44 resultados para bridge decks.
em Universidad Politécnica de Madrid
Resumo:
In this paper a summary of the methods presently used for optimization of prestressed concrete bridge decks is given. By means of linear optimization the sizes of the prestressing cables with a given fixed geometry are obtained. This simple procedure of linear optimization is also used to obtain the ‘best’ cable profile, by combining a series of feasible cable profiles. The results are compared with the ones obtained by other researchers. A step ahead in the field of optimization of prestressed bridge decks is the simultaneous search of the geometry and size of the prestressing cables. A non-linear programming for optimization is used, namely, ‘the steepest gradient method’. The results obtained are compared with the ones computed previously by means of linear programming techniques. Finally, the general problem of structural optimization is considered. This problem consists in finding the sizes and geometries of the prestressing cables as well as the longitudinal variation of the concrete section.
Resumo:
In this paper a method for automatic design of the prestress in continuous bridge decks is presented. In a first step of the procedure the optimal prestressed force for a completely geometrically defined and feasible prestress layout is obtained by means of linear programming techniques. Further on, in a second step the prestress geometry and minimum force are automatically found by steepest descent optimization techniques. Finally this methodology is applied to two-span continuous bridge decks and from the obtained results some preliminary design rules can be drawn.
Resumo:
An orthotropic rectangular plate is analysed. The plate has been considered simply supported in two opposite edges and general boundary conditions along the remainder edges. Matrix formulation, very convenient for programming on a digital computer, is used through the text. This technique is applied to an actual bridge deck and the results are compared with those obtained by means of the Guyon-Massonet-Rowe method
Resumo:
The yawing moment acting on the box-girder deck of reinforced concrete bridges constructed using the balanced cantilever method during the erection stage has been experimentally analyzed by testing different types of bridge cross-sections. Experimental results show that the yawing moment coefficient decreases as the bridge decks become streamlined, and that the yawing moment coefficient reaches a maximum when the bridge deck length is nearly twice the deck width.
Resumo:
The structural continuity of fully integral bridges entails many advantages and some drawbacks. Among the latter, the cyclic expansions and contractions of the deck caused by seasonal thermal variations impose alternating displacements at the piers and abutments, with effects that may be difficult to establish reliably. The advantages include easier construction and cheaper maintenance but, especially, horizontal loads can be transmitted to the ground in a much better way than in conventional bridges. This paper first presents a methodology for dealing with the problems that the cyclic displacements imposed raise at the abutments and at the bridge piers. At the former, large pressures may develop, possibly accompanied by undesirable surface settlements. At the latter, the degree of cracking and the ability to carry the specified loads may be in question. Having quantified the drawbacks, simplified but realistic analyses are conducted of the response of an integral bridge to braking and seismic loads. It is shown that integral bridges constitute an excellent alternative in the context of the requirements posed by new high-speed railway lines.
Resumo:
When an automobile passes over a bridge dynamic effects are produced in vehicle and structure. In addition, the bridge itself moves when exposed to the wind inducing dynamic effects on the vehicle that have to be considered. The main objective of this work is to understand the influence of the different parameters concerning the vehicle, the bridge, the road roughness or the wind in the comfort and safety of the vehicles when crossing bridges. Non linear finite element models are used for structures and multibody dynamic models are employed for vehicles. The interaction between the vehicle and the bridge is considered by contact methods. Road roughness is described by the power spectral density (PSD) proposed by the ISO 8608. To consider that the profiles under right and left wheels are different but not independent, the hypotheses of homogeneity and isotropy are assumed. To generate the wind velocity history along the road the Sandia method is employed. The global problem is solved by means of the finite element method. First the methodology for modelling the interaction is verified in a benchmark. Following, the case of a vehicle running along a rigid road and subjected to the action of the turbulent wind is analyzed and the road roughness is incorporated in a following step. Finally the flexibility of the bridge is added to the model by making the vehicle run over the structure. The application of this methodology will allow to understand the influence of the different parameters in the comfort and safety of road vehicles crossing wind exposed bridges. Those results will help to recommend measures to make the traffic over bridges more reliable without affecting the structural integrity of the viaduct
Resumo:
There are large numbers of business communities in India which neither had any formal education nor they took any professional training but still they contribute in successful business formation. Their presence can be felt in all areas of business. Still there is a big professional gap between the educational institutes, specially the B-Schools and this independent business community. With the help of this paper an effort is made to develop a Two-Way learning relationship for the mutual benefit of both entities. It will also highlight the role of an educational institute beyond academics for the well being of society. This may lead to derive and develop the exchange of innovative business ideas and framing the suitable policies for long term sustainability in today´s competitive arena. The study conducted by researcher with a sample size of 100 which includes a mix of well known academic professionals, MBA students and non academic business professionals has revealed that there is a need of an exchange program for the mutual benefits. There exists a big professional gap in this area which can be filled with the active and effective initiative by management institutes. An effort is made in this paper to highlight this gap and to suggest some framework to bridge the gap
Resumo:
Under-deck cable-stayed bridges are very effective structural systems for which the strong contribution of the stay cables under live loading allows for the design of very slender decks for persistent and transient loading scenarios. Their behaviour when subjected to seismic excitation is investigated herein and a set of design criteria are presented that relate to the type and arrangement of bearings, the number and configuration of struts, and the transverse distribution of stay cables. The nonlinear behaviour of these bridges when subject to both near-field and far-field accelerograms has been thoroughly investigated through the use of incremental dynamic analyses. An intensity measure that reflects the pertinent contributions to response when several vibration modes are activated was proposed and is shown to be effective for the analysis of this structural type. The under-deck cable-stay system contributes in a very positive manner to reducing the response when the bridges are subject to very strong seismic excitation. For such scenarios, the reduction in the stiffness of the deck because of crack formation, when prestressed concrete decks are used, mobilises the cable system and enhances the overall performance of the system. Sets of natural accelerograms that are compliant with the prescriptions of Eurocode 8 were also applied to propose a set of design criteria for this bridge type in areas prone to earthquakes. Particular attention is given to outlining the optimal strategies for the deployment of bearings
Resumo:
The advantages of tabled evaluation regarding program termination and reduction of complexity are well known —as are the significant implementation, portability, and maintenance efforts that some proposals (especially those based on suspension) require. This implementation effort is reduced by program transformation-based continuation call techniques, at some efficiency cost. However, the traditional formulation of this proposal by Ramesh and Cheng limits the interleaving of tabled and non-tabled predicates and thus cannot be used as-is for arbitrary programs. In this paper we present a complete translation for the continuation call technique which, using the runtime support needed for the traditional proposal, solves these problems and makes it possible to execute arbitrary tabled programs. We present performance results which show that CCall offers a useful tradeoff that can be competitive with state-of-the-art implementations.
