72 resultados para power plant

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The run-of-river hydro power plant usually have low or nil water storage capacity, and therefore an adequate control strategy is required to keep the water level constant in pond. This paper presents a novel technique based on TSK fuzzy controller to maintain the pond head constant. The performance is investigated over a wide range of hill curve of hydro turbine. The results are compared with PI controller as discussed in [1].

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Electrical Protection systems and Automatic Voltage Regulators (AVR) are essential components of actual power plants. Its installation and setting is performed during the commissioning, and it needs extensive experience since any failure in this process or in the setting, may entails some risk not only for the generator of the power plant, but also for the reliability of the power grid. In this paper, a real time power plant simulation platform is presented as a tool for improving the training and learning process on electrical protections and automatic voltage regulators. The activities of the commissioning procedure which can be practiced are described, and the applicability of this tool for improving the comprehension of this important part of the power plants is discussed. A commercial AVR and a multifunction protective relay have been tested with satisfactory results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The efficiency of a Power Plant is affected by the distribution of the pulverized coal within the furnace. The coal, which is pulverized in the mills, is transported and distributed by the primary gas through the mill-ducts to the interior of the furnace. This is done with a double function: dry and enter the coal by different levels for optimizing the combustion in the sense that a complete combustion occurs with homogeneous heat fluxes to the walls. The mill-duct systems of a real Power Plant are very complex and they are not yet well understood. In particular, experimental data concerning the mass flows of coal to the different levels are very difficult to measure. CFD modeling can help to determine them. An Eulerian/Lagrangian approach is used due to the low solid–gas volume ratio.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays increasing fuel prices and upcoming pollutant emission regulations are becoming a growing concern for the shipping industry worldwide. While fuel prices will keep rising in future years, the new International Convention for the Prevention of Pollution from Ships (MARPOL) and Sulphur Emissions Control Areas (SECA) regulations will forbid ships to use heavy fuel oils at certain situations. To fulfil with these regulations, the next step in the marine shipping business will comprise the use of cleaner fuels on board as well as developing new propulsion concept. In this work a new conceptual marine propulsion system is developed, based on the integration of diesel generators with fuel cells in a 2850 metric tonne of deadweight platform supply vessel. The efficiency of the two 250 kW methanol-fed Solid Oxide Fuel Cell (SOFC) system installed on board combined with the hydro dynamically optimized design of the hull of the ship will allow the ship to successfully operate at certain modes of operation while notably reduce the pollutant emissions to the atmosphere. Besides the cogeneration heat obtained from the fuel cell system will be used to answer different heating needs on board the vessel

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents results of the validity study of the use of MATLAB/Simulink synchronous-machine block for power-system stability studies. Firstly, the waveforms of the theoretical synchronous-generator short-circuit currents are described. Thereafter, the comparison between the currents obtained through the simulation model in the sudden short-circuit test, are compared to the theoretical ones. Finally, the factory tests of two commercial generating units are compared to the response of the synchronous generator simulation block during sudden short-circuit, set with the same real data, with satisfactory results. This results show the validity of the use of this generator block for power plant simulation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

