17 resultados para construction project

em Universidad Politécnica de Madrid


Relevância:

80.00% 80.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Este proyecto desarrolla una metodología de toma de datos y análisis para la optimización de la producción de la fase de avance de construcción del túnel de Seiró. Este túnel forma parte de las obras de construcción de la línea ferroviaria de alta velocidad corredor norte-noroeste a su paso por la provincia de Ourense. Mediante el análisis de diversos parámetros del diseño de la voladura, en la construcción de un túnel de 73 m2 de sección, en roca granítica, se pretende optimizar el tiempo de ciclo de excavación. Se estudia la variación de la fragmentación, el contorno y el avance obtenido y la influencia sobre estos parámetros del esquema de tiro y el tipo de cuele empleados y sus repercusiones en el tiempo de ciclo. El resultado del análisis concluye que el esquema de tiro óptimo, entre los usados, está formado por 112 barrenos de 51 mm de diámetro, con un cuele de 4 barrenos vacíos, que da lugar a mejores resultados de avance, contorno y fragmentación sin afectar negativamente al tiempo de ciclo. ABSTRACT This project develops a methodology for excavation cycle optimization by collecting and analyzing operational data for Seiró Tunnel construction site. This tunnel is included in construction project of high speed railway, located in N-NW direction, in Ourense province. Analyzing several blasting design parameters from the construction of a 73 m2 tunnel, in granitic rock, allows the optimization of cycle time. Variations in fragmentation, contour and advance length and influence about those parameters from blasting design und cut type used and its impact in the cycle time. Analysis results show up the best blasting design, among used, is formed of 112 holes 51 mm diameter, and a parallel cut with 4 empty holes. This configuration achieves the best fragmentation, contour and advance length without negative effects in time cycle

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Un proyecto de construcción de una estación de servicio requiere de un estudio de seguridad y salud para asegurar que los trabajos y tareas necesarios se realizan en las condiciones adecuadas, en cumplimiento al Real Decreto 1.627/1997, de 24 de Octubre, BOE número 256, 25 de Octubre de 1997 por el que se establecen disposiciones mínimas de seguridad y de salud en las obras de construcción. Dentro del procedimiento para realizar dicho estudio se procede a realizar una comprobación y enumeración de las distintas tareas que serán necesarias para la construcción, analizando el grado de riesgo que cada actividad presenta y, en función de estas, generar una serie de recomendaciones y normas para minimizar o eliminar dichos riesgos. Del estudio realizado se deduce que los trabajos presentan unos riesgos de baja probabilidad siempre que se mantenga un mínimo de atención y una actitud de prudencia y responsabilidad. ABSTRACT A service station construction project requires a safety and health study to ensure that necessary work and tasks are carried out in the right conditions, pursuant to Royal Decree 1.627/1997 of 24 October, BOE number 256, 25 October 1997 which establishes minimum requirements of safety and health in construction. Within the procedure to carry out this study proceeds to perform a check and enumeration of the various tasks which will be necessary for the construction, analyzing the degree of risk that each activity presents and, based on these, generating a series of recommendations and standards to minimize or eliminate these risks. From the study that has been done it can be determined that the work presents a low probability risks provided that a minimum of care and an attitude of prudence and responsibility..