Resumo:
The experimental results obtained in experiment “STACO” made on board the Spacelab D-2 are re-visited, with image-analysis tools not then available. The configuration consisted of a liquid bridge between two solid supporting discs. An expected breakage occurred during the experiment. The recorded images are analysed and the measured behaviour compared with the results of a three dimensional model of the liquid dynamics, obtaining a much better fit than with linear models
Resumo:
Die grafische Darstellung des Verbundquerschnittes mit einer oberen Betonplatte und einem darunter liegenden Stahlträger war seit seiner Vorstellung in den 1950er Jahren ein Symbol, das weit über die Theorie hinausging und weite Verbreitung in der Praxis des Verbundbrückenbaus fand. Seit den 1970er bzw. 1980er Jahren hat dieses Bild – bedingt durch neue und freiere Formen, Beton und Stahl miteinander zu kombinieren – seine Symbolhaftigkeit verloren. In Deutschland und Spanien wurde der Doppelverbund mit unten liegenden Betonplatten in Bereichen mit negativen Momenten eingeführt, in Frankreich werden Stahlträger auch in vorgespannten Betonquerschnitten eingebettet. Beide Ansätze haben dazu beigetragen, dass in der Gegenwart die Materialien Stahl und Beton im Verbundbau frei miteinander kombiniert werden können. On the development of sections in composite bridges. A comprehensive theory of composite construction was established in Germany by Sattler in 1953. The theoretical image of the composite section with a superior concrete slab and a lower metallic structure was shaped in addition to the analytical resolution. Theory and graphical representation were going to be known together in Europe. This figure was repeated in all theoretical and academic publications, so becoming an authentic icon of the composite section. Its translation to the bridge deck in flexion was obvious: the superior slab defines the tread platform, while the metallic structure was left off-hook at the bottom. Nevertheless, in continuous decks the section is not optimal at all in zones of negative bending moments. But the overcoming of the graphical representation of the theory did not happen immediately. It was produced after a process in which several European countries played an active role and where different mechanisms of technological transference were developed. One approach to this overcoming is the “double composite action”, with a lower concrete slab in areas of a negative bending moment. The first accomplishments, a bridge in Orasje built in 1968 with 134 m span, as well as the publications of the system proposed by Fabrizio de Miranda in 1971 did not extend nor had continuity. Spanish bridges by Fernández Ordoñez and Martínez Calzón used double composite action for the first time in 1979. The German team of Leonhard, Andrä und partners, has used it since the end of the 1980's to solve bridges of great span. Once the technology has been well known thanks to the ASCE International Congress and the Spanish International Meetings organised by the “Colegio de Ingenieros de Caminos”, double composite action has been integrated well into the structural vocabulary everywhere. In France the approach was different. What Michel Virlogeux calls “double floor composite section” was reached as an evolution of prestressed concrete bridges. In an experimental process widely known, the external prestressing allows weight reduction by diminishing the thickness of the concrete webs. The following step, in the 1980's, was the substitution of the webs by metallic elements: stiffened plates, trusses or folded plates. A direct result of this development is the Brass de la Plaine Bridge in the Reunion Island in 2001 with 280 m span. Both approaches have contributed to a freedom of design in composite construction in steel and concrete today.
Resumo:
Strong motion records obtained in instrumented short-span bridges show the importance of the abutments in the dynamic response of the structure. Existing models study the pier foundation influence but not the abutment performance. This work proposes two and three dimensional boundary element models in the frequency domain and studies the dimensionless dynamic stiffness of standard bridge abutments.
Resumo:
The soil-structure interaction at bridge abutments may introduce important changes in the dynamic properties of short to medium span bridges. The paper presents the results obtained, through the use of the Boundary Element Method (B.E.M.) technique in several typical situations, including semiinfinite and layered media. Both stiffness and damping properties are included.
Resumo:
A simplified model is proposed to show the importance that the dynamic soil-abutment interaction can have in the global behavior of bridges submitted to seismic loading. The modification of natural frequency and damping properties is shown in graphic form for typical short span bridges of the integral deck-abutment type for longitudinal vibrations or general ones for transverse vibrations.
Resumo:
The new highway M-410 in Madrid was constructed in the year 2007. This motorway near to Parla city crosses the road from Madrid to Toledo. To solve this crossing it was needed to constructed three bridges, the central with two spans over de existing motorway and the other two with one span at each side of the previous one. All the bridges where with deep foundations with piles of 1,00 m diameter separated 1,25 m.