El sistema de energía eólica-diesel híbrido tiene un gran potencial en la prestación de suministro de energía a comunidades remotas. En comparación con los sistemas tradicionales de diesel, las plantas de energía híbridas ofrecen grandes ventajas tales como el suministro de capacidad de energía extra para "microgrids", reducción de los contaminantes y emisiones de gases de efecto invernadero, y la cobertura del riesgo de aumento inesperado del precio del combustible. El principal objetivo de la presente tesis es proporcionar nuevos conocimientos para la evaluación y optimización de los sistemas de energía híbrido eólico-diesel considerando las incertidumbres. Dado que la energía eólica es una variable estocástica, ésta no puede ser controlada ni predecirse con exactitud. La naturaleza incierta del viento como fuente de energía produce serios problemas tanto para la operación como para la evaluación del valor del sistema de energía eólica-diesel híbrido. Por un lado, la regulación de la potencia inyectada desde las turbinas de viento es una difícil tarea cuando opera el sistema híbrido. Por otro lado, el bene.cio económico de un sistema eólico-diesel híbrido se logra directamente a través de la energía entregada a la red de alimentación de la energía eólica. Consecuentemente, la incertidumbre de los recursos eólicos incrementa la dificultad de estimar los beneficios globales en la etapa de planificación. La principal preocupación del modelo tradicional determinista es no tener en cuenta la incertidumbre futura a la hora de tomar la decisión de operación. Con lo cual, no se prevé las acciones operativas flexibles en respuesta a los escenarios futuros. El análisis del rendimiento y simulación por ordenador en el Proyecto Eólico San Cristóbal demuestra que la incertidumbre sobre la energía eólica, las estrategias de control, almacenamiento de energía, y la curva de potencia de aerogeneradores tienen un impacto significativo sobre el rendimiento del sistema. En la presente tesis, se analiza la relación entre la teoría de valoración de opciones y el proceso de toma de decisiones. La opción real se desarrolla con un modelo y se presenta a través de ejemplos prácticos para evaluar el valor de los sistemas de energía eólica-diesel híbridos. Los resultados muestran que las opciones operacionales pueden aportar un valor adicional para el sistema de energía híbrida, cuando esta flexibilidad operativa se utiliza correctamente. Este marco se puede aplicar en la optimización de la operación a corto plazo teniendo en cuenta la naturaleza dependiente de la trayectoria de la política óptima de despacho, dadas las plausibles futuras realizaciones de la producción de energía eólica. En comparación con los métodos de valoración y optimización existentes, el resultado del caso de estudio numérico muestra que la política de operación resultante del modelo de optimización propuesto presenta una notable actuación en la reducción del con- sumo total de combustible del sistema eólico-diesel. Con el .n de tomar decisiones óptimas, los operadores de plantas de energía y los gestores de éstas no deben centrarse sólo en el resultado directo de cada acción operativa, tampoco deberían tomar decisiones deterministas. La forma correcta es gestionar dinámicamente el sistema de energía teniendo en cuenta el valor futuro condicionado en cada opción frente a la incertidumbre. ABSTRACT Hybrid wind-diesel power systems have a great potential in providing energy supply to remote communities. Compared with the traditional diesel systems, hybrid power plants are providing many advantages such as providing extra energy capacity to the micro-grid, reducing pollution and greenhouse-gas emissions, and hedging the risk of unexpected fuel price increases. This dissertation aims at providing novel insights for assessing and optimizing hybrid wind-diesel power systems considering the related uncertainties. Since wind power can neither be controlled nor accurately predicted, the energy harvested from a wind turbine may be considered a stochastic variable. This uncertain nature of wind energy source results in serious problems for both the operation and value assessment of the hybrid wind-diesel power system. On the one hand, regulating the uncertain power injected from wind turbines is a difficult task when operating the hybrid system. On the other hand, the economic profit of a hybrid wind-diesel system is achieved directly through the energy delivered to the power grid from the wind energy. Therefore, the uncertainty of wind resources has increased the difficulty in estimating the total benefits in the planning stage. The main concern of the traditional deterministic model is that it does not consider the future uncertainty when making the dispatch decision. Thus, it does not provide flexible operational actions in response to the uncertain future scenarios. Performance analysis and computer simulation on the San Cristobal Wind Project demonstrate that the wind power uncertainty, control strategies, energy storage, and the wind turbine power curve have a significant impact on the performance of the system. In this dissertation, the relationship between option pricing theory and decision making process is discussed. A real option model is developed and presented through practical examples for assessing the value of hybrid wind-diesel power systems. Results show that operational options can provide additional value to the hybrid power system when this operational flexibility is correctly utilized. This framework can be applied in optimizing short term dispatch decisions considering the path-dependent nature of the optimal dispatch policy, given the plausible future realizations of the wind power production. Comparing with the existing valuation and optimization methods, result from numerical example shows that the dispatch policy resulting from the proposed optimization model exhibits a remarkable performance in minimizing the total fuel consumption of the wind-diesel system. In order to make optimal decisions, power plant operators and managers should not just focus on the direct outcome of each operational action; neither should they make deterministic decisions. The correct way is to dynamically manage the power system by taking into consideration the conditional future value in each option in response to the uncertainty.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The successful experience of the Jose Cabrera Nuclear Power Plant Interactive Graphical Simulator implementation in the Nuclear Engineering Department in the Universidad Polite´cnica de Madrid, for the Education and Training of nuclear engineers is shown in this paper. The paper starts with the objectives and the description of the Simulator Aula, and the methodology of work following the recommendations of the IAEA for the use of nuclear reactor simulators for education. The practices and material prepared for the students, as well as the operational and accident situations simulated are provided.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