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

El presente trabajo de Tesis Doctoral surge de la Figura de la Dirección Integrada de Proyecto en Edificación (“Project & Construction Management”) y su analisis de la situación regulatoria en la legislación española. El primer planteamiento fue pensar en la situación actual de esta figura en el contexto internacional, para analizar su repercusión en el sector de la edificación, lo cual me llevo a cabo las siguientes preguntas que he reuelto en esta investigación. ¿ Como surge el ¨Project & Construction Management”? ¿ Cuales son sus actividades, funciones y cometidos? ¿ Existe el ¨Project & Construction Management” en otros países? ¿Hay regulación del ¨Project & Construction Management” en esos paises? ¿Cómo es la regulación del ¨Project & Construction Management”? ¿Existe demanda del ¨Project & Construction Management” en España? ¿Cómo es esa demanda en España, y como se puede cuantificar? ¿Existe regulación del ¨Project & Construction Management” en España? ¿ Como debería ser la regulación del ¨Project & Construction Management” en España? Todas las preguntas anteriores las he ido respondiendo con el presente trabajo, llegando a una serie de respuestas, que están reflejadas en el desarrollo del presente trabajo y que resumo: - EL ¨Project & Construction Management” surge a principios del siglo XX en USA, desarrollándose como una disciplina con metodología propia y extendiéndose por otros países. - EL ¨Project & Construction Management” es una disciplina, basada en una metodología propia con herramientas y técnicas para organizar cualquier 14 proyecto de cualquier tipo, pero en este caso un proyecto de edificación, para lo cual he definido con todo detalle esta figura. - El origen del ¨Project & Construction Management” es anglosajón, concretamente en USA, extendiendose luego al Reino Unido, a Europa (Francia y Alemania), a Asia, a América del Sur y a Oceanía. - En todos los paises estudiados (Estados Unidos, Reino Unido, Francia y Alemania) existe una regulación sobre el ¨Project & Construction Management” que me ha servido de base comparativa para introducirla en España. - Hay muchas empresas en España (Nacionales e Internacionales) que ejercen su actividad dentro de este sector, por lo que para realizar un estudio más profundo, hice una muestra de las 30 empresas más significativas, prepare un cuestionario, dividido en 5 apartados: Organizativo, Sectorial, Cualitativo, Cuantitativo y Profesional para obtener una radiogradía de la situación real del sector, y así valorar cual es la importancia de este agente. - Estudié las posibles regulaciones del ¨Project & Construction Management” en España y no encontré ninguna. - El lugar idóneo para que se regule al ¨Project & Construction Management” es la Ley de Ordenación de la Edificación (LOE), ya que la jurisprudencia (sentencias de los tribunales de justicia españoles) le ha asimilado con los agentes de la LOE y se ha basado para absolver o condenar en la Ley de Ordenación de la Edificación. Por lo que el Objetivo fundamental de esta tesis ha sido regular la figura del ¨Project & Construction Management”, traducirla al Castellano, definirla y realizar una estructura de Agente de la Edificación, según la LOE, para poder introducirla dentro de la Legislación Española, con el objeto de mejorar la calidad de la edificación, proteger al usuario, estableciendo responsabilidades y garantías y proteger al ¨Project & Construction Management” de las responsabilidades solidarias. ABSTRACT This Doctoral Thesis figure emerges from the Integrated Building Project ("Project & Construction Management") and his analysis of the regulatory situation in the Spanish legislation. The first approach was to think of the current situation of this figure in the international context, to analyze its impact on the building sector, which I conducted the following questions that I have met in this research. - How did the “Project & Construction Management "? - What are your activities, functions and duties? - Is there a “Project & Construction Management "in other countries? - Is there regulation “Project & Construction Management "in these countries? - How is regulation of ¨ Project & Construction Management "? - Is there demand “Project & Construction Management "in Spain? - How is that demand in Spain, and as you can quantify? - Is there regulation “Project & Construction Management "in Spain? - How should regulation ¨Project & Construction Management "in Spain? All the above questions have been answered with this study, leading to a series of responses, which are reflected in the development of this study and are summarized: - The ¨ Project & Construction Management "comes early twentieth century in the USA, developed as a discipline with its own methodology and extending other countries. - The ¨ Project & Construction Management "is a discipline based on a metodology own tools and techniques to organize any project of any kind, but in this case a building project, for which I have defined in detail this figure. - The origin of ¨Project & Construction Management "is Anglo-Saxon, particularly in USA, then spreading to the UK, Europe (France and Germany), Asia, South America and Oceania. - In all countries studied (USA, UK, France and Germany) there is a regulation on ¨Project & Construction Management "has helped me to introduce comparative base in Spain. - There are many companies in Spain (National and International) who perform work within this sector, so for further study, I made a sample of the 30 most important companies, prepare a questionnaire, divided into five sections: Organizational , Sector, Qualitative, Quantitative and Professional radiography for a real situation of the sector, and thus assess which is the importance of this agent. - Study the possible regulations ¨Project & Construction Management "in Spain and found none. - The place to be regulated to ¨Project & Construction Management "is the Law of Construction Planning (LOE), as the case law (judgments of the courts Spanish) has assimilated LOE agents and has been based to absolve or condemn Law Construction Planning. So the objective of this thesis has been regular figure ¨ Project & Construction Management ", translated to spanish, define and perform an Agent structure of the Building, as the LOE, to enter into Spanish law, in order to improve the quality of the building, protecting the user, establishing responsibilities and guarantees and protect the ¨ Project & Construction Management "solidarity responsibilities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The European construction industry is supposed to consume the 40% of the natural European resources and to generate the 40% of the European solid waste. Conscious of the great damage being suffered by the environment because of construction activity, this work tries to provide the building actors with a new tool to improve the current situation. The tool proposed is a model for the comprehensive evaluation of construction products by determining their environmental level. In this research, the environmental level of a construction product has been defined as its quality of accomplishing the construction requirements needed by causing the minimum ecological impact in its surrounding environment. This information allows building actors to choose suitable materials for building needs and also for the environment, mainly in the project stage or on the building site, contributing to improve the relationship between buildings and environment. For the assessment of the environmental level of construction products, five indicators have been identified regarding their global environmental impact through the product life cycle: CO2 emissions provoked during their production, volume and toxicity of waste generated on the building site, durability and recycling capacity after their useful life. Therefore, the less environmental impact one construction product produces, the higher environmental level performs. The model has been tested in 30 construction products that include environmental criteria in their description. The results obtained will be discussed in this article. Furthermore, this model can lay down guidelines for the selection of ecoefficient construction products and the design of new eco-competitive and eco-committed ones

