the input variables of the model. Its analysis is interpreted by using the technique of analysis of variance (ANOVA), which provides mathematical rigor to establish whether the characterization of a particular variable affects the system response in terms of voltage sags or not. In Chapter 4, a methodology to predict the severity of voltage sags of an entire system through the sag logs of a reduced set of monitored busbars is proposed. For this, the Bayes conditional probability theorem is used, which calculates the most likely sag severity of the entire system from the information provided by the installed monitors. Also, in this chapter an important property of voltage sags is revealed, as is the correlation of the voltage sags events in several zones of a power system. In Chapter 5, two methods of optimal location of voltage sag monitors are developed. The first one is a methodological development of the observability criteria; it contributes to the realism of the sag pseudo-monitoring with which the optimal set of sag monitors is calculated and, therefore, to the reliability of the proposed method. As an alternative proposal, the correlation property of the sag events of a network is used to raise a method that establishes the sag severity of the entire system from a partial monitoring of the network. Finally, in Chapter 6, a brief description of the main contributions of the studies in this Thesis is detailed. Additionally, various themes to be developed in future works are described. III. RESULTS. Based on tests on the three networks presented, two IEEE test networks of 24 and 118 busbars (IEEE-24 and IEEE-118) and the electrical system of the Republic of Ecuador (EC-357), the following points present the most important observations: A. Estimation of voltage sags in the absence of measures: A stochastic estimation method of voltage sags, called PEHT, is implemented to represent with greater realism the long-term simulation of voltage sags events in a system. This first proposal of this thesis is considered a key step for the development of future methods of this work, as it emulates in a reliable manner the voltage sag long-term records in a generic network. Among the main innovations of this voltage sag estimation method are the following: - Consideration of the combined effect of five random input variables to simulate the events of voltage sags in long-term monitoring is included. The input variables modeled in the characterization of voltage sags on the PEHT are as follows: (i) fault coefficient, (ii) fault impedance, (iii) type of fault, (iv) location of the fault, and (v) fault duration. - Also included is the stochastic modeling of the input variables of fault impedance and duration in the characterization of the events of voltage sags. For the parameterization of these variables, a detailed study of the real behavior in power systems is developed. Also, the statistical function best suited to the random nature of each variable is defined. - Consideration of sag severity indicators used in standards as PEHT output variables, including such as indices as SARFI-X, SARFI-Curve, etc. B. Sensitivity analysis of voltage sags: A cause-effect study (sensitivity analysis) of the input variables of greatest divergence between reference parameterization related to the estimation of voltage sags in electrical networks is presented. Specifically, it delves into the study of the influence of the parameterization of the variables fault coefficient and fault impedance in the voltage sag estimation. Below is a summary of the most notable observations: - The accuracy of the input variable fault coefficient is shown as a non-influential parameter in the long-term estimation of the number of voltage sags (SARFI-90 and SARFI-70). That is, it does not require a high accuracy of the fault rate data of system elements for a proper voltage sag estimation. - The parameterization of the variable fault impedance is shown to be a very sensitive factor in the estimation of the voltage sag severity. For example, by increasing the average value of this random variable, the reported sag severity in the network significantly decreases. Moreover, in assessing the standard deviation of the fault impedance parameter, a direct relationship of this parameter with the voltage sag severity of the network is observed. That is, by increasing the fault impedance standard deviation, an increase of the average and the interannual variation of the SARFI-90 and SARFI-70 events is evidenced. - Based on the sensitivity analysis developed in the variable fault impedance, the omission of this variable in the voltage sag estimation would significantly call into question the reliability of the responses obtained. C. Voltage sag estimation from the information of a network partially monitored: A method that uses the voltage sag records of a partially monitored network for the sag estimation of all the power system is developed. From the case studies performed, it is observed that the method implemented (PEHT+MP) has the following characteristics: - The methodology proposed in the PEHT+MP combines the classical short-circuit theory with several statistical techniques to estimate, from data the of the installed sag meters, the sag measurements of unmonitored busbars of a generic power network. - The estimation process of voltage sags of the unmonitored zone of the network is based on the application of the conditional probability theorem of Bayes. That is, based on the observed data (monitored busbars records), the PEHT+MP calculates probabilistically the sag severity at unmonitored system busbars. Among the key parts of the proposed procedure are the following: (i) the creation of a realistic data base of voltage sags through