With electricity consumption increasing within the UnitedStates, new paradigms of delivering electricity are required in order to meet demand. One promising option is the increased use of distributedpowergeneration. Already a growing percentage of electricity generation, distributedgeneration locates the power plant physically close to the consumer, avoiding transmission and distribution losses as well as providing the possibility of combined heat and power. Despite the efficiency gains possible, regulators and utilities have been reluctant to implement distributedgeneration, creating numerous technical, regulatory, and business barriers. Certain governments, most notable California, are making concerted efforts to overcome these barriers in order to ensure distributedgeneration plays a part as the country meets demand while shifting to cleaner sources of energy.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper, the dynamic response of a hydro power plant for providing secondary regulation reserve is studied in detail. Special emphasis is given to the elastic water column effects both in the penstock and the tailrace tunnel. For this purpose, a nonlinear model based on the analogy between mass and momentum conservation equations of a water conduit and those of wave propagation in transmission lines is used. The influence of the plant configuration and design parameters on the fulfilment of the Spanish Electrical System Operator requirements is analysed

Relevância:

70.00% 70.00%

Publicador:

Resumo:

HiPER is the European Project for Laser Fusion that has been able to join 26 institutions and signed under formal government agreement by 6 countries inside the ESFRI Program of the European Union (EU). The project is already extended by EU for two years more (until 2013) after its first preparatory phase from 2008. A large work has been developed in different areas to arrive to a design of repetitive operation of Laser Fusion Reactor, and decisions are envisioned in the next phase of Technology Development or Risk Reduction for Engineering or Power Plant facilities (or both). Chamber design has been very much completed for Engineering phase and starting of preliminary options for Reactor Power Plant have been established and review here.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

In this paper, the dynamic response of a hydro power plant for providing secondary regulation reserve is studied in detail. S pecial emphasis is given to the elastic water column effects both in the penstock and the tailrace tunnel. For this purpose, a nonline ar model based on the analogy between mass and momentum conservation equations of a water conduit and those of wave propagation in transmission lines is used. The influence of the plant configuration and design parameters on the fulfilment of the Spanish Electrical System Operator requirem ents is analysed.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Europe needs to restructure its energy system. The aim to decrease the reliance on fossil fuels to a higher dependence on renewable energy has now been imposed by The European Commission. In order to achieve this goal there is a great interest in Norway to become "The Green Battery of Europe". In the pursuit of this goal a GIS-tool was created to investigate the pump storage potential in Norway. The tool searches for possible connections between existing reservoirs and dams with the criteria selected by the user. The aim of this thesis was to test the tool and see if the results suggested were plausible, develop a cost calculation method for the PSH lines, and make suggestions for further development of the tool. During the process the tool presented many non-feasible pumped storage hydropower (PSH) connections. The area of Telemark was chosen for the more detailed study. The results were discussed and some improvements were suggested for further development of the tool. Also a sensitivity test was done to see which of the parameters set by the user are the most relevant for the PSH connection suggestion. From a range of the most promising PSH plants suggested by the tool, the one between Songavatn and Totak was chosen for a case study, where there already exists a power plant between both reservoirs. A new Pumped Storage Plant was designed with a power production of 1200 MW. There are still many topics open to discussion, such as how to deal with environmental restrictions, or how to deal with inflows and outflows of the reservoirs from the existing power plants. Consequently the GIS-tool can be a very useful tool to establish the best possible connections between existing reservoirs and dams, but it still needs a deep study and the creation of new parameters for the user.