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is presented in CIB: Management and Innovation Sustainable Built Environment 2011, as the study and analysis of the residential model of a rural area from the Iberian Peninsula, specifically applied to the case of the province of Cáceres, in the autonomous region of Extremadura, in Spain. To this end, from a database made up of building projects whose real costs are known, it is intended to establish the links of the different parameters studied through the corresponding functions of statistical analysis. One of the main objectives of this process is constituted by the possibility of establishing those design variables of higher economic importance, so as to keep an economic control of these parameters, generally geometrical and typological, from the very start of the project. And, in general, a higher optimization of resources in the construction of dwellings in the rural environment from their design is intended.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The art of construction is a risky activity that directly affects the life and physical integrity of persons. Since the approval of Law 31/1995, of November 8, Prevention of Occupational Risks was the first legislation that established the current basis in all sectors and then transposed into Spanish law Directive 92/57/CEE called Royal Decree 1627/1997 of October 24, on minimum safety and health dispositions in construction works, measures have been proposed to develop a mixed body of scientific literature composed of researchers and professionals in the field of occupational safety and health, but even today there is still no clear and firm proposal, showing a lack of awareness in the occupational risk prevention and, therefore, a consolidation of the culture of prevention in society. Therefore, the technicians, who make up the building process, can incur in very high responsibilities, such as: Author of the project, Coordinator of Safety and Health during the preparation of the project and during the execution of works, Site Management: Site Manager. This involves the immediate creation of a general training in prevention for all architects starting when still studying, as well as specific training, appropriate and complementary to all the architects that will be devoted to the specialty of occupational safety and health in construction works. That is, first, we must make the responsible bodies aware of the urgent need to integrate risk prevention in the curricula of architecture and later in the continuing education of the profession. It is necessary that our teaching must conform to the laws on safety and health, due to the fact that the law recognizes our academic degrees and professional qualifications to perform functions in that area