of the sag estimation program (PEHT); and, (ii) the maximum likelihood criterion used to estimate the sag indices of system busbars without monitoring. - The voltage sag measurement estimations of PEHT+MP are potentiated by the correlation property of the sag events in power systems. This inherent characteristic of networks significantly limits the response of strongly correlated system zones to a possible voltage sag. As the PEHT+MP is based on probabilistic principles, a reduction of the range of possible sag measurements is reflected in a better sag estimation of the unmonitored area of the power system. - From the data of a set of monitors representing a relatively small portion of the system, to obtain accurate estimations (null error) of the sag severity zones without monitoring is feasible in the three networks studied. - The PEHT+MP can be applied to several types of sag indices, such as: SARFI-X, SARFI-Curve, SEI, etc. D. Optimal location of voltage sag monitors in power systems: Two methods for strategically locating the sag monitoring system are implemented for a generic network. The first proposal is a methodological development of the optimal location of sag monitors based on the observability criterion (LOM + OBS); the second proposal is a method that determines the sag monitor location according to the correlation area criterion (LOM+COR). Each proposed method of optimal location of sag monitors has a specific goal. In the case of LOM+OBS, the purpose of the method is to determine the optimal set of sag monitors to record all faults that originate voltage sags in the network. On the other hand, the LOM+COR method attempts to define the optimal location of sag monitors to estimate the sag indices in all the assessed network with the PEHT+MP application. From the development of the case studies of these methods of optimal location of sag monitors in the three networks raised, the most relevant observations are described below: - As the generation of voltage sag pseudo-measurements of the optimal location methods (LOM+OBS and LOM+COR) are obtained by applying the algorithm PEHT, the formulation of the optimization criterion is performed based on a realistic sag pseudo-monitoring, which considers the random nature of voltage sags through the five stochastic variables modeled in PEHT. This feature of the database of sag pseudo-measurements of the LOM+OBS and LOM+COR methods provides a greater reliability of the optimal set of monitors calculated when compared to similar methods in the bibliography. - The optimal set of sag monitors is determined by the network operator need. That is, if the goal is to record all faults that originate from voltage sags in the system, the observability criterion is used to determine the optimal location of sag monitors (LOM+OBS). Moreover, if the objective is to define a monitoring system that allows establishing the sag severity of the system from taken from information based on a limited set of sag monitors, the correlation area criterion would be appropriate (LOM+COR). Specifically, in the case of the LOM+OBS method (based on the observability criterion), the following properties were observed in the case studies: - By increasing the size of the network, there was observed a reduction in the percentage of monitored system busbars required. For example, to monitor all the faults which cause sags in the IEEE-24 network, then 100% of the system busbars are required for monitoring. In the case of the IEEE-118 and EC-357 networks, the method LOM+OBS determines that with monitoring 89.5 % and 65.3 % of the system, respectively, the observability criterion of the method would be fulfilled. - The LOM+OBS method calculates the probability of using the optimal set of sag monitors in the long term, establishing a relevance criterion of each sag monitor considered as optimal in the network. With this, the level of accuracy or observability (100%, 95%, etc.) can be determined, with which the faults that caused sags in the studied network are detected. That is, when the accuracy level for detecting faults that cause sags in the system is increased, a larger number of sag monitors is expected when calculating the optimal set of monitors. - The LOM + OBS method is demonstrated to be a technique applicable to any type of electrical system (radial or mesh), ensuring the detection of faults that cause voltage sags in a system according to the observability level raised. In the case of the optimal localization of sag monitors based on the criterion of correlation area (LOM+COR), several tests showed the following conclusions: - The procedure of LOM+COR method combines the implemented algorithms of voltage sag estimation (PEHT and PEHT+MP) with linear optimization techniques to define the optimal location of the sag monitors in a network. That is, the PEHT is used to generate the voltage sag pseudo-records, and, from the proposed optimization criterion (correlation area), the LOM+COR formulates and analytically calculates the optimal set of sag monitors of the network in the long term. From the information recorded by the optimal set of sag monitors, an accurate prediction of the voltage sag severity at all the busbars of the system is guaranteed with the PEHT+MP. - The LOM + COR method is shown to be a versatile optimization procedure, which reduces the size of the sag monitoring system both at radial as meshed grids. Due to its characteristics, this optimal location method allows emulation of complete system sag monitoring through the records of a small optimal set of sag monitors. Therefore, this new optimization method would be applicable to network operators that looks to reduce the installation and operation costs of the voltage sag monitoring system.