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Solar thermal power plants are usually installed in locations with high yearly average solar radiation, often deserts. In such conditions, cooling water required for thermodynamic cycles is rarely available. Moreover, when solar radiation is high, ambient temperature is very high as well; this leads to excessive condensation temperature, especially when air-condensers are used, and decreases the plant efficiency. However, temperature variation in deserts is often very high, which drives to relatively low temperatures during the night. This fact can be exploited with the use of a closed cooling system, so that the coolant (water) is chilled during the night and store. Chilled water is then used during peak temperature hours to cool the condenser (dry cooling), thus enhancing power output and efficiency. The present work analyzes the performance improvement achieved by night thermal cool storage, compared to its equivalent air cooled power plant. Dry cooling is proved to be energy-effective for moderately high day–night temperature differences (20 °C), often found in desert locations. The storage volume requirement for different power plant efficiencies has also been studied, resulting on an asymptotic tendency.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The supercritical Rankine power cycle offers a net improvement in plant efficiency compared with a subcritical Rankine cycle. For fossil power plants the minimum supercritical steam turbine size is about 450MW. A recent study between Sandia National Laboratories and Siemens Energy, Inc., published on March 2013, confirmed the feasibility of adapting the Siemens turbine SST-900 for supercritical steam in concentrated solar power plants, with a live steam conditions 230-260 bar and output range between 140-200 MWe. In this context, this analysis is focused on integrating a line-focus solar field with a supercritical Rankine power cycle. For this purpose two heat transfer fluids were assessed: direct steam generation and molten salt Hitec XL. To isolate solar field from high pressure supercritical water power cycle, an intermediate heat exchanger was installed between linear solar collectors and balance of plant. Due to receiver selective coating temperature limitations, turbine inlet temperature was fixed 550ºC. The design-point conditions were 550ºC and 260 bar at turbine inlet, and 165 MWe Gross power output. Plant performance was assessed at design-point in the supercritical power plant (between 43-45% net plant efficiency depending on balance of plantconfiguration), and in the subcritical plant configuration (~40% net plant efficiency). Regarding the balance of plant configuration, direct reheating was adopted as the optimum solution to avoid any intermediate heat exchanger. One direct reheating stage between high pressure turbine and intermediate pressure turbine is the common practice; however, General Electric ultrasupercritical(350 bar) fossil power plants also considered doubled-reheat applications. In this study were analyzed heat balances with single-reheat, double-reheat and even three reheating stages. In all cases were adopted the proper reheating solar field configurations to limit solar collectors pressure drops. As main conclusion, it was confirmed net plant efficiency improvements in supercritical Rankine line-focus (parabolic or linear Fresnel) solar plant configurations are mainly due to the following two reasons: higher number of feed-water preheaters (up to seven)delivering hotter water at solar field inlet, and two or even three direct reheating stages (550ºC reheating temperature) in high or intermediate pressure turbines. However, the turbine manufacturer should confirm the equipment constrains regarding reheating stages and number of steam extractions to feed-water heaters.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