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Software Product Line Engineering (SPLE) has proved to have significant advantages in family-based software development, but also implies the up¬front design of a product-line architecture (PLA) from which individual product applications can be engineered. The big upfront design associated with PLAs is in conflict with the current need of "being open to change". However, the turbulence of the current business climate makes change inevitable in order to stay competitive, and requires PLAs to be open to change even late in the development. The trend of "being open to change" is manifested in the Agile Software Development (ASD) paradigm, but it is spreading to the domain of SPLE. To reduce the big upfront design of PLAs as currently practiced in SPLE, new paradigms are being created, one being Agile Product Line Engineering (APLE). APLE aims to make the development of product-lines more flexible and adaptable to changes as promoted in ASD. To put APLE into practice it is necessary to make mechanisms available to assist and guide the agile construction and evolution of PLAs while complying with the "be open to change" agile principle. This thesis defines a process for "the agile construction and evolution of product-line architectures", which we refer to as Agile Product-Line Archi-tecting (APLA). The APLA process provides agile architects with a set of models for describing, documenting and tracing PLAs, as well as an algorithm to analyze change impact. Both the models and the change impact analysis offer the following capabilities: Flexibility & adaptability at the time of defining software architectures, enabling change during the incremental and iterative design of PLAs (anticipated or planned changes) and their evolution (unanticipated or unforeseen changes). Assistance in checking architectural integrity through change impact analysis in terms of architectural concerns, such as dependencies on earlier design decisions, rationale, constraints, and risks, etc.Guidance in the change decision-making process through change im¬pact analysis in terms of architectural components and connections. Therefore, APLA provides the mechanisms required to construct and evolve PLAs that can easily be refined iteration after iteration during the APLE development process. These mechanisms are provided in a modeling frame¬work called FPLA. The contributions of this thesis have been validated through the conduction of a project regarding a metering management system in electrical power networks. This case study took place in an i-smart software factory and was in collaboration with the Technical University of Madrid and Indra Software Labs. La Ingeniería de Líneas de Producto Software (Software Product Line Engi¬neering, SPLE) ha demostrado tener ventajas significativas en el desarrollo de software basado en familias de productos. SPLE es un paradigma que se basa en la reutilización sistemática de un conjunto de características comunes que comparten los productos de un mismo dominio o familia, y la personalización masiva a través de una variabilidad bien definida que diferencia unos productos de otros. Este tipo de desarrollo requiere el diseño inicial de una arquitectura de línea de productos (Product-Line Architecture, PLA) a partir de la cual los productos individuales de la familia son diseñados e implementados. La inversión inicial que hay que realizar en el diseño de PLAs entra en conflicto con la necesidad actual de estar continuamente "abierto al cam¬bio", siendo este cambio cada vez más frecuente y radical en la industria software. Para ser competitivos es inevitable adaptarse al cambio, incluso en las últimas etapas del desarrollo de productos software. Esta tendencia se manifiesta de forma especial en el paradigma de Desarrollo Ágil de Software (Agile Software Development, ASD) y se está extendiendo también al ámbito de SPLE. Con el objetivo de reducir la inversión inicial en el diseño de PLAs en la manera en que se plantea en SPLE, en los último años han surgido nuevos enfoques como la Ingeniera de Líneas de Producto Software Ágiles (Agile Product Line Engineering, APLE). APLE propone el desarrollo de líneas de producto de forma más flexible y adaptable a los cambios, iterativa e incremental. Para ello, es necesario disponer de mecanismos que ayuden y guíen a los arquitectos de líneas de producto en el diseño y evolución ágil de PLAs, mientras se cumple con el principio ágil de estar abierto al cambio. Esta tesis define un proceso para la "construcción y evolución ágil de las arquitecturas de lineas de producto software". A este proceso se le ha denominado Agile Product-Line Architecting (APLA). El proceso APLA proporciona a los arquitectos software un conjunto de modelos para de¬scribir, documentar y trazar PLAs, así como un algoritmo para analizar vel impacto del cambio. Los modelos y el análisis del impacto del cambio ofrecen: Flexibilidad y adaptabilidad a la hora de definir las arquitecturas software, facilitando el cambio durante el diseño incremental e iterativo de PLAs (cambios esperados o previstos) y su evolución (cambios no previstos). Asistencia en la verificación de la integridad arquitectónica mediante el análisis de impacto de los cambios en términos de dependencias entre decisiones de diseño, justificación de las decisiones de diseño, limitaciones, riesgos, etc. Orientación en la toma de decisiones derivadas del cambio mediante el análisis de impacto de los cambios en términos de componentes y conexiones. De esta manera, APLA se presenta como una solución para la construcción y evolución de PLAs de forma que puedan ser fácilmente refinadas iteración tras iteración de un ciclo de vida de líneas de producto ágiles. Dicha solución se ha implementado en una herramienta llamada FPLA (Flexible Product-Line Architecture) y ha sido validada mediante su aplicación en un proyecto de desarrollo de un sistema de gestión de medición en redes de energía eléctrica. Dicho proyecto ha sido desarrollado en una fábrica de software global en colaboración con la Universidad Politécnica de Madrid e Indra Software Labs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Teamwork, is one of the abilities that today is highly valued in the professional arena with a great importance for various personal and interpersonal skills associated with it. In this context, the Technical University of Madrid, is developing a coordinated educational innovation project, which main objective is to develop methodological and assessment tools for the acquisition of personal skills necessary to improve the employability of graduates and their skills for project management. Within this context, this paper proposes a methodology composed of various activities and indicators, as well as specific assessment instruments linked to the teamwork competence. Through a series of systematic steps it was allowed the design of an instrument and construction of a scale for measuring the competence of teamwork. The practical application of the methodology has been carried out in Projects lectures from different Schools of Engineering at the Technical University of Madrid, which results are presented in this document as a pilot experience. Results show the various aspects and methods that teachers should consider in evaluating the competence of the work, including analysis of the quality of results, through reliability and construct validity. On the other hand, show the advantages of applying this methodology in the field of project management teaching.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The new Spanish installation for fusion research (Technofusion) has been approved by both the national and regional governments. Funding up to 80-100 M€ will be invested in the construction of seven laboratories to cover many aspects relevant to fusion technology development. This work discusses their utility for inertial fusion research.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Technofusion project involves the construction of a relevant set of scientific technical facilities in Madrid, providing new tools to fusion energy community.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Desde los años 60, crece en Europa y Estados Unidos la preocupación y la necesidad de mejorar los procesos de gerencia de los proyectos de construcción al volverse estos más complejos. Esto ha llevado a la continua aparición de nuevos profesionales desde la fecha citada hasta nuestros días. De ahí la complejidad de conocer las cualidades de cada uno de ellos, así como las funciones a realizar o la formación que deben tener para poder desarrollar el puesto de trabajo según el papel que desempeñan para cada actividad. Muchos agentes son los que pueden intervenir en la edificación, muchas son las funciones que llevan a cabo estos agentes, muchas son las habilidades que se necesitan para realizar estas misiones, y una buena gestión de la edificación es la que hay que desarrollar para lograr el gran éxito. El presente trabajo fin de máster, dirigido a arquitectos, arquitectos técnicos, ingenieros, abogados, economistas y todos los profesionales del sector inmobiliario y de la construcción, trata de resolver todas aquellas dudas sobre los diferentes sujetos que estarán presentes desde la definición del proyecto en la fase inicial hasta el final de la obra, pasando por las fases de pre-construcción, construcción y post-construcción. (ENGLISH VERSION) Since the 1960s, most construction projects have become more and more complex, and new concerns and necessities related to the management of a project have been on the rise in Europe and in the United States. Thence, the need for more specialized professionals in the field has become a common fact, as well as the inclusion of new curricular subjects in most building engineering studies. There are different agents that play a relevant role in a building project; some of them are expected to perform a highly specialized set of functions that require specific management skills for the work to be successful. This research work—aimed mainly at engineers, quantity surveyors, lawyers, economists, real estate and construction professionals—shows the major implications of the building construction process including both pre-tender/construction and post-tender/construction stages as far as the main expert agents are involved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

La comparación de las diferentes ofertas presentadas en la licitación de un proyecto,con el sistema de contratación tradicional de medición abierta y precio unitario cerrado, requiere herramientas de análisis que sean capaces de discriminar propuestas que teniendo un importe global parecido pueden presentar un impacto económico muy diferente durante la ejecución. Una de las situaciones que no se detecta fácilmente con los métodos tradicionales es el comportamiento del coste real frente a las variaciones de las cantidades realmente ejecutadas en obra respecto de las estimadas en el proyecto. Este texto propone abordar esta situación mediante un sistema de análisis cuantitativo del riesgo como el método de Montecarlo. Este procedimiento, como es sabido, consiste en permitir que los datos de entrada que definen el problema varíen unas funciones de probabilidad definidas, generar un gran número de casos de prueba y tratar los resultados estadísticamente para obtener los valores finales más probables,con los parámetros necesarios para medir la fiabilidad de la estimación. Se presenta un modelo para la comparación de ofertas, desarrollado de manera que puede aplicarse en casos reales aplicando a los datos conocidos unas condiciones de variación que sean fáciles de establecer por los profesionales que realizan estas tareas. ABSTRACT: The comparison of the different bids in the tender for a project, with the traditional contract system based on unit rates open to and re-measurement, requires analysis tools that are able to discriminate proposals having a similar overall economic impact, but that might show a very different behaviour during the execution of the works. One situation not easily detected by traditional methods is the reaction of the actual cost to the changes in the exact quantity of works finally executed respect of the work estimated in the project. This paper intends to address this situation through the Monte Carlo method, a system of quantitative risk analysis. This procedure, as is known, is allows the input data defining the problem to vary some within well defined probability functions, generating a large number of test cases, the results being statistically treated to obtain the most probable final values, with the rest of the parameters needed to measure the reliability of the estimate. We present a model for the comparison of bids, designed in a way that it can be applied in real cases, based on data and assumptions that are easy to understand and set up by professionals who wish to perform these tasks.