En el campo de la fusión nuclear y desarrollándose en paralelo a ITER (International Thermonuclear Experimental Reactor), el proyecto IFMIF (International Fusion Material Irradiation Facility) se enmarca dentro de las actividades complementarias encaminadas a solucionar las barreras tecnológicas que aún plantea la fusión. En concreto IFMIF es una instalación de irradiación cuya misión es caracterizar materiales resistentes a condiciones extremas como las esperadas en los futuros reactores de fusión como DEMO (DEMOnstration power plant). Consiste de dos aceleradores de deuterones que proporcionan un haz de 125 mA y 40 MeV cada uno, que al colisionar con un blanco de litio producen un flujo neutrónico intenso (1017 neutrones/s) con un espectro similar al de los neutrones de fusión [1], [2]. Dicho flujo neutrónico es empleado para irradiar los diferentes materiales candidatos a ser empleados en reactores de fusión, y las muestras son posteriormente examinadas en la llamada instalación de post-irradiación. Como primer paso en tan ambicioso proyecto, una fase de validación y diseño llamada IFMIFEVEDA (Engineering Validation and Engineering Design Activities) se encuentra actualmente en desarrollo. Una de las actividades contempladas en esta fase es la construcción y operación de una acelarador prototipo llamado LIPAc (Linear IFMIF Prototype Accelerator). Se trata de un acelerador de deuterones de alta intensidad idéntico a la parte de baja energía de los aceleradores de IFMIF. Los componentes del LIPAc, que será instalado en Japón, son suministrados por diferentes países europeos. El acelerador proporcionará un haz continuo de deuterones de 9 MeV con una potencia de 1.125 MW que tras ser caracterizado con diversos instrumentos deberá pararse de forma segura. Para ello se requiere un sistema denominado bloque de parada (Beam Dump en inglés) que absorba la energía del haz y la transfiera a un sumidero de calor. España tiene el compromiso de suministrar este componente y CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) es responsable de dicha tarea. La pieza central del bloque de parada, donde se para el haz de iones, es un cono de cobre con un ángulo de 3.5o, 2.5 m de longitud y 5 mm de espesor. Dicha pieza está refrigerada por agua que fluye en su superficie externa por el canal que se forma entre el cono de cobre y otra pieza concéntrica con éste. Este es el marco en que se desarrolla la presente tesis, cuyo objeto es el diseño del sistema de refrigeración del bloque de parada del LIPAc. El diseño se ha realizado utilizando un modelo simplificado unidimensional. Se han obtenido los parámetros del agua (presión, caudal, pérdida de carga) y la geometría requerida en el canal de refrigeración (anchura, rugosidad) para garantizar la correcta refrigeración del bloque de parada. Se ha comprobado que el diseño permite variaciones del haz respecto a la situación nominal siendo el flujo crítico calorífico al menos 2 veces superior al nominal. Se han realizado asimismo simulaciones fluidodinámicas 3D con ANSYS-CFX en aquellas zonas del canal de refrigeración que lo requieren. El bloque de parada se activará como consecuencia de la interacción del haz de partículas lo que impide cualquier cambio o reparación una vez comenzada la operación del acelerador. Por ello el diseño ha de ser muy robusto y todas las hipótesis utilizadas en la realización de éste deben ser cuidadosamente comprobadas. Gran parte del esfuerzo de la tesis se centra en la estimación del coeficiente de transferencia de calor que es determinante en los resultados obtenidos, y que se emplea además como condición de contorno en los cálculos mecánicos. Para ello por un lado se han buscado correlaciones cuyo rango de aplicabilidad sea adecuado para las condiciones del bloque de parada (canal anular, diferencias de temperatura agua-pared de decenas de grados). En un segundo paso se han comparado los coeficientes de película obtenidos a partir de la correlación seleccionada (Petukhov-Gnielinski) con los que se deducen de simulaciones fluidodinámicas, obteniendo resultados satisfactorios. Por último se ha realizado una validación experimental utilizando un prototipo y un circuito hidráulico que proporciona un flujo de agua con los parámetros requeridos en el bloque de parada. Tras varios intentos y mejoras en el experimento se han obtenido los coeficientes de película para distintos caudales y potencias de calentamiento. Teniendo en cuenta la incertidumbre de las medidas, los valores experimentales concuerdan razonablemente bien (en el rango de 15%) con los deducidos de las correlaciones. Por motivos radiológicos es necesario controlar la calidad del agua de refrigeración y minimizar la corrosión del cobre. Tras un estudio bibliográfico se identificaron los parámetros del agua más adecuados (conductividad, pH y concentración de oxígeno disuelto). Como parte de la tesis se ha realizado asimismo un estudio de la corrosión del circuito de refrigeración del bloque de parada con el doble fin de determinar si puede poner en riesgo la integridad del componente, y de obtener una estimación de la velocidad de corrosión para dimensionar el sistema de purificación del agua. Se ha utilizado el código TRACT (TRansport and ACTivation code) adaptándalo al caso del bloque de parada, para lo cual se trabajó con el responsable (Panos Karditsas) del código en Culham (UKAEA). Los resultados confirman que la corrosión del cobre en las condiciones seleccionadas no supone un problema. La Tesis se encuentra estructurada de la siguiente manera: En el primer capítulo se realiza una introducción de los proyectos IFMIF y LIPAc dentro de los cuales se enmarca esta Tesis. Además se describe el bloque de parada, siendo el diseño del sistema de rerigeración de éste el principal objetivo de la Tesis. En el segundo y tercer capítulo se realiza un resumen de la base teórica así como de las diferentes herramientas empleadas en el diseño del sistema de refrigeración. El capítulo cuarto presenta los resultados del relativos al sistema de refrigeración. Tanto los obtenidos del estudio unidimensional, como los obtenidos de las simulaciones fluidodinámicas 3D mediante el empleo del código ANSYS-CFX. En el quinto capítulo se presentan los resultados referentes al análisis de corrosión del circuito de refrigeración del bloque de parada. El capítulo seis se centra en la descripción del montaje experimental para la obtención de los valores de pérdida de carga y coeficiente de transferencia del calor. Asimismo se presentan los resultados obtenidos en dichos experimentos. Finalmente encontramos un capítulo de apéndices en el que se describen una serie de experimentos llevados a cabo como pasos intermedios en la obtención del resultado experimental del coeficiente de película. También se presenta el código informático empleado para el análisis unidimensional del sistema de refrigeración del bloque de parada llamado CHICA (Cooling and Heating Interaction and Corrosion Analysis). ABSTRACT In the nuclear fusion field running in parallel to ITER (International Thermonuclear Experimental Reactor) as one of the complementary activities headed towards solving the technological barriers, IFMIF (International Fusion Material Irradiation Facility) project aims to provide an irradiation facility to qualify advanced materials resistant to extreme conditions like the ones expected in future fusion reactors like DEMO (DEMOnstration Power Plant). IFMIF consists of two constant wave deuteron accelerators delivering a 125 mA and 40 MeV beam each that will collide on a lithium target producing an intense neutron fluence (1017 neutrons/s) with a similar spectra to that of fusion neutrons [1], [2]. This neutron flux is employed to irradiate the different material candidates to be employed in the future fusion reactors, and the samples examined after irradiation at the so called post-irradiative facilities. As a first step in such an ambitious project, an engineering validation and engineering design activity phase called IFMIF-EVEDA (Engineering Validation and Engineering Design Activities) is presently going on. One of the activities consists on the construction and operation of an accelerator prototype named LIPAc (Linear IFMIF Prototype Accelerator). It is a high intensity deuteron accelerator identical to the low energy part of the IFMIF accelerators. The LIPAc components, which will be installed in Japan, are delivered by different european countries. The accelerator supplies a 9 MeV constant wave beam of deuterons with a power of 1.125 MW, which after being characterized by different instruments has to be stopped safely. For such task a beam dump to absorb the beam energy and take it to a heat sink is needed. Spain has the compromise of delivering such device and CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) is responsible for such task. The central piece of the beam dump, where the ion beam is stopped, is a copper cone with an angle of 3.5o, 2.5 m long and 5 mm width. This part is cooled by water flowing on its external surface through the channel formed between the copper cone and a concentric piece with the latter. The thesis is developed in this realm, and its objective is designing the LIPAc beam dump cooling system. The design has been performed employing a simplified one dimensional model. The water parameters (pressure, flow, pressure loss) and the required annular channel geometry (width, rugoisty) have been obtained guaranteeing the correct cooling of the beam dump. It has been checked that the cooling design allows variations of the the beam with respect to the nominal position, being the CHF (Critical Heat Flux) at least twice times higher than the nominal deposited heat flux. 3D fluid dynamic simulations employing ANSYS-CFX code in the beam dump cooling channel sections which require a more thorough study have also been performed. The beam dump will activateasaconsequenceofthe deuteron beam interaction, making impossible any change or maintenance task once the accelerator operation has started. Hence the design has to be very robust and all the hypotheses employed in the design mustbecarefully checked. Most of the work in the thesis is concentrated in estimating the heat transfer coefficient which is decisive in the obtained results, and is also employed as boundary condition in the mechanical analysis. For such task, correlations which applicability range is the adequate for the beam dump conditions (annular channel, water-surface temperature differences of tens of degrees) have been compiled. In a second step the heat transfer coefficients obtained from the selected correlation (Petukhov- Gnielinski) have been compared with the ones deduced from the 3D fluid dynamic simulations, obtaining satisfactory results. Finally an experimental validation has been performed employing a prototype and a hydraulic circuit that supplies a flow with the requested parameters in the beam dump. After several tries and improvements in the experiment, the heat transfer coefficients for different flows and heating powers have been obtained. Considering the uncertainty in the measurements the experimental values agree reasonably well (in the order of 15%) with the ones obtained from the correlations. Due to radiological reasons the quality of the cooling water must be controlled, hence minimizing the copper corrosion. After performing a bibligraphic study the most adequate water parameters were identified (conductivity, pH and dissolved oxygen concentration). As part of this thesis a corrosion study of the beam dump cooling circuit has been performed with the double aim of determining if corrosion can pose a risk for the copper beam dump , and obtaining an estimation of the corrosion velocitytodimension the water purification system. TRACT code(TRansport and ACTivation) has been employed for such study adapting the code for the beam dump case. For such study a collaboration with the code responsible (Panos Karditsas) at Culham (UKAEA) was established. The work developed in this thesis has supposed the publication of three articles in JCR journals (”Journal of Nuclear Materials” y ”Fusion Engineering and Design”), as well as presentations in more than four conferences and relevant meetings.